Well ID: 34-099-23199 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.01,"lon":-80.53,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Mahoning | |
Municipality: Poland Township | |
Operator Name: HILCORP ENERGY COMPANY | |
Well Pad ID: US-OH-000748 | |
Farm/Lease Name: POLAND-CLL2 | |
License Status: Producing | |
License Date: 2013-07-17 | |
Spud Date: 2013-07-15 | |
Spud Drilling Contractor: FALCON DRLG | |
Final Drill Date: 2014-01-13 | |
Well Total Depth: 12931.00 ft | |
Configuration: Horizontal | |
Latitude: 41.010000 | |
Longitude: -80.530000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-07-17 | Proposed Formations:POINT PLEASANT, Issued Date:7/17/2013, Expired Date:7/17/2015 12:00:00 PM, Drilling unit acres:2417.17, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2014-01-13 | |
Construction Permit Expires | 2014-07-17 | |
Correction to Well | 2015-02-13 | CHANGE IN SURFACE, TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Completion Report Received | 2016-06-15 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | HILCORP ENERGY COMPANY | 390505 | 0 | 190 |
2015 | HILCORP ENERGY COMPANY | 303519 | 0 | 302 |
2016 | HILCORP ENERGY COMPANY | 164504 | 0 | 332 |
2017 | HILCORP ENERGY COMPANY | 158292 | 0 | 361 |
2018 | HILCORP ENERGY COMPANY | 200509 | 0 | 362 |
2019 | HILCORP ENERGY COMPANY | 44116 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | HILCORP ENERGY COMPANY | Brine | 15123 | 190 |
2015 | HILCORP ENERGY COMPANY | Brine | 12043 | 302 |
2016 | HILCORP ENERGY COMPANY | Brine | 11166 | 332 |
2017 | HILCORP ENERGY COMPANY | Brine | 6821 | 361 |
2018 | HILCORP ENERGY COMPANY | Brine | 14000 | 362 |
2019 | HILCORP ENERGY COMPANY | Brine | 2892 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1049455171 | 2014-5-6 0:00:0 | PW | No Violations | 1.00 |
-1050022492 | 2014-3-5 0:00:0 | DD | No Violations | 1.00 |
-1204512953 | 2014-6-9 0:00:0 | PW | No Violations | 1.00 |
-1281755671 | 2013-7-30 0:00: | DD | No Violations | 3.00 |
-1285219269 | 2013-8-1 0:00:0 | DD | No Violations | 1.00 |
-1315170692 | 2018-6-27 0:00: | PW | No Violations | 1.00 |
-275205810 | 2018-11-6 0:00: | PW | No Violations | 1.00 |
-333375519 | 2014-1-21 0:00: | DD | No Violations | 2.00 |
-496470658 | 2016-1-20 0:00: | PW | No Violations | 1.00 |
-59943111 | 2013-7-18 0:00: | DD | No Violations | 2.00 |
-978444835 | 2014-1-31 0:00: | DD | No Violations | 1.00 |
0059943111 | 2013-07-18 | Drill / Deepen / Reopen | No Violations | Hilcorp Drilling Supervisor requested that we have a pre-spud meeting with all personal that will be evolved in drilling the wells on the Poland CLL-2 pad. There is a total of 6 wells. Falcone Drilling Rig 18 will start moving in on 7/22/2013. Teresa McQuade , Ken Brown from the permitting department and my self attented this meeting. I ask that they give me a 4 hour notice of all cementing and also any safety or evironmental problems. |
0220434936 | 2013-07-24 | Urban Drill / Deepen / Reopen | No Violations | I performed a status check on the above location. Falcone Drilling is setting up there drilling rig (#18) on the above location all contimanite and berms are in place. I was accompanied by Theresa McQuade and Mallory Stanton from the permitting office on this inspection. |
0275205810 | 2018-11-06 | Production Wells | No Violations | I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There is also One compressor and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. There was no pressure on the annuals at this time. They installed a 2 line from their high pressure system and hooked it up to 5.5 and using that to move fluid up the tubing. There is 600 psi on the line. This is controlled by a pressure regulator. |
0333375519 | 2014-01-21 | Drill / Deepen / Reopen | No Violations | I performed an inspection on the above location. The rig is in the process of moving. Water trucks and vacuum trucks are on location power washing the rig. No violations noted at this time. |
0370597208 | 2013-07-08 | Drill / Deepen / Reopen | No Violations | Location is complete waiting on Express Energy to start the conductor holes. All permits have been posted. |
0390552398 | 2014-12-26 | Production Wells | No Violations | I performed a status check on the above location. The well is in production. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. |
0496470658 | 2016-01-20 | Production Wells | No Violations | I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 400 barrels tanks. There is also 2 compressors and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. |
0537145379 | 2013-07-22 | Drill / Deepen / Reopen | No Violations | I was on location and meet with Hilcorps Drilling Supervisor and Falcone Drillings Supervisor. At this time they are installing containment and rig matts. All drilling equipment, frac tanks, fuel tanks will be on containment and bermed. All permits are posted in the company house for this (6) well multi pad. 3409923199 /3197 /3200 /3198 /3196 /3192. |
0904174992 | 2014-06-11 | Administrative Inspection | No Violations | I was on location with Geologist Mike McCormac and Geologist Teresa McQuade from the ODNR Columbus Office and also Adam Mullet a production personal from Hilcorp. Adam was explaining how the Gas Production Units ( GPU ) measured the gas and fluids before it went to the central production facility. The production facility is where the gas enters the sales point and the water and oil/condensate is collected. |
0962028234 | 2014-01-13 | Drill / Deepen / Reopen | No Violations | H&P 225 Rig has drilled to a depth of 12981. At this time they are running 5.5 production casing. They will call when they are ready for cementing. The rig is in the process of rigging down and moving. |
0978444835 | 2014-01-31 | Drill / Deepen / Reopen | No Violations | Northeast Region Supervisor Tom Hill and myself performed a status check on the above location. They are preparing the location and wellhead for fracing. There has been a 2 welded steel flow line installed and is caped with a blind flanged. No noted violations were noted at this time. |
1049455171 | 2014-05-06 | Production Wells | No Violations | I performed a status check on the above location. The well is equipped with one GPU production unit. The well is equipped with 2 7/8 tubing. ID signs are posted. No noted violations were noted at this time. Preliminary Restoration can not be passed at this time. |
1050022492 | 2014-03-05 | Drill / Deepen / Reopen | No Violations | Universal Well Service is fracing the above location. All equipment is setting inside of containment. Safety lanes are marked. All annuals are monitored. No noted violations noted at this time. |
1072747535 | 2013-07-19 | Drill / Deepen / Reopen | No Violations | Express Energy Service is on location drilling a 30 conductor hole to a depth of 90 and ran 90 of 20 94# conductor casing. They cemented with 172 sacks of class A cement. They had 13 barrels of cement returned to surface. . Permits are posted. There has been safety meeting. No violations at this time. |
1143973893 | 2019-12-3 0:00: | PW | No Violations | 1.00 |
1204512953 | 2014-06-09 | Production Wells | No Violations | On 6/9/2014. After receiving the approval to produce dated 6/6/2014. Hilcop Energy started turning the above well into production. I was on location to observe this operation. There were various Hilcorp personal on location. Turn on was completed with out incident. Equipment is set up with various safety shut downs. |
1266813236 | 2013-07-25 | Drill / Deepen / Reopen | No Violations | I performed a status check on the above location. Falcone Drilling Rig #18 is in place to start drilling, due to not getting all of the equipment to install the gas buster there will not start drilling until it is fully operational. Permits are posted. Containment has been installed around the fuel tanks and frac tanks. |
1281755671 | 2013-07-30 | Drill / Deepen / Reopen | No Violations | Baker Hughes is on location to perform the BOP test and the 13 3/8 casing integrity test. There is a chart graph on file. |
1285219269 | 2013-08-01 | Drill / Deepen / Reopen | No Violations | I performed a status check on the above location. All containment is good, location is clear of debris. Falcone Rig was at a depth of 1480. No violation were noted at this time. |
1315170692 | 2018-06-27 | Production Wells | No Violations | I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There is also One compressor and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. |
1377616899 | 2013-07-29 | Drill / Deepen / Reopen | No Violations | Falcone Drilling Rig #18 drilled a 17.5 hole to a total depth of 967 and ran 967 of 13 3/8 - 61# J-55 surface casing. Baker Hughes was on location to cement the casing with 821 sacks of class A cement and displace with 140.5 barrels of freah water. Plug landed with 1150 psi. plug held with 1/2 barrel return to tank. They had 50 barrel of cement returned to surface. |
1378306255 | 2013-08-03 | Drill / Deepen / Reopen | No Violations | I arrived on location at 10:00am to cement the 9.625 immediate casing. Falcone Drilling Rig 18 drilled a 12.250 hole to a total depth of 2565. They were running a total of 2564 of 9.625 36# CSG casing. As they were running the casing the 4th joint from the last, they crossed threaded the CRT Tool ( casing running tool ) and had trouble getting the connections undone after that they had trouble getting a new 9.625 collar off of another joint of 9.625 casing that was on location. Baker Hughes loaded the hole with and broke circulation with 324 barrels of fresh water and pumped 35 barrels of gel and 10 barrels of fresh water. They pumped 890 sacks of PNE!+.05%CaCl2+.5%BA10A cement displaced with 195 barrels of water landed plug with 1750 psi. floats held. There was 25 barrels of cement returned to surface. |
1398701726 | 2014-04-16 | Drill / Deepen / Reopen | No Violations | I performed a status check on the above location. At this time there is no drilling or stimulations active at this location. There is various clean up operations on gone, removing containment, flowback equipment and tanks. Well is shut-in. |
1438703437 | 2015-06-17 | Preliminary Restoration | No Violations | I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 400 barrels tanks. There is also 2 compressors and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. Preliminary Restoration is passed |
1441116030 | 2015-08-21 | Production Wells | No Violations | I meet with Dave there Production Manager to check for pressure between the 13 5/8 surface casing and the 9 5/8 intermediate casing at this time there is no noted pressure. I requested that they notify me if there is pressure at any time.. The well is in production. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. |
1445274708 | 2015-09-28 | Production Wells | No Violations | I performed a status check on the above location. Upon my inspection the well is shut in all values are shut the GPU has no pressure. At the central facility compressors are shut down. No noted violations at this time. |
1474389154 | 2016-09-08 | Production Wells | No Violations | I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There is also 2 compressors and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. |
1475075556 | 2016-08-08 | Production Wells | No Violations | Northeast Region Supervisor Tom Hill and myself met with Hilcorps Production personnel to discussed the annuals pressure 800 psi on this well. They removed the gage and bled the pressure off. There was no noticeable pressure coming out of the needle valve. They installed a new gage and will monitor the pressures. |
1484676823 | 2017-01-13 | Production Wells | No Violations | I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There is also 1 compressors and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. There was no pressure on the annuals at this time. |
1497007774 | 2017-06-08 | Production Wells | No Violations | I performed a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There is also One compressor and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. There was no pressure on the annuals at this time. They installed a 2 line from their high pressure system and hooked it up to 5.5 and using that to move fluid up the tubing. There is 600 psi on the line. This is controlled by a pressure regulator. |
1563470966 | 2019-7-12 0:00: | PW | No Violations | 1.00 |
1876790125 | 2013-08-09 | Drill / Deepen / Reopen | No Violations | I performed a status check on the above location. Falcone Drilling Rig 18 is at a depth of 4697. There are no spills on location and all ID signs are posted. No violation were noted at this time. |
2102161399 | 2015-11-02 | Production Wells | No Violations | I performed a status check on the above location. This well is back in production. Compressors are running at the central facility. ID signs are posted. No noted violations at this time. |
2136993921 | 2013-10-07 | Drill / Deepen / Reopen | No Violations | I performed a status check on the above location. H&P 225 drilling rig is moving on location. At this time there is no drilling. |
220434936 | 2013-7-24 0:00: | UD | No Violations | 2.00 |
370597208 | 2013-7-8 0:00:0 | DD | No Violations | 1.00 |
390552398 | 2014-12-26 0:00 | PW | No Violations | 1.00 |
537145379 | 2013-7-22 0:00: | DD | No Violations | 4.00 |
904174992 | 2014-6-11 0:00: | AM | No Violations | 1.00 |
962028234 | 2014-1-13 0:00: | DD | No Violations | 2.00 |