X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-059-24374

Well Details

Well ID: 34-059-24374
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Warren Township
Operator Name: ECLIPSE RESOURCES I LP
Well Pad ID: US-OH-001036
Farm/Lease Name: WHEELER UNIT
License Status: Producing
License Date: 2014-07-24
Spud Date: 2014-09-07
Spud Drilling Contractor: H&P DRILLING
Final Drill Date: 2015-01-09
Well Total Depth: 14791.00 ft
Configuration: Horizontal
Latitude: 40.030000
Longitude: -81.230000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-05-20 Proposed Formations:TRENTON, Issued Date:5/20/2014, Expired Date:5/19/2016 12:00:00 PM, Drilling unit acres:691.049, Proposed Well Type:ST, Proposed Well Class:STRT
Correction to Well 2014-12-05 CHANGE IN PERMIT TYPE AND PERMIT NUMER PER INSPECTOR.
Reached Total Depth 2015-01-09
Correction to Well 2016-01-08 change in target/takepoint per as-drilled plat-ALE
Construction Permit Expires 2016-07-23
Completion Report Received 2016-12-14
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2016-12-14 7958 14659 0
7958 14659 0
7958 14659 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2016-07-10 H2O 0 305132 Gal 300400 Halliburton STAGE 1/44

48 SHOTS STAGES 2-43 SEE IMAGES

2016-07-25 H2O 15 193160 Gal 298800 Halliburton STAGE 44/44

36 SHOTS

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2016 ECLIPSE RESOURCES I LP 290332 36969 108
2017 ECLIPSE RESOURCES I LP 674661 37472 363
2018 ECLIPSE RESOURCES I LP 333786 8905 362
2019 ECLIPSE RESOURCES I LP 59049 1288 90

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2016 ECLIPSE RESOURCES I LP Brine 12329 108
2017 ECLIPSE RESOURCES I LP Brine 17922 363
2018 ECLIPSE RESOURCES I LP Brine 6145 362
2019 ECLIPSE RESOURCES I LP Brine 1114 90

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1017318309 2016-11-28 0:00 PW No Violations 0.50
-1285923918 2019-9-4 0:00:0 PW No Violations 0.30
-1312012983 2015-4-17 0:00: PL No Violations 0.20
-1684187646 2016-8-29 0:00: CT No Violations 1.00
-182723897 2015-3-6 0:00:0 DD No Violations 1.00
-2019505611 2020-6-4 0:00:0 PW No Violations 1.00
-2028404834 2016-10-13 0:00 PW No Violations 0.50
-747449268 2017-6-7 0:00:0 PW No Violations 0.30
0182723897 2015-03-06 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed Eclipse EHS Field Rep. Rocky King test the sumps for oilfield contaminates prior to release revealing chlorides of 105ppm and a pH of 7.
0530576384 2016-08-30 Completion Testing No Violations On the day of my inspection I witnessed that Deep Well Services Rig # 4 (DWS) completed drill out and were tripping out of the wellbore with plans to run 2.375 inch tubing later this evening. I completed a walk around with Consultant Will Ochampaugh revealing proper secondary containment was in place and maintained.
0582457074 2016-06-23 Completion Testing No Violations On the day of my inspection I met with Eclipse Completions Consultant Will Ochampaugh as Nine Wireline was completing a Radial Cement Bond-Variable Density Log with Gamma Ray-CCL and Temperature. The log was ran in water from a 8192 feet to surface revealing good cement throughout and 970 feet as the top of cement.
0589269234 2016-12-12 Production Wells No Violations On the day of my inspection I witnessed the well was equipped with Sweco wellheads and a plunger lift system. Gauges present read 2170 pounds per square inches on the casing and 1925 pounds per square inches on the tubing with annular pressure monitoring in place. Production equipment included a sand trap, a line heater, a GP unit and a 400 barrel purge tank within containment and shared with the 9H, 7H, 3H and the 1H. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF for sales.
0630516570 2016-08-23 Completion Testing No Violations On the day of my inspection I witnessed that Deep Well Services Rig # 4 was tripping in the wellbore with a 4.875 inch overshot to try to recover a fish which consisted of a 4.625 inch bit, a bit box and 3 feet of flex shaft that was twisted off to on 8/22/16 at 10500 feet while attempting to drill out the sixteenth plug.
0747449268 2017-06-07 Production Wells No Violations On the day of my inspection I witnessed the well was equipped with a plunger lift system with valves in the open position. Gauges present read 930 pounds per square inches on the casing and 660 pounds per square inches on the tubing with annular pressure monitoring in place. Production equipment included a sand trap, a line heater and a GP unit. Also present a 400 barrel purge tank within containment and a blow case skid both shared with the 9H, 7H, 3H and the 1H. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF for sales. Field testing of the sediment pond revealed a pH of 7 and chloride levels of 46 parts per million.
0889320733 2019-01-28 Production Wells No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with a plunger lift system with the production tubing opened and the production casing valves closed. The 13.375-inch surface casing had 0 pounds per square inch, the 9.625-inch intermediate had 0 pounds per square inch, the 5.5-inch diameter production casing had 600 pounds per square inch, and the 2.875-inch diameter production tubing had 370 pounds per square inch. The production equipment consisted of five sand traps, five gas production units, a blow case, and one 400-barrel tank. The produced gas and fluid are separated and then transferred to the Borton CGF for sales. Identification was located at each well and on the tank.
1017318309 2016-11-28 Production Wells No Violations On the day of my inspection I witnessed the well was equipped with Sweco wellheads and a plunger lift system. Gauges present read 2295 pounds per square inches on the casing and 2065 pounds per square inches on the tubing with annular pressure monitoring in place. Production equipment included a sand trap, a line heater, a GP unit and a 400 barrel purge tank within containment and shared with the 9H, 7H, 3H and the 1H. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF for sales.
1312012983 2015-04-17 Preliminary Restoration No Violations On the day of my inspection the site passed preliminary restoration according to ORC 1509.072A.
1376506660 2016-08-25 Completion Testing No Violations On the day of my inspection I witnessed that Deep Well Services Rig # 4 (DWS) was on their sixth trip and coming out of the wellbore with a 4.875 inch overshot. DWS was unsuccessful at recovering the fish which consisted of a 4.625 inch bit, a bit box and 3 feet of flex shaft that was twisted off to on 8/22/16 at 10500 feet while attempting to drill out the sixteenth plug. . I completed a walk around with Consultant Will Ochampaugh revealing proper secondary containment was in place and maintained.
1405781121 2016-09-27 Production Wells No Violations On the day of my inspection accompanied by ODNR Southeast Regional Manager Brent Bear, I witnessed the well was equipped with Sweco wellheads and a plunger lift system. Gauges present read 3290 pounds per square inches on the casing and 3050 pounds per square inches on the tubing with annular pressure monitoring in place. Production equipment included a sand trap, a line heater, a GP unit and a 400 barrel purge tank within containment and shared with the 9H, 7H, 3H and the 1H. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF for sales.
1684187646 2016-08-29 Completion Testing No Violations On the day of my inspection I witnessed that Deep Well Services Rig # 4 (DWS) successfully retrieved the fish on Sunday morning. DWS was currently drilling out the 25th plug at 11957 feet. I completed a walk around with Consultant Will Ochampaugh revealing proper secondary containment was in place and maintained.
1835669710 2014-12-28 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed that H&P Flex Rig #531 was drilling a 12.25 inch diameter hole at a depth of 4629 feet with a planned td of 7320 feet. Walk around with Company Man Neil Ingram revealed no violations but some minor erosion on the east side slope of pad. I made call to Eclipse and their plan is to address the issue once rig moves off in 2 weeks.
2028404834 2016-10-13 Production Wells No Violations On the day of my inspection I witnessed the well was equipped with Sweco wellheads and a plunger lift system. Gauges present read 2905 pounds per square inches on the casing and 2650 pounds per square inches on the tubing with annular pressure monitoring in place. Production equipment included a sand trap, a line heater, a GP unit and a 400 barrel purge tank within containment and shared with the 9H, 7H, 3H and the 1H. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF for sales.
2036421685 2014-09-08 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed Precision Rat Hole was drilling a 36 inch diameter hole at 81 feet with a planned td of 100 feet and 30 inch conductor cemented to follow.
530576384 2016-8-30 0:00: CT No Violations 1.00
582457074 2016-6-23 0:00: CT No Violations 3.00
589269234 2016-12-12 0:00 PW No Violations 0.50
630516570 2016-8-23 0:00: CT No Violations 1.00
889320733 2019-1-28 0:00: PW No Violations 0.30

For data sources see[9]

References