X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-099-22918

Well Details

Well ID: 34-099-22918
Loading map...
Country: United States
State: Ohio
County: <County>
Municipality:
Operator Name: AM-TEK OIL INC
Well Pad ID:
Farm/Lease Name: WWW LAND CO UNIT
License Status: Producing
License Date: 2001-10-29
Spud Date: 2002-03-18
Spud Drilling Contractor: CAPSTAR DRILLING
Final Drill Date: 2002-03-22
Well Total Depth: 5082.00 ft
Configuration: Vertical
Latitude: 41.120000
Longitude: -80.680000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2001-10-29 1902 DUCK CREEK ENERGY INC Proposed Formation ORISKANY/CLINTON Issued Date 10/29/2001 Expired Date 10/29/2002 6:00:00 AM
Original Spud 2002-03-18 Surface hole drilled on fresh water mud. Encountered sand from 10 to 20 feet. New 20# pipe. Pits lined. Good cement returns. Cement stayed up.
Completed 2002-03-22 Surface hole drilled on fresh water mud. Encountered sand from 10 to 20 feet. New 20# pipe. Pits lined. Good cement returns. Cement stayed up.
Reached Total Depth 2002-03-22 Surface hole drilled on fresh water mud. Encountered sand from 10 to 20 feet. New 20# pipe. Pits lined. Good cement returns. Cement stayed up.
Completion Report Received 2002-05-10 Surface hole drilled on fresh water mud. Encountered sand from 10 to 20 feet. New 20# pipe. Pits lined. Good cement returns. Cement stayed up.
Construction Permit Expires 2002-10-29 Surface hole drilled on fresh water mud. Encountered sand from 10 to 20 feet. New 20# pipe. Pits lined. Good cement returns. Cement stayed up.
Correction to Well 2004-03-05 CHANGE IN FOOTAGE INFORMATION: 1440'NL & 7530'WL OF TWP. X= 2,500,230 Y= 538,240
Record Last Modified 2015-09-24 Surface hole drilled on fresh water mud. Encountered sand from 10 to 20 feet. New 20# pipe. Pits lined. Good cement returns. Cement stayed up.

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2002-06-26 3280 3290 40
2002-06-26 4878 4984 42
3280 3290 40
4878 4984 42
3280 3290 40

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
ACID 15 500 Gal 0
H2O 0 0 0

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2002 DUCK CREEK ENERGY INC 8463.00 211.00 365
2003 DUCK CREEK ENERGY INC 16733.00 290.00 365
2004 DUCK CREEK ENERGY INC 38532.00 298.00 365
2005 DUCK CREEK ENERGY INC 31288.00 164.00 365
2006 DUCK CREEK ENERGY INC 23744.00 162.00 365
2007 DUCK CREEK ENERGY INC 11828.00 132.00 365
2008 DUCK CREEK ENERGY INC 8143.00 72.00 365
2009 DUCK CREEK ENERGY INC 6527.00 136.00 365
2010 DUCK CREEK ENERGY INC 13274.00 64.00 365
2011 DUCK CREEK ENERGY INC 12030.00 65.00 365
2012 DUCK CREEK ENERGY INC 6723.00 45.00 366
2013 DUCK CREEK ENERGY INC 3247.00 38.00 365
2014 DUCK CREEK ENERGY INC 3905.00 39.00 365
2015 DUCK CREEK ENERGY INC 1367.00 0.00 365
2016 DUCK CREEK ENERGY INC 333.00 15.00 365
2017 DUCK CREEK ENERGY INC 273.00 0.00 365
2018 DUCK CREEK ENERGY INC 1537.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2002 DUCK CREEK ENERGY INC Brine 235 365
2003 DUCK CREEK ENERGY INC Brine 122 365
2004 DUCK CREEK ENERGY INC Brine 77 365
2005 DUCK CREEK ENERGY INC Brine 22 365
2006 DUCK CREEK ENERGY INC Brine 0 365
2007 DUCK CREEK ENERGY INC Brine 25 365
2008 DUCK CREEK ENERGY INC Brine 40 365
2009 DUCK CREEK ENERGY INC Brine 40 365
2010 DUCK CREEK ENERGY INC Brine 38 365
2011 DUCK CREEK ENERGY INC Brine 41 365
2012 DUCK CREEK ENERGY INC Brine 30 366
2013 DUCK CREEK ENERGY INC Brine 0 365
2014 DUCK CREEK ENERGY INC Brine 15 365
2015 DUCK CREEK ENERGY INC Brine 0 365
2016 DUCK CREEK ENERGY INC Brine 10 365
2017 DUCK CREEK ENERGY INC Brine 0 365
2018 DUCK CREEK ENERGY INC Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1032721033 2018-5-31 0:00: PW No Violations 0.20
001216i319 2002-03-27 pl No Violations Rig done drilling and moved out. No problem with the drilling pits. Obtained GPS coordinates.
001216i397 2002-04-19 Preliminary Restoration No Violations Pits are now closed. Not in production as yet.
0072977592 2002-07-25 Preliminary Restoration No Violations Meets requiements.
0979955740 2009-09-15 Production Wells No Violations I walked around the tank battery and the wellhead and found that there were no violations at this time.
1032721033 2018-05-31 Production Wells No Violations The purpose of my inspection was to conduct a status check on well #2-2918. RBDMS indicated reported production was current. Access to the well and tank battery remained drivable and stable through a metal recycler. A chain-link fence enclosure was present around the well head. No identification was present. The 8.625 well head was at grade. The 4.5 production casing was equipped with a plunger lift assembly. Production valves were in the open position. No leaks were observed. The tank battery was shared with #2-2917 and #2-2919. A stable earthen dike that was free of fluid was present around the production equipment. A locked chain-link fence enclosure with correct identification was present on top of the dike. Equipment on location consisted of one (2) vertical separators and two (2) steel production tanks. The separators remained in good repair. One meter box was present. The production tanks remained in good repair. Valves were closed and plugged. I will contact the operator to request the posting of identification at the well head.
1216i319 2002-3-27 0:00: pl No Violations 0.50
1216i397 2002-4-19 0:00: PL No Violations 0.20
72977592 2002-7-25 0:00: PL No Violations 0.50
979955740 2009-9-15 0:00: PW No Violations

For data sources see[9]

References