X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-099-23199

Well Details

Well ID: 34-099-23199
Loading map...
Country: United States
State: Ohio
County: Mahoning
Municipality: Poland Township
Operator Name: HILCORP ENERGY COMPANY
Well Pad ID: US-OH-000748
Farm/Lease Name: POLAND-CLL2
License Status: Producing
License Date: 2013-07-17
Spud Date: 2013-07-15
Spud Drilling Contractor: FALCON DRLG
Final Drill Date: 2014-01-13
Well Total Depth: 12931.00 ft
Configuration: Horizontal
Latitude: 41.010000
Longitude: -80.530000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-07-17 Proposed Formations:POINT PLEASANT, Issued Date:7/17/2013, Expired Date:7/17/2015 12:00:00 PM, Drilling unit acres:2417.17, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2014-01-13
Construction Permit Expires 2014-07-17
Correction to Well 2015-02-13 CHANGE IN SURFACE, TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
Completion Report Received 2016-06-15
Record Last Modified 2017-10-23

For data sources see[2]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 HILCORP ENERGY COMPANY 390505 0 190
2015 HILCORP ENERGY COMPANY 303519 0 302
2016 HILCORP ENERGY COMPANY 164504 0 332
2017 HILCORP ENERGY COMPANY 158292 0 361
2018 HILCORP ENERGY COMPANY 200509 0 362
2019 HILCORP ENERGY COMPANY 44116 0 90

For data sources see[3] [4]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 HILCORP ENERGY COMPANY Brine 15123 190
2015 HILCORP ENERGY COMPANY Brine 12043 302
2016 HILCORP ENERGY COMPANY Brine 11166 332
2017 HILCORP ENERGY COMPANY Brine 6821 361
2018 HILCORP ENERGY COMPANY Brine 14000 362
2019 HILCORP ENERGY COMPANY Brine 2892 90

For data sources see[5] [6]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1049455171 2014-5-6 0:00:0 PW No Violations 1.00
-1050022492 2014-3-5 0:00:0 DD No Violations 1.00
-1204512953 2014-6-9 0:00:0 PW No Violations 1.00
-1281755671 2013-7-30 0:00: DD No Violations 3.00
-1285219269 2013-8-1 0:00:0 DD No Violations 1.00
-1315170692 2018-6-27 0:00: PW No Violations 1.00
-275205810 2018-11-6 0:00: PW No Violations 1.00
-333375519 2014-1-21 0:00: DD No Violations 2.00
-496470658 2016-1-20 0:00: PW No Violations 1.00
-59943111 2013-7-18 0:00: DD No Violations 2.00
-978444835 2014-1-31 0:00: DD No Violations 1.00
0059943111 2013-07-18 Drill / Deepen / Reopen No Violations Hilcorp Drilling Supervisor requested that we have a pre-spud meeting with all personal that will be evolved in drilling the wells on the Poland CLL-2 pad. There is a total of 6 wells. Falcone Drilling Rig 18 will start moving in on 7/22/2013. Teresa McQuade , Ken Brown from the permitting department and my self attented this meeting. I ask that they give me a 4 hour notice of all cementing and also any safety or evironmental problems.
0220434936 2013-07-24 Urban Drill / Deepen / Reopen No Violations I performed a status check on the above location. Falcone Drilling is setting up there drilling rig (#18) on the above location all contimanite and berms are in place. I was accompanied by Theresa McQuade and Mallory Stanton from the permitting office on this inspection.
0275205810 2018-11-06 Production Wells No Violations I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There is also One compressor and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. There was no pressure on the annuals at this time. They installed a 2 line from their high pressure system and hooked it up to 5.5 and using that to move fluid up the tubing. There is 600 psi on the line. This is controlled by a pressure regulator.
0333375519 2014-01-21 Drill / Deepen / Reopen No Violations I performed an inspection on the above location. The rig is in the process of moving. Water trucks and vacuum trucks are on location power washing the rig. No violations noted at this time.
0370597208 2013-07-08 Drill / Deepen / Reopen No Violations Location is complete waiting on Express Energy to start the conductor holes. All permits have been posted.
0390552398 2014-12-26 Production Wells No Violations I performed a status check on the above location. The well is in production. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time.
0496470658 2016-01-20 Production Wells No Violations I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 400 barrels tanks. There is also 2 compressors and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system.
0537145379 2013-07-22 Drill / Deepen / Reopen No Violations I was on location and meet with Hilcorps Drilling Supervisor and Falcone Drillings Supervisor. At this time they are installing containment and rig matts. All drilling equipment, frac tanks, fuel tanks will be on containment and bermed. All permits are posted in the company house for this (6) well multi pad. 3409923199 /3197 /3200 /3198 /3196 /3192.
0904174992 2014-06-11 Administrative Inspection No Violations I was on location with Geologist Mike McCormac and Geologist Teresa McQuade from the ODNR Columbus Office and also Adam Mullet a production personal from Hilcorp. Adam was explaining how the Gas Production Units ( GPU ) measured the gas and fluids before it went to the central production facility. The production facility is where the gas enters the sales point and the water and oil/condensate is collected.
0962028234 2014-01-13 Drill / Deepen / Reopen No Violations H&P 225 Rig has drilled to a depth of 12981. At this time they are running 5.5 production casing. They will call when they are ready for cementing. The rig is in the process of rigging down and moving.
0978444835 2014-01-31 Drill / Deepen / Reopen No Violations Northeast Region Supervisor Tom Hill and myself performed a status check on the above location. They are preparing the location and wellhead for fracing. There has been a 2 welded steel flow line installed and is caped with a blind flanged. No noted violations were noted at this time.
1049455171 2014-05-06 Production Wells No Violations I performed a status check on the above location. The well is equipped with one GPU production unit. The well is equipped with 2 7/8 tubing. ID signs are posted. No noted violations were noted at this time. Preliminary Restoration can not be passed at this time.
1050022492 2014-03-05 Drill / Deepen / Reopen No Violations Universal Well Service is fracing the above location. All equipment is setting inside of containment. Safety lanes are marked. All annuals are monitored. No noted violations noted at this time.
1072747535 2013-07-19 Drill / Deepen / Reopen No Violations Express Energy Service is on location drilling a 30 conductor hole to a depth of 90 and ran 90 of 20 94# conductor casing. They cemented with 172 sacks of class A cement. They had 13 barrels of cement returned to surface. . Permits are posted. There has been safety meeting. No violations at this time.
1143973893 2019-12-3 0:00: PW No Violations 1.00
1204512953 2014-06-09 Production Wells No Violations On 6/9/2014. After receiving the approval to produce dated 6/6/2014. Hilcop Energy started turning the above well into production. I was on location to observe this operation. There were various Hilcorp personal on location. Turn on was completed with out incident. Equipment is set up with various safety shut downs.
1266813236 2013-07-25 Drill / Deepen / Reopen No Violations I performed a status check on the above location. Falcone Drilling Rig #18 is in place to start drilling, due to not getting all of the equipment to install the gas buster there will not start drilling until it is fully operational. Permits are posted. Containment has been installed around the fuel tanks and frac tanks.
1281755671 2013-07-30 Drill / Deepen / Reopen No Violations Baker Hughes is on location to perform the BOP test and the 13 3/8 casing integrity test. There is a chart graph on file.
1285219269 2013-08-01 Drill / Deepen / Reopen No Violations I performed a status check on the above location. All containment is good, location is clear of debris. Falcone Rig was at a depth of 1480. No violation were noted at this time.
1315170692 2018-06-27 Production Wells No Violations I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There is also One compressor and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system.
1377616899 2013-07-29 Drill / Deepen / Reopen No Violations Falcone Drilling Rig #18 drilled a 17.5 hole to a total depth of 967 and ran 967 of 13 3/8 - 61# J-55 surface casing. Baker Hughes was on location to cement the casing with 821 sacks of class A cement and displace with 140.5 barrels of freah water. Plug landed with 1150 psi. plug held with 1/2 barrel return to tank. They had 50 barrel of cement returned to surface.
1378306255 2013-08-03 Drill / Deepen / Reopen No Violations I arrived on location at 10:00am to cement the 9.625 immediate casing. Falcone Drilling Rig 18 drilled a 12.250 hole to a total depth of 2565. They were running a total of 2564 of 9.625 36# CSG casing. As they were running the casing the 4th joint from the last, they crossed threaded the CRT Tool ( casing running tool ) and had trouble getting the connections undone after that they had trouble getting a new 9.625 collar off of another joint of 9.625 casing that was on location. Baker Hughes loaded the hole with and broke circulation with 324 barrels of fresh water and pumped 35 barrels of gel and 10 barrels of fresh water. They pumped 890 sacks of PNE!+.05%CaCl2+.5%BA10A cement displaced with 195 barrels of water landed plug with 1750 psi. floats held. There was 25 barrels of cement returned to surface.
1398701726 2014-04-16 Drill / Deepen / Reopen No Violations I performed a status check on the above location. At this time there is no drilling or stimulations active at this location. There is various clean up operations on gone, removing containment, flowback equipment and tanks. Well is shut-in.
1438703437 2015-06-17 Preliminary Restoration No Violations I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 400 barrels tanks. There is also 2 compressors and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. Preliminary Restoration is passed
1441116030 2015-08-21 Production Wells No Violations I meet with Dave there Production Manager to check for pressure between the 13 5/8 surface casing and the 9 5/8 intermediate casing at this time there is no noted pressure. I requested that they notify me if there is pressure at any time.. The well is in production. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time.
1445274708 2015-09-28 Production Wells No Violations I performed a status check on the above location. Upon my inspection the well is shut in all values are shut the GPU has no pressure. At the central facility compressors are shut down. No noted violations at this time.
1474389154 2016-09-08 Production Wells No Violations I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There is also 2 compressors and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system.
1475075556 2016-08-08 Production Wells No Violations Northeast Region Supervisor Tom Hill and myself met with Hilcorps Production personnel to discussed the annuals pressure 800 psi on this well. They removed the gage and bled the pressure off. There was no noticeable pressure coming out of the needle valve. They installed a new gage and will monitor the pressures.
1484676823 2017-01-13 Production Wells No Violations I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There is also 1 compressors and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. There was no pressure on the annuals at this time.
1497007774 2017-06-08 Production Wells No Violations I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There is also One compressor and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. There was no pressure on the annuals at this time. They installed a 2 line from their high pressure system and hooked it up to 5.5 and using that to move fluid up the tubing. There is 600 psi on the line. This is controlled by a pressure regulator.
1563470966 2019-7-12 0:00: PW No Violations 1.00
1876790125 2013-08-09 Drill / Deepen / Reopen No Violations I performed a status check on the above location. Falcone Drilling Rig 18 is at a depth of 4697. There are no spills on location and all ID signs are posted. No violation were noted at this time.
2102161399 2015-11-02 Production Wells No Violations I performed a status check on the above location. This well is back in production. Compressors are running at the central facility. ID signs are posted. No noted violations at this time.
2136993921 2013-10-07 Drill / Deepen / Reopen No Violations I performed a status check on the above location. H&P 225 drilling rig is moving on location. At this time there is no drilling.
220434936 2013-7-24 0:00: UD No Violations 2.00
370597208 2013-7-8 0:00:0 DD No Violations 1.00
390552398 2014-12-26 0:00 PW No Violations 1.00
537145379 2013-7-22 0:00: DD No Violations 4.00
904174992 2014-6-11 0:00: AM No Violations 1.00
962028234 2014-1-13 0:00: DD No Violations 2.00

For data sources see[7]

References