If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-099-22940 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.12,"lon":-80.68,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: AM-TEK OIL INC | |
Well Pad ID: | |
Farm/Lease Name: BRIER HILL SLAG UNIT | |
License Status: Producing | |
License Date: 2003-04-14 | |
Spud Date: 2003-05-13 | |
Spud Drilling Contractor: CAPSTAR DRILLING | |
Final Drill Date: 2003-05-17 | |
Well Total Depth: 5054.00 ft | |
Configuration: Vertical | |
Latitude: 41.120000 | |
Longitude: -80.680000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2003-04-14 | 1902 DUCK CREEK ENERGY INC Proposed Formation ORISKANY & CLINTON Issued Date 4/14/2003 Expired Date 4/13/2004 6:00:00 AM |
Inspector Comments Cement Job | 2003-05-13 | Surface drilled on air. Made water in the Berea. When drilling the conductor hole went through a cement slab an into soft material before finding solid material at 30'. During mixing and displacing of the cement all returns went down the outside of the conductor and never flowed to the drilling pit. Cement returns began when the wiper plug was released. Dry cement left on site to be used to seal the top.Cement Ticket Notes Inspector Reporting |
Original Spud | 2003-05-13 | RBDMS Rec |
Completed | 2003-05-17 | RBDMS Rec |
Reached Total Depth | 2003-05-17 | RBDMS Rec |
Completion Report Received | 2003-08-20 | RBDMS Rec |
Construction Permit Expires | 2004-04-13 | RBDMS Rec |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2003-10-10 | 3278 | 3288 | 40 |
2003-10-10 | 4870 | 4949 | 54 |
3278 | 3288 | 40 | |
4870 | 4949 | 54 | |
3278 | 3288 | 40 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 15 | 78000 Gal | 0 | 500 GALLONS HCL ACID | ||
ACID | 15 | 1000 Gal | 0 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2003 | DUCK CREEK ENERGY INC | 0.00 | 0.00 | 0 |
2004 | DUCK CREEK ENERGY INC | 76233.00 | 220.00 | 365 |
2005 | DUCK CREEK ENERGY INC | 59186.00 | 186.00 | 365 |
2006 | DUCK CREEK ENERGY INC | 34694.00 | 320.00 | 365 |
2007 | DUCK CREEK ENERGY INC | 18531.00 | 66.00 | 365 |
2008 | DUCK CREEK ENERGY INC | 20826.00 | 128.00 | 365 |
2009 | DUCK CREEK ENERGY INC | 19568.00 | 0.00 | 365 |
2010 | DUCK CREEK ENERGY INC | 22158.00 | 108.00 | 365 |
2011 | DUCK CREEK ENERGY INC | 18471.00 | 79.00 | 365 |
2012 | DUCK CREEK ENERGY INC | 17235.00 | 92.00 | 366 |
2013 | DUCK CREEK ENERGY INC | 16037.00 | 0.00 | 365 |
2014 | DUCK CREEK ENERGY INC | 13495.00 | 101.00 | 365 |
2015 | DUCK CREEK ENERGY INC | 5466.00 | 0.00 | 365 |
2016 | DUCK CREEK ENERGY INC | 7235.00 | 0.00 | 365 |
2017 | DUCK CREEK ENERGY INC | 5432.00 | 120.00 | 365 |
2018 | DUCK CREEK ENERGY INC | 2614.00 | 70.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2003 | DUCK CREEK ENERGY INC | Brine | 150 | 0 |
2004 | DUCK CREEK ENERGY INC | Brine | 60 | 365 |
2005 | DUCK CREEK ENERGY INC | Brine | 0 | 365 |
2006 | DUCK CREEK ENERGY INC | Brine | 0 | 365 |
2007 | DUCK CREEK ENERGY INC | Brine | 0 | 365 |
2008 | DUCK CREEK ENERGY INC | Brine | 70 | 365 |
2009 | DUCK CREEK ENERGY INC | Brine | 132 | 365 |
2010 | DUCK CREEK ENERGY INC | Brine | 0 | 365 |
2011 | DUCK CREEK ENERGY INC | Brine | 39 | 365 |
2012 | DUCK CREEK ENERGY INC | Brine | 75 | 366 |
2013 | DUCK CREEK ENERGY INC | Brine | 70 | 365 |
2014 | DUCK CREEK ENERGY INC | Brine | 0 | 365 |
2015 | DUCK CREEK ENERGY INC | Brine | 0 | 365 |
2016 | DUCK CREEK ENERGY INC | Brine | 0 | 365 |
2017 | DUCK CREEK ENERGY INC | Brine | 0 | 365 |
2018 | DUCK CREEK ENERGY INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1472054808 | 2009-9-15 0:00: | PW | No Violations | |
0228486512 | 2003-05-14 | Drill / Deepen / Reopen | No Violations | Arrived on site and found that all the casing had been run into the hole. Observed the cement job. |
1054748026 | 2003-06-04 | Production Wells | No Violations | Well has been completed. Pits are holding their contents. No violations this date. |
1090940917 | 2004-07-22 | Preliminary Restoration | No Violations | Meets requirements. |
1472054808 | 2009-09-15 | Production Wells | No Violations | I walked around the tank battery and the wellhead and found that there were no violations at this time. |
228486512 | 2003-5-14 0:00: | DD | No Violations | 2.00 |
For data sources see[9]