If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-081-20749 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.18,"lon":-80.8,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Jefferson | |
Municipality: Mount Pleasant Township | |
Operator Name: ASCENT RESOURCES UTICA LLC | |
Well Pad ID: US-OH-001528 | |
Farm/Lease Name: ELITE W MTP JF | |
License Status: Producing | |
License Date: 2018-02-05 | |
Spud Date: 2018-01-05 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2018-05-19 | |
Well Total Depth: 21667.00 ft | |
Configuration: Horizontal | |
Latitude: 40.180000 | |
Longitude: -80.800000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2017-12-13 | Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:12/13/2017, Expired Date:12/13/2019 12:00:00 PM, Drilling unit acres:227.06, Proposed Well Type:OG, Proposed Well Class:EOUT |
APP | 2018-02-05 | Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:2/5/2018, Expired Date:2/5/2020 12:00:00 PM, Drilling unit acres:556.204, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2018-05-19 | |
Correction to Well | 2018-09-14 | TAKE/TARGET AS-DRILLED PLAT |
Completion Report Received | 2018-10-29 | |
Record Last Modified | 2018-11-02 | |
Construction Permit Expires | 2020-02-05 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2018-11-01 | 9962 | 10103 | 0 |
2018-11-01 | 21397 | 21500 | 0 |
21397 | 21500 | 0 | |
9962 | 10103 | 0 | |
9962 | 10103 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 06/09/2018 | 08/06/2018 | 9656 | 14,989,300.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Ascent | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 88.2225 | 125,086,000.0 |
Unihib G | UPP | Acid inhibitor | Butyl diglycol | 112-34-5 | 75 | 0.000562423 | 797.427 | |
Alcohols, C10-16, ethoxylated | 68002-97-1 | 50 | 0.000374949 | 531.618 | ||||
Formaldehyde | 50-00-0 | 1 | 0.00000750 | 10.632 | ||||
Thiourea | 62-56-6 | 1 | 0.00000750 | 10.632 | ||||
Methanol | 67-56-1 | 5 | 0.00003749 | 53.162 | ||||
I-7L | UPP | Iron Control | Hydroxyacetic acid | 79-14-1 | 5 | 0.000249966 | 354.412 | |
Ethylene glycol | 107-21-1 | 20 | 0.000999863 | 1417.65 | ||||
Ammonium glycolate | 35249-89-9 | 20 | 0.000999863 | 1417.65 | ||||
Unislick CST-LA | UPP | Friction reducer | Water | 7732-18-5 | 55 | 0.0273824 | 38823.9 | |
Oleic Acid Diethanolamide | 93-83-4 | 3 | 0.00149358 | 2117.67 | ||||
Polyoxyethylene Sorbitan Monoleate | 9005-65-6 | 1 | 0.000497861 | 705.889 | ||||
Ammonium Chloride | 12125-02-9 | 2 | 0.000995722 | 1411.78 | ||||
Hydrotreated Petroleum Distillate | 64742-47-8 | 25 | 0.0124465 | 17647.2 | ||||
Alcohol Ethoxylate Surfactants | 68551-12-2 | 3 | 0.00149358 | 2117.67 | ||||
Sodium Chloride | 7647-14-5 | 15 | 0.00746791 | 10588.3 | ||||
CHEMPLEX-Polymer_00019 | Trade Secret | 25 | 0.0124465 | 17647.2 | ||||
Other Chemical(s) | Listed Above | See Trade Name(s) List | Alcohol Ethoxylate Surfactants | 68551-12-2 | 3 | 0.00149358 | 2117.67 | |
Hydrotreated Petroleum Distillate | 64742-47-8 | 25 | 0.0124465 | 17647.2 | ||||
Sodium Chloride | 7647-14-5 | 15 | 0.00746791 | 10588.3 | ||||
Water | 7732-18-5 | 55 | 0.0273824 | 38823.9 | ||||
Alcohols, C10-16, ethoxylated | 68002-97-1 | 50 | 0.000374949 | 531.618 | ||||
Water | 7732-18-5 | 44.3 | 0.00857276 | 12154.8 | ||||
Formaldehyde | 50-00-0 | 1 | 0.00000750 | 10.632 | ||||
Oleic Acid Diethanolamide | 93-83-4 | 3 | 0.00149358 | 2117.67 | ||||
Methanol | 67-56-1 | 5 | 0.00003749 | 53.162 | ||||
DETA phosphonate | 15827-60-8 | 5 | 0.00106559 | 1510.85 | ||||
Hydroxyacetic acid | 79-14-1 | 5 | 0.000249966 | 354.412 | ||||
Thiourea | 62-56-6 | 1 | 0.00000750 | 10.632 | ||||
Polyoxyethylene Sorbitan Monoleate | 9005-65-6 | 1 | 0.000497861 | 705.889 | ||||
Polyethylene glycol | 7732-18-5 | 50 | 0.0096758 | 13718.8 | ||||
Hexamethylene Triamine Penta(Methylene Phosphonic Acid) | 34690-00-1 | 5 | 0.00106559 | 1510.85 | ||||
Ammonium Chloride | 12125-02-9 | 2 | 0.000995722 | 1411.78 | ||||
Ethylene glycol | 107-21-1 | 20 | 0.000999863 | 1417.65 | ||||
Scale Inhibitor E | UPP | Scale Inhibitor | Hexamethylene Triamine Penta(Methylene Phosphonic Acid) | 34690-00-1 | 5 | 0.00106559 | 1510.85 | |
DETA phosphonate | 15827-60-8 | 5 | 0.00106559 | 1510.85 | ||||
Copolymer of Maleic and Acrylic Acid | 52255-49-9 | 20 | 0.00426238 | 6043.38 | ||||
HCL Acid (7.5%) | UPP | Acidizing | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0691688 | 98070.6 | |
Sand | UPP | Proppant | Crystalline Silica in the form of Quartz | 14808-60-7 | 99.9 | 10.7307 | 15,214,500.0 | |
HCL Acid (15%) | UPP | Acidizing | Hydrochloric Acid | 7647-01-0 | 15 | 0.00263805 | 3740.34 | |
K-Bac 1005 | UPP | Biocide | 2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 5.8 | 0.00111465 | 1580.4 | |
Water | 7732-18-5 | 44.3 | 0.00857276 | 12154.8 | ||||
Polyethylene glycol | 7732-18-5 | 50 | 0.0096758 | 13718.8 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2018-08-06 | H2O | 15 | 4922 Bbl | 231341 | Universal Well Services Inc. | STAGE 66/66
STAGES 2-65 SEE IMAGES |
2018-06-02 | H2O | 15 | 5619 Bbl | 230767 | Halliburton | STAGE 1/66
STAGES 2-65 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | ASCENT RESOURCES UTICA LLC | 3038705 | 0 | 115 |
2019 | ASCENT RESOURCES UTICA LLC | 2252133 | 0 | 84 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | ASCENT RESOURCES UTICA LLC | Brine | 22759 | 115 |
2019 | ASCENT RESOURCES UTICA LLC | Brine | 8826 | 84 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1135181976 | 2018-8-6 0:00:0 | CT | No Violations | 1.00 |
-1426547660 | 2018-7-24 0:00: | CT | No Violations | 1.00 |
-1611147385 | 2018-7-18 0:00: | CT | No Violations | 1.00 |
-1664252633 | 2018-8-29 0:00: | PW | No Violations | 1.00 |
-1845807659 | 2018-5-25 0:00: | DD | No Violations | 0.50 |
-375822053 | 2018-8-15 0:00: | CT | No Violations | 1.00 |
-983235787 | 2018-1-30 0:00: | CS | No Violations | 5.00 |
0123352038 | 2018-08-22 | Completion Testing | No Violations | On the day of my inspection I witnessed Stone 15 rig on location. ID to company man James Edwards. All of the frac plugs have been driled out of this well and they shut it in on 8-19. At that time the 5.5 inch diameter casing had 3500 psi on it. This well will be produced through the casing and they did not run tubing. At this time there is no production casing pressure gauge on the well. Surface annular pressure is 100 psi and intermediate annular pressure is 550 psi. |
0375822053 | 2018-08-15 | Completion Testing | No Violations | On the day of my inspection I witnessed Deep Well rig 11 was on location on the 5H well. ID to company man James Edwards. Surface annular pressure was 100 psi and intermediate annular pressure was 500 psi. Frac plugs have not been drilled out. |
0539066546 | 2018-06-28 | Completion Testing | No Violations | On the day of my inspection I witnessed Universal frac crew onsite preparing to begin stimulations on this pad. This well has 66 stages. The stimulation should start today with the 1H well. Intermediate annular pressure is 600 psi. |
0682957738 | 2018-08-01 | Completion Testing | No Violations | On the day of my inspection I was accompanied by DOGRM inspector Bob Roush. ID to company men Bub Rucker and Brady. Universal frac crew is onsite. Intermediate annular pressure is 470 psi. Stage 52/66 has plug set at 12578, bottom perforation at 12567, and top perforation at 12426. Perforated with 5 guns, 4 shots, on 35 foot spacing. |
0714017807 | 2018-05-17 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Patterson 584 was not drilling. They have reached total depth at 21667 feet. Wyoming casing is onsite running 5.5 inch diameter production casing. Location is clean and containment is functioning as designed. |
0983235787 | 2018-01-30 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed the surface casing cement job. Falcon 26 drilled a 17.5 inch diameter open hole to a depth of 1632 feet. Previous casing set and cemented was 18.625 inch diameter mine string casing to a depth of 310 feet. Wyoming Casing ran 1624 feet of 13.375 inch diameter casing, j-55, 61 lbs/foot, with a 4 foot stick up. Casing was centralized with 14centralizers. Shoe track is 44 feet long. O-tex was onsite with 1370 sacks of class H cement. Additives include 1.5% CaCl, 0.2% X-air, and .25 lb./sack cello-flake. Cement weighed with mudscale at 15.6 ppg and yield of 1.2. 50% excess ran in open hole. Cement displaced with 240 barrels of fresh water. 35 barrels of gel pumped ahead of cement. 84 barrels of cement returned to surface, and floats held with 0.5 barrels back. |
1135181976 | 2018-08-06 | Completion Testing | No Violations | On the day of my inspection I witnessed Universal Frac crew onsite. Stimulation has been completed on this pad. Wireline was in the 5H well setting a kill plug. First kill plug in this well is at 9563. Second kill plug has not been set but company man Brady estimates it will be approximately 150 feet above the first plug. |
1145372242 | 2018-07-03 | Completion Testing | No Violations | On the day of my inspection I found a universal frac crew rigged up to this well, as well as permits 20748 and 20750. They will begin stimulation on stage 6 of this well next. Surface annular pressure is 0 and intermediate annular pressure is 920 psi. |
123352038 | 2018-8-22 0:00: | CT | No Violations | 1.00 |
1426547660 | 2018-07-24 | Completion Testing | No Violations | On the day of my inspection I witnessed Universal frac crew onsite. Currently the wireline and frac companies are shut down for maintenance. Stage 21/63 is next for this well. Plug is at 18239, bottom perforation at 18227, and top perforation at 18122. Surface annular pressure is 0 and intermeidate annular pressure is 530. |
1517238249 | 2018-01-29 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Falcon 26 had drilled out below the 18.625 inch diameter mine string shoe. New hole drilled from 324 feet down to 350 feet. Casing shoe at 310 feet. During my inspection the casing was already filled with fluid and I watched it for 30 minutes. No fluid loss noted. Rig was advised to procede. |
1611147385 | 2018-07-18 | Completion Testing | No Violations | On the day of my inspection I found Universal frac crew on location. This well is on stage 28 out of 66. Plug is at 16802, bottom perforation at 16791, and top perforation is at 16650. Surface annular pressure is 0 and intermediate is 700. Currently stimulating this well. |
1664252633 | 2018-08-29 | Production Wells | No Violations | On the day of my inspection I identified myslef to Construction Consultant Denny Bird. This pad has 3 wells on it. Activity onsite includes building of flowlines and setting production equipment. Wells do not have gauges on surface or intermediate annuli at this time. They are working on bring the above grade. Production equipment includes two 500 barrel steel tanks in their own containment, three GPUs,three line heaters and six sand traps. Wells do not have tubing and will produce through production casing. Flowlines are plumbed from both sides on the wellheads. |
1845807659 | 2018-05-25 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found a crew cleaning up the pad. Patterson 584 has moved off location. Company man Tony Shepard onsite. |
1910474695 | 2018-05-08 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Patterson 584 tripping out of the hole around 10000 feet to pick up their lateral assembly. Walked around location and found pad was clean and nothing was off containment. Pad drains are shut and no flare noted. |
300740893 | 2019-8-14 0:00: | PL | No Violations | 1.00 |
539066546 | 2018-6-28 0:00: | CT | No Violations | 1.00 |
682957738 | 2018-8-1 0:00:0 | CT | No Violations | 1.00 |
714017807 | 2018-5-17 0:00: | DD | No Violations | 1.00 |
For data sources see[10]