X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-075-25592

Well Details

Well ID: 34-075-25592
Loading map...
Country: United States
State: Ohio
County: Holmes
Municipality: Hardy Township
Operator Name: BANDS GROUP LLC
Well Pad ID:
Farm/Lease Name: TRAILSIDE UNIT
License Status: Producing
License Date: 2012-12-04
Spud Date: 2013-04-09
Spud Drilling Contractor: MARIC DRILLING CO.
Final Drill Date: 2013-04-24
Well Total Depth: 5615.00 ft
Configuration: Vertical
Latitude: 40.560000
Longitude: -81.920000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-12-04 Proposed Formations:ROSE RUN, Issued Date:12/4/2012, Expired Date:12/4/2014 12:00:00 PM, Drilling unit acres:41.392, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2013-04-24
Completion Report Received 2013-08-16
Construction Permit Expires 2013-12-04
Change of Owner 2015-01-01 Operator changed from 30, BANDS CO INC to 9384, BANDS GROUP LLC
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2013-08-16 5460 57
5460 57
5460 57

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2013-06-12 ACID 15 3000 0 Producers Service Corporation

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2013 BANDS COMPANY INC 42308.00 517.00 200
2014 BANDS COMPANY INC 111328.00 1622.00 365
2015 BANDS GROUP LLC 90742.00 983.00 365
2016 BANDS GROUP LLC 79250.00 816.00 365
2017 BANDS GROUP LLC 76607.00 654.00 365
2018 BANDS GROUP LLC 77536.00 323.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 BANDS COMPANY INC Brine 2040 200
2014 BANDS COMPANY INC Brine 0 365
2015 BANDS GROUP LLC Brine 0 365
2016 BANDS GROUP LLC Brine 0 365
2017 BANDS GROUP LLC Brine 0 365
2018 BANDS GROUP LLC Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1122020913 2013-4-11 0:00: DD No Violations
-1218741798 2013-6-18 0:00: UP No Violations
-537562778 2017-6-12 0:00: PW No Violations
-579454969 2018-4-5 0:00:0 PW No Violations 1.00
-65868442 2013-4-18 0:00: UD No Violations
-667989257 2013-4-4 0:00:0 DD No Violations
-672425550 2013-4-10 0:00: DD No Violations
-686985921 2013-7-18 0:00: PL No Violations
-939695872 2013-5-6 0:00:0 UL No Violations
0065868442 2013-04-18 Urban Drill / Deepen / Reopen No Violations Drilling ahead at 3759 on fluid in the shale. There were no problems noted at the time of the inspection.
0180444004 2013-04-12 Drill / Deepen / Reopen No Violations The cement stayed up on the intermediate string. A long boomed trackhoe is on location removing the slipped earth from in and around the outer pit. A new reinforced liner is to be installed.
0244760626 2013-04-12 Drill / Deepen / Reopen No Violations The BOP was tested to 520 psig for over 15 minutes with no pressure drop. The pressure was released and both relief lines are open.
0537562778 2017-06-12 Production Wells No Violations This is a producing pump jack well. There were no problems noted at the time of the inspection.
0579454969 2018-04-05 Production Wells No Violations On the day of inspection I accompanied ODNR Inspector Randy Akins. See his report for details.
0604254342 2016-03-21 Production Wells No Violations This is a producing pump jack well. There were no problems noted at the time of the inspection.
0617607721 2015-02-09 Production Wells No Violations This is a producing pump jack well. There were no problems noted at the time of the inspection.
0660426209 2013-04-03 Drill / Deepen / Reopen No Violations The location is being cut.
0667989257 2013-04-04 Drill / Deepen / Reopen No Violations The pits are being dug.
0672425550 2013-04-10 Drill / Deepen / Reopen No Violations Ran 7 joints of 11-3/4 surface casing to 314. Petroset cemented with 350 sacks of class A cement. See the casing ticket for more details.
0686985921 2013-07-18 Preliminary Restoration No Violations The fence is being erected around the well and the tank battery as per the permit conditions. Preliminary Restoration is passed.
0904247604 2013-04-16 Drill / Deepen / Reopen No Violations Drilling ahead at 3076 on fluid. There were no problems noted at the time of the inspection.
0939695872 2013-05-06 UrbanPreliminary Restoration No Violations The second working pit, solidified on Thursday past, has been closed. The well head is fenced off.
1122020913 2013-04-11 Drill / Deepen / Reopen No Violations An intermediate string of 1008 of 8-5/8 casing was set and cemented this date. See the casing ticket for details.
1201063436 2013-06-11 Urban Drill / Deepen / Reopen No Violations Baker Hughes ran a cement bond log and found the top of the cement at 4904. The top perforation is at 5435 so the 500 cement requirement is met. Baker Hughes perforated 52 shots from 5435-5540
1218741798 2013-06-18 UrbanProduction Wells No Violations This is a producing pump jack well. There were no problems noted at the time of the inspection.
1364553416 2013-03-28 Drill / Deepen / Reopen No Violations Met with the drilling contractor, operator and the excavation contractor to discuss how the rig would be set up and where the drilling pits would be.
1365160837 2013-04-02 Drill / Deepen / Reopen No Violations The location is being cut.
1365503218 2013-04-08 Drill / Deepen / Reopen No Violations The drilling rig is being moved on and rigged up.
1365591639 2013-04-09 Drill / Deepen / Reopen No Violations Mix mud and spud. Drilling ahead at 105 on fluid. 102 of drift was encountered.
1366023640 2013-04-11 Drill / Deepen / Reopen No Violations Drilling ahead at 776 on fluid. Part of the hillside slid into the outer pit tearing the liner. The pit was not in use at the time of the slide. It will be repaired prior to use.
1366109690 2013-04-15 Drill / Deepen / Reopen No Violations Drilling ahead at 2601 on fluid. No problems noted at the time of the inspection.
1366223919 2013-04-17 Drill / Deepen / Reopen No Violations Drilling ahead at 3402 on fluid in the shale. Mixing potash.
1366639696 2013-04-19 Urban Drill / Deepen / Reopen No Violations Drilling ahead at 4134 on fluid in the shale. There were no problems noted at the time of the inspection.
1366798322 2013-04-23 Urban Drill / Deepen / Reopen No Violations Just back to drilling after repairing the mud pump. Drilling ahead at 5433 in the Gull River where there was a 300 unit gas show.
1366890454 2013-04-24 Urban Drill / Deepen / Reopen No Violations Ran 5589 of 4-1/2 10.5# casing set at 5597. Universal cemented with 125 sacks of Rose Run Blend. See the casing ticket for the details.
1367577734 2013-04-30 Preliminary Restoration No Violations The 1st working pit was solidified with 1 load of flyash.
1556728264 2019-05-01 Production Wells No Violations On day of my inspection I found an 8 5/8-inch diameter casing, a 4 1/2-inch diameter casing, and 2 3/8-inch diameter tubing. The well is operated by a pumping unit with an electric motor. The production equipment is made up of two 210 bbl. steel tanks, horizontal separator and a recording gauge. The tanks are properly identified. The production reporting is up to date
1566303977 2019-8-20 0:00: PW No Violations
1572522081 2019-10-31 0:00 PW No Violations
1577710364 2019-12-30 0:00 PW No Violations 0.30
1579869530 2020-1-24 0:00: PW No Violations 0.50
1583927230 2020-3-11 0:00: PW No Violations 0.50
1596627244 2020-8-5 0:00:0 PW No Violations 0.80
1600256447 2020-9-16 0:00: PW No Violations 0.50
1650037142 2013-04-22 Urban Drill / Deepen / Reopen No Violations Drilling ahead at 5208 in the Blackriver. No problems noted at the time of the inspeciton.
1691496555 2013-06-12 Drill / Deepen / Reopen No Violations Producers acidized this well with 3000 gals of HCL. See the stimulation report for details.
1697871007 2013-04-24 Urban Drill / Deepen / Reopen No Violations Reached a total depth of 5595 (driller) 5598 (logger). Running 4-1/2 casing.
180444004 2013-4-12 0:00: DD No Violations
1877128110 2013-06-13 UrbanProduction Wells No Violations This is a producing pump jack well. The permanent fencing will be installed next week. There were no problems noted at the time of the inspection
2005713275 2018-04-05 Production Wells No Violations On day of my inspection I found an 8 5/8 inch diameter casing, a 4 1/2 inch diameter casing, and 2 3/8 inch diameter tubing. The well is operated by a pumping unit with an electric motor. The production equipment is made up of two 210 bbl. steel tanks, horizontal separator and a recording gauge. The tanks are properly identified. The production reporting is up to date
244760626 2013-4-12 0:00: DD No Violations
604254342 2016-3-21 0:00: PW No Violations
617607721 2015-2-9 0:00:0 PW No Violations
660426209 2013-4-3 0:00:0 DD No Violations
904247604 2013-4-16 0:00: DD No Violations

For data sources see[9]

References