If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-075-23809 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.66,"lon":-81.99,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Holmes | |
Municipality: Prairie Township | |
Operator Name: H I SMITH OIL & GAS INC | |
Well Pad ID: | |
Farm/Lease Name: MATHANY IRENE M | |
License Status: Producing | |
License Date: 1982-06-22 | |
Spud Date: 1982-06-22 | |
Spud Drilling Contractor: TIMAX DRLG | |
Final Drill Date: 1982-08-11 | |
Well Total Depth: 3379.00 ft | |
Configuration: Vertical | |
Latitude: 40.660000 | |
Longitude: -81.990000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1982-06-22 | Issued Date 6/22/82 Expired Date 12/15/82 Acres 0070650 Tool Type CT Proposed Formation CLINTON Proposed Depth 03379 Proposed Drill Depth 03379 |
Original Spud | 1982-06-22 | |
Completed | 1982-08-11 | |
Reached Total Depth | 1982-08-11 | |
Construction Permit Expires | 1982-12-15 | |
Completion Report Received | 1983-01-19 | |
CO | 1983-02-01 | 511 SMITH H I OIL & GAS GeoDate 6/22/82 |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 3218 | 3298 | 15 |
3218 | 3298 | 15 | |
3218 | 3298 | 15 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 1320 Bbl | 21000 | FRAC: 1320 BBL H2O, 21M SAND |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | H I SMITH OIL & GAS INC | 10463.00 | 217.00 | 0 |
1985 | H I SMITH OIL & GAS INC | 9269.00 | 222.00 | 0 |
1986 | H I SMITH OIL & GAS INC | 3985.00 | 215.00 | 365 |
1987 | H I SMITH OIL & GAS INC | 3709.00 | 0.00 | 365 |
1988 | H I SMITH OIL & GAS INC | 3829.00 | 72.00 | 365 |
1989 | H I SMITH OIL & GAS INC | 3168.00 | 147.00 | 365 |
1990 | H I SMITH OIL & GAS INC | 2329.00 | 76.00 | 365 |
1991 | H I SMITH OIL & GAS INC | 2268.00 | 76.00 | 365 |
1992 | H I SMITH OIL & GAS INC | 2497.00 | 118.00 | 312 |
1993 | H I SMITH OIL & GAS INC | 2523.00 | 80.00 | 365 |
1994 | H I SMITH OIL & GAS INC | 2658.00 | 86.00 | 260 |
1995 | H I SMITH OIL & GAS INC | 2099.00 | 0.00 | 260 |
1996 | H I SMITH OIL & GAS INC | 1486.00 | 37.00 | 260 |
1997 | H I SMITH OIL & GAS INC | 1354.00 | 0.00 | 260 |
1998 | H I SMITH OIL & GAS INC | 825.00 | 0.00 | 260 |
1999 | H I SMITH OIL & GAS INC | 809.00 | 0.00 | 365 |
2000 | H I SMITH OIL & GAS INC | 918.00 | 0.00 | 365 |
2001 | H I SMITH OIL & GAS INC | 845.00 | 0.00 | 365 |
2002 | H I SMITH OIL & GAS INC | 808.00 | 0.00 | 365 |
2003 | H I SMITH OIL & GAS INC | 568.00 | 0.00 | 365 |
2004 | H I SMITH OIL & GAS INC | 678.00 | 0.00 | 365 |
2005 | H I SMITH OIL & GAS INC | 530.00 | 0.00 | 365 |
2006 | H I SMITH OIL & GAS INC | 166.00 | 0.00 | 365 |
2007 | H I SMITH OIL & GAS INC | 0.00 | 125.00 | 365 |
2008 | H I SMITH OIL & GAS INC | 539.00 | 0.00 | 188 |
2009 | H I SMITH OIL & GAS INC | 477.00 | 0.00 | 365 |
2010 | H I SMITH OIL & GAS INC | 463.00 | 0.00 | 365 |
2011 | H I SMITH OIL & GAS INC | 312.00 | 0.00 | 0 |
2012 | H I SMITH OIL & GAS INC | 284.00 | 34.00 | 366 |
2013 | H I SMITH OIL & GAS INC | 243.00 | 0.00 | 365 |
2014 | H I SMITH OIL & GAS INC | 181.00 | 0.00 | 365 |
2015 | H I SMITH OIL & GAS INC | 286.00 | 0.00 | 365 |
2016 | H I SMITH OIL & GAS INC | 175.00 | 0.00 | 365 |
2017 | H I SMITH OIL & GAS INC | 227.00 | 0.00 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-157924828 | 2018-10-31 0:00 | PW | No Violations | |
-1894414176 | 2012-7-24 0:00: | PW | No Violations | |
-1982213538 | 2016-5-26 0:00: | PW | No Violations | |
-504891425 | 2015-6-29 0:00: | PW | No Violations | |
-575876573 | 2014-5-1 0:00:0 | PW | No Violations | |
-782885217 | 2020-9-2 0:00:0 | PW | No Violations | 0.50 |
000PL15685 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
0157924828 | 2018-10-31 | Production Wells | No Violations | On the day of my inspection I found a 10 3/4-inch diameter casing, an 8 5/8-inch diameter casing, a 4 1/2-inch diameter casing, and 1 1/2-inch diameter tubing. The well is operated by a plunger lift system. The well was idle this day, the outlet valve is in the closed position. The production equipment is made up of one 100 bbl. steel tank, a vertical separator. The tank is properly identified. The production reporting is up to date. |
0244865417 | 2017-07-13 | Production Wells | No Violations | This is a producing plunger lift well. There were no problems noted at the time of the inspection. |
0504891425 | 2015-06-29 | Production Wells | No Violations | This is a producing plunger lift well. There were no problems noted at the time of the inspection. |
0575876573 | 2014-05-01 | Production Wells | No Violations | This is a producing plunger lift well. There were no problems noted at the time of the inspection. |
1120588540 | 2018-03-05 | Production Wells | No Violations | On the day of my inspection I found a 10 3/4 inch diameter casing, an 8 5/8 inch diameter casing, a 4 1/2 inch diameter casing, and 1 1/2 inch diameter tubing. The well is operated by a plunger lift system. The production equipment is made up of one 100 bbl. steel tank, a vertical separator, and a recording gauge. The tank is properly identified. The production reporting is up to date. |
1894414176 | 2012-07-24 | Production Wells | No Violations | This is a producing plunger lift well. There were no problems noted at time of the inspection. |
1982213538 | 2016-05-26 | Production Wells | No Violations | This is a producing plunger lift well. There were no problems noted at the time of the inspection. |
244865417 | 2017-7-13 0:00: | PW | No Violations | |
673950145 | 2020-4-28 0:00: | PW | No Violations | 0.50 |
8956714 | 2020-2-10 0:00: | PW | No Violations | 0.50 |
PL15685 | PL | No Violations |
For data sources see[9]