X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-111-24067

Well Details

Well ID: 34-111-24067
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Center Township
Operator Name: PROFIT ENERGY COMPANY
Well Pad ID:
Farm/Lease Name: YOSS
License Status: Producing
License Date: 2006-11-15
Spud Date: 2006-11-17
Spud Drilling Contractor: MONROE DRILLING OPERATION, LLC
Final Drill Date: 2006-11-24
Well Total Depth: 2670.00 ft
Configuration: Vertical
Latitude: 39.750000
Longitude: -81.120000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2006-11-15 Proposed Formations:BEREA/OHIO SHALE, Issued Date:11/15/2006, Expired Date:11/15/2007 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL
Completed 2006-11-24
Reached Total Depth 2006-11-24
Construction Permit Expires 2007-11-15
Completion Report Received 2007-12-21
Record Last Modified 2015-09-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2008-01-18 2096 2586 106
2096 2586 106
2096 2586 106

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 66700 Gal 0 PERF INFO CALLED IN BY OPERATOR ON 1/18/08 … GANTZ, THIRTY FOOT, AND GORDON SANDS WERE INVOLVED IN FRAC OF OHIO SHALE INTERVAL ... GM

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2008 PROFIT ENERGY COMPANY 3017.00 136.00 365
2009 PROFIT ENERGY COMPANY 2422.00 74.00 365
2010 PROFIT ENERGY COMPANY 1862.00 79.00 365
2011 PROFIT ENERGY COMPANY 1374.00 0.00 365
2012 PROFIT ENERGY COMPANY 1351.00 85.00 366
2014 PROFIT ENERGY COMPANY 1103.00 25.00 365
2015 PROFIT ENERGY COMPANY 735.00 25.00 365
2016 PROFIT ENERGY COMPANY 561.00 0.00 365
2017 PROFIT ENERGY COMPANY 339.00 0.00 365
2018 PROFIT ENERGY COMPANY 386.00 27.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2008 PROFIT ENERGY COMPANY Brine 163 365
2009 PROFIT ENERGY COMPANY Brine 62 365
2010 PROFIT ENERGY COMPANY Brine 0 365
2011 PROFIT ENERGY COMPANY Brine 0 365
2012 PROFIT ENERGY COMPANY Brine 10 366
2014 PROFIT ENERGY COMPANY Brine 61 365
2015 PROFIT ENERGY COMPANY Brine 66 365
2016 PROFIT ENERGY COMPANY Brine 0 365
2017 PROFIT ENERGY COMPANY Brine 0 365
2018 PROFIT ENERGY COMPANY Brine 65 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1479583399 2012-7-16 0:00: PW No Violations
-554750546 2007-10-29 0:00 PL No Violations
0554750546 2007-10-29 Preliminary Restoration No Violations Restoration work at site satisfactory,pit has been filled in and site restored,well is equipped with pump jack and 2-100 bbl tanks well owner is currently awaiting fence crew to construct fence around wellhead and tank battery to become in compliance with Urban drilling plan.
1479583399 2012-07-16 Production Wells No Violations Inspection of the well head found the following equipment present - 7 surface casing, 4.5 production casing, 1.5 tubing & rods with the tubing valve closed and the production valve open and the well being produced by the means of a pumping unit. A single 100 barrel tank and separator along with a gas meter are present in an established dike.
1539190239 2018-10-10 UrbanProduction Wells No Violations On this day, I found the well equipped with 7 inch diameter surface casing, 4.5 inch diameter production casing, and 1.9 inch diameter tubing. The well is setup to be produced by means of a pumping unit. The production facility consists of (1) 100 barrel steel tank, drip tank, vertical separator, and an orifice chart meter all contained within an earthen dike. It will be noted that the facility and pumping unit are enclosed within fencing due to urban drilling requirements. The tank is properly identified and the production records are current.
2132130616 2020-8-12 0:00: PW No Violations 0.80

For data sources see[9]

References