Well Details

Well ID: 34-111-24411
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Bethel Township
Operator Name: ANTERO RESOURCES CORPORATION
Well Pad ID: US-OH-000840
Farm/Lease Name: HERCHER SOUTH
License Status: Producing
License Date: 2013-08-27
Spud Date: 2013-07-31
Spud Drilling Contractor: FRONTIER DRILLING
Final Drill Date: 2013-12-16
Well Total Depth: 15300.00 ft
Configuration: Horizontal
Latitude: 39.670000
Longitude: -81.240000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-07-09 Proposed Formations:TRENTON-BLACK RIVER, Issued Date:7/9/2013, Expired Date:7/9/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2013-08-27 Proposed Formations:POINT PLEASANT, Issued Date:8/27/2013, Expired Date:8/27/2015 12:00:00 PM, Drilling unit acres:346.8, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2013-12-16
Completion Report Received 2014-09-04
Correction to Well 2015-01-23 CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
Change of Owner 2015-02-13 Operator changed from 8856, HALL DRILLING LLC (OIL & GAS) to 8943, ANTERO RESOURCES CORPORATION
Construction Permit Expires 2015-08-27
Record Last Modified 2017-02-15

For data sources see[2]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 05/08/2014 06/10/2014 8960 9,296,780.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 20/40 InnoProp CR Carbo Proppant Silicon Dioxide 7631-86-9 35 0.531765 445337
Crystalline Silica 14464-46-1 20 0.303866 254478
Mullite 1302-93-8 85 1.29143 1,081,530.0
Phenol-Formaldehyde Novolak Resin 9003-35-4 5 0.0759664 63619.6
40/70 White Sand US Silica Proppant Sand 14808-60-7 100 0.374066 313269
Plexhib 256 Chemplex Corrosion Inhibitor Thiourea-formaldhyde copolymer 68527-49-1 30 0.000203097 170.088
n-olefins Proprietary 10 0.00006770 56.696
Methyl Alcohol 67-56-1 70 0.000473893 396.872
Propargyl Alcohol 107-19-7 8 0.00005416 45.357
Alcohol Ethoxylate Surfactants Proprietary 30 0.000203097 170.088
100 Mesh US Silica Proppant Sand 14808-60-7 100 0.0892832 74772
Plexbreak 145 Chemplex Non-Emulsifier Methyl Alcohol 67-56-1 15 0.000113596 95.133
Cocamide Diethanolamine Salt 68603-42-9 10 0.00007573 63.422
Diethanolamine 111-42-2 5 0.00003787 31.711
Water 7732-18-5 66 0.000499821 418.585
Ethylene Glycol Monobutyl Ether 111-76-2 15 0.000113596 95.133
Greenflush Chemplex Cleaner Alcohol Ethoxylate Surfactants Proprietary 10 0.000818427 685.408
Plexbor 101 Chemplex Instant Crosslinker Etheylene Glycol 107-21-1 10 0.00091584 766.989
Potassium Hydroxide 1310-58-3 5 0.00045792 383.494
Potassium Metaborate 13709-94-9 30 0.00274752 2300.97
Water 7732-18-5 75 0.0068688 5752.42
Freshwater Hall-Ross Frac Base Water 7732-18-5 100 92.6381 77,581,700.0
Plexaid 673 Chemplex Scale Inhibitor Water 7732-18-5 85 0.0107005 8961.33
Methyl Alcohol 67-56-1 25 0.0031472 2635.68
Sodium Salt of Phosphonodimethylated Diamine Proprietary 5 0.00062944 527.137
Ferriplex 66 Chemplex Iron Control Water 7732-18-5 35 0.000320858 268.709
Citric Acid 77-92-9 30 0.000275021 230.322
Acetic Acid 64-19-7 50 0.000458369 383.87
30/50 White Sand US Silica Proppant Sand 14808-60-7 100 4.69971 3,935,870.0
HCl Acid 10-15% GoFrac Acid Hydrochloric Acid 7647-01-0 15 0.0655716 54914.3
Plexcide 15G Chemplex Biocide Water 7732-18-5 90 0.0105841 8863.89
Didecyl Dimethyl Ammonium Chloride 7173-51-5 3 0.000352804 295.463
Glutaraldehyde 111-30-8 14 0.00164642 1378.83
Ethanol 64-17-5 3 0.000352804 295.463
Alkyl Dimethyl Benzyl Ammonium Chloride 68424-85-1 3 0.000352804 295.463
Plexslick 953 Chemplex Friction Reducer Polyacrylamide-co-acrylic acid Proprietary 32 0.022284 18662.2
Alcohol Ethoxylate Surfactants Proprietary 8 0.00557101 4665.56
Water 7732-18-5 35 0.0243732 20411.8
Hydrotreated Petroleum Distillate 64742-47-8 30 0.0208913 17495.8
SOS 1545 Ultrablend Guar Gel Hydrocarbons 64741-85-1 70 0.0888958 74447.6
Sodium Persulfate Chemplex Active Breaker Sodium Persulfate 7775-27-1 100 0.00168006 1407

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2014-05-08 H2O 15 6119 Bbl 226905 Go Frac LLC STAGE 1/35

36 SHOTS STAGES 2-34

2014-06-02 H2O 15 5695 Bbl 212214 Go Frac LLC STAGE 35/35

36 SHOTS

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 ANTERO RESOURCES CORPORATION 995927 0 178
2015 ANTERO RESOURCES CORPORATION 690118 0 365
2016 ANTERO RESOURCES CORPORATION 603175 0 366
2017 ANTERO RESOURCES CORPORATION 365954 0 365
2018 ANTERO RESOURCES CORPORATION 271932 0 365
2019 ANTERO RESOURCES CORPORATION 45045 0 90

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 ANTERO RESOURCES CORPORATION Brine 16088 178
2015 ANTERO RESOURCES CORPORATION Brine 5344 365
2016 ANTERO RESOURCES CORPORATION Brine 4090 366
2017 ANTERO RESOURCES CORPORATION Brine 2543 365
2018 ANTERO RESOURCES CORPORATION Brine 2323 365
2019 ANTERO RESOURCES CORPORATION Brine 281 90

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1735257338 2018-10-4 0:00: PW No Violations 0.50
-1889086552 2020-5-29 0:00: PW No Violations 1.00
-2009530567 2018-10-4 0:00: PW No Violations 0.50
-218227729 2013-12-5 0:00: DD No Violations 1.30
-218956085 2013-12-3 0:00: DD No Violations 1.20
-719449694 2013-9-23 0:00: DD No Violations 1.50
-831922803 2013-9-16 0:00: DD No Violations 1.30
0138349072 2015-06-18 Preliminary Restoration No Violations Preliminary Restoration follow up inspection found the restoration status is still showing up as active in the database and was signed off by myself on 02/26/2015. I once again have added the well GPS coordinates into the system also. Inspection of the well head found the following equipment present 5.5 production casing with the production valves open and selling into a 2 sales line. A total of 4 -400 barrel capacity tanks are present in a plastic lined metal constructed dike area. Chloride levels were tested at 4 random locations across the well pad with no levels showing up over 121 parts per million on a low level Quantab field strip test. Preliminary Restoration once again passed on this day.
0204425221 2013-12-17 Casing String Witnessed No Violations Status check inspection found the well bore total drilling depth of 15,335 has been reached and the 5.5 production casing has been set at 15,316. Baker Hughes cement services are on location beginning the long string cement job.
0218227729 2013-12-05 Drill / Deepen / Reopen No Violations The Drilling rig Falcon Rig # 17 has skidded over on to the well, The 9.625 casing was previously set and only the production borehole is left to drill. Some issues I addressed on my last inspection with containment have been addressed.
0218956085 2013-12-03 Drill / Deepen / Reopen No Violations Status check inspection found the drilling rig Falcon Rig 20 rigging back up on the hole preparing to drill the horizontal well bore section, Orders were left with the company man on sit to straighten up the containment that has been damaged and clean up the fluids mixing area.
0611670921 2018-03-13 Production Wells No Violations On this day, I found the well equipped with annular pressure monitoring devices. The surface pressure gauge is reading 300 pounds per square inch, and the 9.625 gauge is reading 1,600 pounds per square inch. There are (4) wells in production on this pad. All wells have concrete barriers surrounding them. The facility is gated with proper signage. There are (4) 400 barrel steel tanks within containment at the front right-side, prior to the pad, with an electronic shutdown button. There is a midstream facility at the front right-side of the pad, and (4) gas processing units beside it. The wellheads are not properly identified, but it will be noted that I spoke with Antero representative, Jonah Turner, during my inspection on another pad, and informed him to make sure that his operators have their wellheads identified with proper signage.
0719449694 2013-09-23 Drill / Deepen / Reopen No Violations Inspection and status check on the drilling process found the current drilling depth to be 7091 using a 12.250 bit with a projected total depth for this segment to be 7750 setting 9.625 casing.
0831922803 2013-09-16 Drill / Deepen / Reopen No Violations Inspection found the drilling company not able to properly deviate out of their recently set kick plug and notification was made to me that they shall clean up the hole and reset the kick plug through tubing attached to their drill string.
0886941788 2013-09-10 Plug / Plug Back No Violations A 17.5 hammer bit was lost at 2070 and a plug was set at 2007 up to 1650 using 600 sacks of class A cement. The 13.375 casing is to be set on top of the plug.
0891306965 2013-09-12 Casing String Witnessed No Violations On site inspection to witness the cementing of 1543 of 13.375 casing, this 1st intermediate string was set short due to a lost 17.5 bit at 2070. The well bore was plugged back and the casing set under the understanding it was cemented to surface and the 2nd intermediate shall be cemented to surface. Baker and Hughes used 1357 sacks of type 1 cement and saw 75 barrels of good cement returns to surface. The casing shall be pressure tested during the BOP test. The Division Deputy Chief Dave Claus and My direct Supervisor Rocky King along with the permitting section lead man Steve Opritza was aware of the casing program change.
1375446743 2013-08-02 Casing String Witnessed No Violations The said well was spudded on 07/31/13 with 100 of 24 conductor being set. On 08/02/13 I witnessed the cementing of 360 of 20 surface pipe in a 23 borehole with 3 centralizers ran and 10 barrels of good cement returns to surface. The mix water was tested and showed no chloride levels. Baker Hughes cement services were the cement contractors and Zigenfuss were the drilling contractors.
1378736707 2013-09-09 Drill / Deepen / Reopen No Violations Inspection and status check of the drilling progress found the current drilling depth to be 2070 using a 17. hammer bit. The company man indicated they are having trouble making hole and have pulled the drill string out of the hole for a bit change.
1378771050 2013-09-09 Drill / Deepen / Reopen No Violations

-1st intermediate short of their permitted length, cementing it to surface , They will then deviate around the lost tool while drilling the 2nd intermediate. I spoke with Dave Claus and Rocky King and we are in agreement that as long as both intermediate casing strings are cemented to surface this would be allowable. This all took place after 5pm and due to the aggressive nature of the red rock collapsing we had to give them some sort of direction to approach this matter while the hole was still workable.

1380183379 2013-09-25 Casing String Witnessed No Violations On site inspection to witness the cementing of 7810 of 9.625 intermediate casing. Baker Hughes cement services cemented the 2 stage cement job with 60 barrels of cement returns to surface and both stages pressure tested.
138349072 2015-6-18 0:00: PL No Violations 1.00
1386776779 2013-12-11 Drill / Deepen / Reopen No Violations Status check inspection on the current drilling progress found the current drilling depth to be 13,141 using a 8.5 bit assembly. The last directional survey was at 13,019 with a Azimuth of 149.92 and Inclination of 88.58 degrees and a True vertical depth of 8,921, In review of the last submitted mud report the mud weight was 11.40# and the viscosity was 94.0, I discussed with the company man the mud weight being low and viscosity being high and asked Him to review this and make corrections accordingly.
1399315256 2014-05-05 Completion Testing No Violations Status check inspection found Gofrac services rigged up on the hole rigging up to begin stimulation within the next 24 hours, the hole is being perforated between 15,239 and 15,109 with 6-10 shot clusters.
1599337506 2013-09-18 Drill / Deepen / Reopen No Violations Status check inspection on the drilling process found the current drilling depth of 1583 and the drilling company running back in the hole with 12.250 directional tools after a drive motor failure.
1735257338 2018-10-04 Production Wells No Violations Status check inspection found (4) wells present on the pad with all wells found to be in production. The lease road surface is stone construction and in good repair. There is a gate across the lease road with owner and well pad information present. The production facility is also along the lease road and not on the well pad. The production facility consists of (4) steel construction tanks capable of holding 400 fluid barrels capacity each. The tanks are situated inside a polymer lined steel containment dike area with hazard warning labels present. There is also an earthen berm around the production facility. Situated on the well pad is a large gas compressor. Addressing the well head the well is equipped with a lower A and upper B section with a production tree present. The production valves are in the open position. 2 diameter riser pipes are present with valves and gauges attached for annular pressure monitoring. The 13.375 well head section showed 80 pounds pressure and the 9.625 well head section showed zero pounds pressure. Also noted the South East slope of the well pad does have an earthen slip that is being addressed by the Division Engineering section. The slip has required 10,000 to 12,000 cubic yards of material to be removed. The company is remediating the slip under emergency stabilization guidelines under the well construction rules.
1970798295 2015-02-26 Preliminary Restoration No Violations Preliminary Restoration status check inspection found 4 wells total present on this pad at this time with the well head equipped with a production tree with the production valves in the open position selling into a gas processing unit equipped with a mechanical sand trap and USA Compression gas compressor set on the well location with a inline fluid separator and dryer system present. 4- 400 barrel production tanks are present near the well pad entrance supporting the wells on the pad, all located inside a mechanical dike area with proper well identification present at both the well head and tank battery area. Preliminary Restoration passed on this day.
2009530567 2018-10-04 Production Wells No Violations Status check inspection found (4) wells present on the pad with all wells found to be in production. The lease road surface is stone construction and in good repair. There is a gate across the lease road with owner and well pad information present. The production facility is also along the lease road and not on the well pad. The production facility consists of (4) steel construction tanks capable of holding 400 fluid barrels capacity each. The tanks are situated inside a polymer lined steel containment dike area with hazard warning labels present. There is also an earthen berm around the production facility. Situated on the well pad is a large gas compressor. Addressing the well head the well is equipped with a lower A and upper B section with a production tree present. The production valves are in the open position. 2 diameter riser pipes are present with valves and gauges attached for annular pressure monitoring. The 13.375 well head section showed 80 pounds pressure and the 9.625 well head section showed zero pounds pressure. Also noted the South East slope of the well pad does have an earthen slip that is being addressed by the Division Engineering section. The slip has required 10,000 to 12,000 cubic yards of material to be removed. The company is remediating the slip under emergency stabilization guidelines under the well construction rules.
204425221 2013-12-17 0:00 CS No Violations 1.60
611670921 2018-3-13 0:00: PW No Violations 0.30
886941788 2013-9-10 0:00: PB No Violations 6.00
891306965 2013-9-12 0:00: CS No Violations 4.00

For data sources see[9]