If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-22596 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.75,"lon":-81.14,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Center Township | |
Operator Name: YONTZ OIL & GAS LLC | |
Well Pad ID: | |
Farm/Lease Name: BROOKS | |
License Status: Producing | |
License Date: 1981-10-06 | |
Spud Date: 1981-11-12 | |
Spud Drilling Contractor: | |
Final Drill Date: 1981-11-10 | |
Well Total Depth: 1990.00 ft | |
Configuration: Vertical | |
Latitude: 39.750000 | |
Longitude: -81.140000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1981-10-06 | 56 BUCKEYE OIL PRODUCING CO GeoDate 10/6/81 |
Completed | 1981-11-10 | FDT = GRIT., PF = GRIT |
Reached Total Depth | 1981-11-10 | FDT = GRIT., PF = GRIT |
Original Spud | 1981-11-12 | FDT = GRIT., PF = GRIT |
CO | 1997-01-09 | 2356 YONTZ OIL & GAS (JAMES) GeoDate 10/6/81 |
Change of Owner | 2018-06-12 | Operator changed from 2356, YONTZ JAMES to 10153, YONTZ OIL & GAS LLC |
Record Last Modified | 2018-06-12 | FDT = GRIT., PF = GRIT |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 1893 | 1905 | 12 |
1893 | 1905 | 12 | |
1893 | 1905 | 12 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 3000 Bbl | 50000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1985 | MERRILL NATURAL RES INC | 856.00 | 130.00 | 310 |
1986 | BUCKEYE OIL PRODUCING CO | 439.00 | 38.00 | 365 |
1987 | BUCKEYE OIL PRODUCING CO | 220.00 | 145.00 | 365 |
1988 | BUCKEYE OIL PRODUCING CO | 548.00 | 58.00 | 365 |
1989 | BUCKEYE OIL PRODUCING CO | 180.00 | 37.00 | 365 |
1990 | BUCKEYE OIL PRODUCING CO | 134.00 | 29.00 | 365 |
1991 | BUCKEYE OIL PRODUCING CO | 40.00 | 0.00 | 365 |
1992 | BUCKEYE OIL PRODUCING CO | 243.00 | 27.00 | 365 |
1993 | BUCKEYE OIL PRODUCING CO | 126.00 | 27.00 | 365 |
1994 | BUCKEYE OIL PRODUCING CO | 272.00 | 28.00 | 365 |
1995 | BUCKEYE OIL PRODUCING CO | 106.00 | 29.00 | 365 |
1996 | BUCKEYE OIL PRODUCING CO | 44.00 | 23.00 | 365 |
2003 | YONTZ JAMES | 413.00 | 33.00 | 365 |
2004 | YONTZ JAMES | 392.00 | 29.00 | 365 |
2005 | YONTZ JAMES | 561.00 | 32.00 | 365 |
2006 | YONTZ JAMES | 611.00 | 37.00 | 365 |
2007 | YONTZ JAMES | 919.00 | 57.00 | 365 |
2008 | YONTZ JAMES | 470.00 | 47.00 | 365 |
2009 | YONTZ JAMES | 90.00 | 18.00 | 365 |
2010 | YONTZ JAMES | 175.00 | 21.00 | 365 |
2011 | YONTZ JAMES | 200.00 | 35.00 | 365 |
2012 | YONTZ JAMES | 410.00 | 10.00 | 366 |
2013 | YONTZ JAMES | 158.00 | 11.00 | 365 |
2015 | YONTZ JAMES | 89.00 | 10.00 | 365 |
2016 | YONTZ JAMES | 40.00 | 7.00 | 365 |
2017 | YONTZ JAMES | 71.00 | 12.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1985 | MERRILL NATURAL RES INC | Brine | 0 | 310 |
1986 | BUCKEYE OIL PRODUCING CO | Brine | 0 | 365 |
1987 | BUCKEYE OIL PRODUCING CO | Brine | 0 | 365 |
1988 | BUCKEYE OIL PRODUCING CO | Brine | 0 | 365 |
1989 | BUCKEYE OIL PRODUCING CO | Brine | 0 | 365 |
1990 | BUCKEYE OIL PRODUCING CO | Brine | 0 | 365 |
1991 | BUCKEYE OIL PRODUCING CO | Brine | 0 | 365 |
1992 | BUCKEYE OIL PRODUCING CO | Brine | 0 | 365 |
1993 | BUCKEYE OIL PRODUCING CO | Brine | 0 | 365 |
1994 | BUCKEYE OIL PRODUCING CO | Brine | 0 | 365 |
1995 | BUCKEYE OIL PRODUCING CO | Brine | 0 | 365 |
1996 | BUCKEYE OIL PRODUCING CO | Brine | 0 | 365 |
2003 | YONTZ JAMES | Brine | 0 | 365 |
2004 | YONTZ JAMES | Brine | 0 | 365 |
2005 | YONTZ JAMES | Brine | 0 | 365 |
2006 | YONTZ JAMES | Brine | 0 | 365 |
2007 | YONTZ JAMES | Brine | 0 | 365 |
2008 | YONTZ JAMES | Brine | 0 | 365 |
2009 | YONTZ JAMES | Brine | 5 | 365 |
2010 | YONTZ JAMES | Brine | 0 | 365 |
2011 | YONTZ JAMES | Brine | 10 | 365 |
2012 | YONTZ JAMES | Brine | 18 | 366 |
2013 | YONTZ JAMES | Brine | 0 | 365 |
2015 | YONTZ JAMES | Brine | 15 | 365 |
2016 | YONTZ JAMES | Brine | 10 | 365 |
2017 | YONTZ JAMES | Brine | 7 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1299317647 | 2014-3-21 0:00: | PW | No Violations | 2.50 |
1299317647 | 2014-03-21 | Production Wells | No Violations | Status check inspection found the following equipment at the well head-4.5 production casing-1.5 tubing and pumping rods with the production valves open and the well being produced by the means of a hydraulic pumping unit, 2-100 barrel production tanks are located in an established dike with identification posted. The well has been miss identified by the producer as 34111225770000. |
For data sources see[9]