Well ID: 34-075-25589 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.61,"lon":-81.87,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Holmes | |
Municipality: Salt Creek Township | |
Operator Name: DEVON ENERGY PRODUCTION CO LP | |
Well Pad ID: | |
Farm/Lease Name: CRILOW FARMS | |
License Status: Final Restoration | |
License Date: 2012-08-01 | |
Spud Date: 2012-08-24 | |
Spud Drilling Contractor: BUTCHS RATHOLE & ANCHOR SERVI | |
Final Drill Date: 2012-08-26 | |
Well Total Depth: 92.00 ft | |
Configuration: Vertical | |
Latitude: 40.610000 | |
Longitude: -81.870000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2012-08-01 | Proposed Formations:BLACK RIVER, Issued Date:8/1/2012, Expired Date:8/1/2014 12:00:00 PM, Drilling unit acres:424.48, Proposed Well Type:ST, Proposed Well Class:STRT |
Reached Total Depth | 2012-08-26 | DRILLED CONDUCTOR HOLE AND SET CASING THEN DECIDED NOT TO PROCEED WITH DRILLING AS PERMITTED. P&A ON 12/7/2012 |
Plugged/Abandoned | 2012-12-07 | DRILLED CONDUCTOR HOLE AND SET CASING THEN DECIDED NOT TO PROCEED WITH DRILLING AS PERMITTED. P&A ON 12/7/2012 |
Completion Report Received | 2013-02-08 | DRILLED CONDUCTOR HOLE AND SET CASING THEN DECIDED NOT TO PROCEED WITH DRILLING AS PERMITTED. P&A ON 12/7/2012 |
Construction Permit Expires | 2014-08-01 | DRILLED CONDUCTOR HOLE AND SET CASING THEN DECIDED NOT TO PROCEED WITH DRILLING AS PERMITTED. P&A ON 12/7/2012 |
Record Last Modified | 2019-06-05 | DRILLED CONDUCTOR HOLE AND SET CASING THEN DECIDED NOT TO PROCEED WITH DRILLING AS PERMITTED. P&A ON 12/7/2012 |
For data sources see[2]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1228219998 | 2013-5-29 0:00: | FR | No Violations | |
-1681829801 | 2013-3-19 0:00: | FR | No Violations | |
0058069344 | 2013-04-03 | Final Restoration | No Violations | The location is being reclaimed. The pad area is more than 75% back to grade. |
0212864257 | 2013-05-06 | Final Restoration | No Violations | The location is to final grade and the topsoil has been spread. Seeding and mulching will take place this week. The sediment fence and other erosion control will remain in place until there is growth. |
0474006615 | 2012-12-12 | Final Restoration | No Violations | The pad removal has not yet started. The casing has not yet been cut off below ground level. Cellar protection is in place. |
0507412165 | 2013-07-18 | Final Restoration | No Violations | There has been hay made off the former location. The erosion control has been removed. Final restoration is passed. |
0546959239 | 2012-11-29 | Drill / Deepen / Reopen | No Violations | There are gates up at the entrance to the location and a fence is being constructed around the location. |
0594687467 | 2012-09-13 | Drill / Deepen / Reopen | No Violations | The location has been cut and leveled. The fabric has been put down and 3/4 of the location has been stoned. They are continuing to bring in stone. The erosion controls are in place and are working. |
1155916057 | 2013-06-18 | Final Restoration | No Violations | Good grasses growth over the whole location. The erosion control is still in place. |
1228219998 | 2013-05-29 | Final Restoration | No Violations | There is some grass growth. |
1347965127 | 2012-09-17 | Drill / Deepen / Reopen | No Violations | The pad is complete. Erosion control in place. |
1354883670 | 2012-12-07 | Plug / Plug Back | No Violations | This well was plugged and abandoned this date. The well had only had the conductor hole drilled and 82 of 20 conductor set. Petrocet plugged the 20 as well as the rat hole from top to bottom with class A cement . |
1359397717 | 2013-01-28 | Final Restoration | No Violations | Most all of the stone on the pad and entrance road have been removed. There is still some matting material on both to be removed but there are two dumpsters on location in which to put it. |
1369253287 | 2012-08-27 | Drill / Deepen / Reopen | No Violations | 20 conductor pipe was grouted back to surface. Drilled and cemented in 70 of rat hole. |
1500626500 | 2013-04-17 | Final Restoration | No Violations | The location is back to original grade. Some topsoil has been spread. No activity this date because it is too wet. |
1514599000 | 2013-02-12 | Final Restoration | No Violations | The conductor and rat hole pipe has been cut off and the 8 round cement cellar has been removed and the hole filled. The matting material that was under the stone has all been removed. There is equipment on location but no location reclamation has yet been started. |
1616950785 | 2013-05-20 | Final Restoration | No Violations | This location is at final grade and seeded and mulched. The existing erosion control will remain until there is good enough growth to prevent erosion. |
1681829801 | 2013-03-19 | Final Restoration | No Violations | Work continues as the weather allows. Approximately 2/3 of the location is back to grade, less the topsoil. |
1949891135 | 2012-08-26 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that Butchs Rat Hole Svc had drilled a 30 hole to 92 with an auger style rig. They ran 82 of 110lb/ft conductor casing, fitted with a float shoe/cement retainer. They stung into the float shoe with 3.5 casing. Petroset broke circulation, pumped 200 lbs gel, followed by 360 sx cement. Good circulation was maintained throughout the job. No cement was circulated to surface and the fluid level fell approximately 30 when the pump truck shut down. My recommendation to Jim Shamburger of Devon Energy was to let the cement set up, tag the cement top, and either grout it to surface or use ready-mix cement. |
212864257 | 2013-5-6 0:00:0 | FR | No Violations | |
474006615 | 2012-12-12 0:00 | FR | No Violations | |
507412165 | 2013-7-18 0:00: | FR | No Violations | |
546959239 | 2012-11-29 0:00 | DD | No Violations | |
58069344 | 2013-4-3 0:00:0 | FR | No Violations | |
594687467 | 2012-9-13 0:00: | DD | No Violations |
For data sources see[3]