Well Details

Well ID: 34-111-24389
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Lee Township
Operator Name: ECLIPSE RESOURCES I LP
Well Pad ID: US-OH-000803
Farm/Lease Name: STALDER UNIT C
License Status: Producing
License Date: 2014-04-23
Spud Date: 2014-04-22
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2014-09-26
Well Total Depth: 17198.00 ft
Configuration: Horizontal
Latitude: 39.640000
Longitude: -80.920000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-05-21 Proposed Formations:CLINTON THRU TRENTON, Issued Date:5/21/2013, Expired Date:5/21/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
Correction to Well 2013-05-24 CORRECTION TO FOOTAGE (SURFACE).
APP 2014-04-23 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:4/23/2014, Expired Date:4/22/2016 12:00:00 PM, Drilling unit acres:672.4, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2014-09-26
Completion Report Received 2015-05-26
Construction Permit Expires 2016-04-22
Change of Owner 2017-12-22 Operator changed from 8610, TRIAD HUNTER LLC to 8844, ECLIPSE RESOURCES I LP
Record Last Modified 2017-12-22

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2015-06-08 16855 11481 0
16855 11481 0
16855 11481 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 12/01/2014 12/01/2014 10701 10,461,900.0 106000

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 LP-65 Halliburton Scale Inhibitor Ammonium chloride 12125-02-9 10 0.0024006 2400
100 MESH WHITE Halliburton Proppant Crystalline silica, quartz 14808-60-7 100 0.519935 519801
LGC-36 UC Halliburton Liquid Gel Concentrate Guar gum 9000-30-0 60 0.0164083 16405
Naphtha, hydrotreated heavy 64742-48-9 60 0.0164083 16405
FR-66 Halliburton Friction Reducer Hydrotreated light petroleum distillate 64742-47-8 30 0.0466769 46665
WG-36 GELLING AGENT Halliburton Gelling Agent Guar gum 9000-30-0 100 0.0478724 47860
Other Ingredient(s) Bentonite, benzyl(hydrogenated

tallow alkyl) dimethylammonium stearate complex

121888-68-4 0 0.00239362 2393
Formaldehyde 50-00-0 0 0.00024006 240
Sodium sulfate 7757-82-6 0 0.00000136 2
Silica gel 112926-00-8 0 0.000478724 479
Fatty acid tall oil amide Confidential 0 0.00777949 7778
Surfactant mixture Confidential 0 0.000478724 479
Propylene glycol 57-55-6 0 0.0169668 16963
Organic phosphonate Confidential 0 0.0144036 14400
Crystalline silica, quartz 14808-60-7 0 0.00007522 76
Aluminum Silicate 1302-76-7 0 5.85072 5,849,200.0
Sorbitan monooleate polyoxyethylene derivative 9005-65-6 0 0.0015559 1556
Sodium chloride 7647-14-5 0 0.00778449 7783
Sorbitan, mono-9-octadecenoate, (Z) 1338-43-8 0 0.0015559 1556
Water 7732-18-5 0 1.08498 1,084,700.0
Fatty alcohol polyglycol ether surfactant 9043-30-5 0 0.000273472 274
Ammonium chloride 12125-02-9 0 0.00777949 7778
Alcohols, C12-16, ethoxylated 68551-12-2 0 0.00777949 7778
Polyacrylamide copolymer Confidential 0 0.0466769 46665
Strontium chloride 10476-85-4 0 0.00000500 6
Potassium chloride 7447-40-7 0 0.00000500 6
Quaternary ammonium compounds,

bis(hydrogenated tallow alkyl) dimethyl,salts with bentonite

68953-58-2 0 0.00136736 1368
SP BREAKER Halliburton Breaker Sodium persulfate 7775-27-1 100 0.00135635 1356
30/50, 20/40 CERAMIC PROP Halliburton Proppant Silica, amorphous - fumed 7631-86-9 30 1.75522 1,754,760.0
Mullite 1302-93-8 100 5.85072 5,849,200.0
Crystalline silica, cristobalite 14464-46-1 30 1.75522 1,754,760.0
Fresh Water Operator Base Fluid Fresh Water 7732-18-5 100 87.1698 87,147,100.0
OptiKleen- Halliburton Concentrate Sodium perborate tetrahydrate 10486-00-7 100 0.00189949 1899
CALCIUM CHLORIDE Halliburton Brine Calcium chloride 10043-52-4 96 0.00009603 96
30/50 WHITE Halliburton Proppant Crystalline silica, quartz 14808-60-7 100 5.22416 5,222,800.0
BE-9W Halliburton Biocide Tributyl tetradecyl phosphonium chloride 81741-28-8 10 0.0028278 2828
HYDROCHLORIC ACID 10-30% Halliburton Solvent Hydrochloric acid 7647-01-0 30 0.284683 284610

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2014-11-20 H2O 0 9397 Bbl 291745 Halliburton STAGE 1/25

STAGES 2-24 SEE IMAGES

2014-12-02 H2O 0 10223 Bbl 366887 Halliburton STAGE 25/25

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2015 TRIAD HUNTER LLC 2454635 0 281
2016 TRIAD HUNTER LLC 948426 0 367
2017 ECLIPSE RESOURCES I LP 453573 0 365
2018 ECLIPSE RESOURCES I LP 311234 0 353
2019 ECLIPSE RESOURCES I LP 66379 0 86

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2015 TRIAD HUNTER LLC Brine 40169 281
2016 TRIAD HUNTER LLC Brine 13128 367
2017 TRIAD HUNTER LLC Brine 7960 334
2018 ECLIPSE RESOURCES I LP Brine 4155 353
2019 ECLIPSE RESOURCES I LP Brine 870 86

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1042607624 2019-3-12 0:00: PW No Violations 1.00
-1313773414 2015-5-26 0:00: CT No Violations 0.70
-1836896581 2014-4-23 0:00: DD No Violations 5.50
-2050393381 2020-5-29 0:00: PW No Violations 0.30
0115584436 2016-02-16 Preliminary Restoration No Violations Status check inspection found the well head equipped with (2) 5.185 master control primary gate valves assembled on the B-section well head along with (2) tubing head master valves and a primary control hydraulic emergency shut down in line vale on the tubing head stack located between the 2 tubing manual valves. There is a sand trap separator hooked into the production outlet flow line near the well head supported by a 100 barrel production tank located on location near the well head. The well does have production tubing in it and the well is currently in production with a total of 10- 400 barrel production tanks located on a production pad adjacent to the well pad with 7 gas processing units along with a gas compressor also located on the adjacent production pad. The well was turned over to the companys production department on and after 12/17/2015. Addressing the preliminary restoration- upon inspection of the well pad it was observed that the primary perimeter boundary affected by the well pad construction is secure and has no stability or erosion issues with vegetation established on the well ad perimeter. The well pad itself has earthen material that was stockpiled after a well control incident during December of 2014, According to Sam Miracle with Triads Engineering Department the material is slated to be addressed once the weather breaks this spring. There is also a large portable polymer lined water tank on the well pad location that is being emptied of all fluids currently and is to be disassembled and removed from the locating in the future.
1042607624 2019-03-12 Production Wells No Violations Status check inspection found the well equipped with a lower A and upper B section with 2 diameter riser pipes attached to the service ports on the A&B sections. The riser pipes are equipped with valves and gauges for the purpose of annular pressure monitoring. The A section pressure gauge reads 150 pounds and the B section pressure reads 250 pounds. The 5.5 production casing well head section flow cross is equipped with a gauge that reads 1,700 pounds pressure. The well head is equipped with a production tree and lubricator head with 1,400 pounds pressure on the production tree. The well is flowing through a sand trap separator. The production facility is situated on a separate production pad and consists of (10) 500 barrel capacity tanks along with 5 gas processing units. On site on this day were company representatives Neil Ingram, George Winland and Ryan Lori.
115584436 2016-2-16 0:00: PL No Violations 1.20
1201390161 2017-12-07 Preliminary Restoration No Violations Preliminary restoration status check inspection found the area affected by the well pad construction perimeter boundary to be stable with vegetation established. There is a 2nd pad site that us used as a production pad that the lease road to the pad runs through that also has the perimeter established with vegetation, on the second pad is the tank farm that consists of a total of 10 steel design 500 barrel fluid capacity steel tanks situated inside a polymer lined steel containment area. There is also a large gas compressor and 5 gas processing units on the second pad site. Addressing the primary pad site there are 5 wells completed on the pad with all 5 wells found to be in operation on the pad. Proper well identification is posted on each well and at the tank farm battery site. The lease road is of stone construction. Bruce Carpenter with Eclipse Resources recently contacted me and indicated that Eclipse has taken over ownership of the wells and equipment.
1313773414 2015-05-26 Completion Testing No Violations Status check inspection on the well flow back completion process found Fesco Well Control Company on site conducting well flow back post stimulation operations. Conversation with the Flow Back Engineer with Fesco indicated to the fact that today would be the final day for flow back and the company would be released and breaking down their equipment in order for Triad to begin normal production operations. On site with me today was ODNR Engineer Tech Andy Thomas who agreed the Preliminary Restoration could not be considered completed until the company removed the 2 large piles of soil placed on location during the well control event during the month of 12/2014.
1403595391 2014-06-24 Casing String Witnessed No Violations On 06/24/2014 Warren Drilling rig 12 is now on the hole and has drilled a 24 diameter surface borehole to a depth of 530 and ran 504 of 20 casing with Halliburton cement services cementing the casing to surface using 620 sacks of Halcem cement with 40 % calculated open hole excess and 37 barrels of cement returns to surface.
1405558486 2014-07-16 Casing String Witnessed No Violations Status check inspection on the running of the 9.625 2nd intermediate casing string set at a depth of 9,607 with Halliburton cement crew on location rigging up to cement the casing.
1411408444 2014-09-22 Drill / Deepen / Reopen No Violations Status check inspection on the drilling process found Patterson drilling on the hole drilling the 8.5 production borehole in the curve section at a depth of 10,122 using 11.7# drilling mud, a formation integrity breakdown test was administered indicating the formation would withstand 19# mud weight.
1800723426 2014-07-09 Drill / Deepen / Reopen No Violations Status check inspection on the drilling process found Warren Drilling rig 12 on the hole drilling the 12.250 2nd intermediate well bore at a depth of 6,250, the company is drilling on air and misting with KCL.
1836896581 2014-04-23 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed that Express Energy Services had drilled a 32 inch diameter hole to the depth of 100 feet and ran 100 feet of 26 inch conductor pipe. Express Energy Services cemented conductor pipe with 250 sacks of Class A cement with 2% CaCl and .5 #/sack of floseal. Had good returns of 5bbls and cement stayed to surface.
427501320 2019-8-1 0:00:0 PW No Violations 0.30

For data sources see[10]