X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-111-24792

Well Details

Well ID: 34-111-24792
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Ohio Township
Operator Name: EQUINOR USA ONSHORE PROPERTIES
Well Pad ID: US-OH-001513
Farm/Lease Name: ISALY
License Status: Producing
License Date: 2017-10-13
Spud Date: 2017-11-19
Spud Drilling Contractor: ORION DRILLING
Final Drill Date: 2018-02-20
Well Total Depth: 23300.00 ft
Configuration: Horizontal
Latitude: 39.670000
Longitude: -80.890000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-10-13 Proposed Formations:POINT PLEASANT, Issued Date:10/13/2017, Expired Date:10/13/2019 12:00:00 PM, Drilling unit acres:491.571, Proposed Well Type:OG, Proposed Well Class:POOL
Original Spud 2017-11-19
Reached Total Depth 2018-02-20
Conversion to Producer 2018-05-18 UPDATE TARGET/TAKE PER AS-DRILLED PLAT
Change of Owner 2018-08-08 Operator changed from 9065, STATOIL USA ONSHORE PROPERTIES INC to 10187, EQUINOR USA ONSHORE PROPERTIES INC.
Completion Report Received 2019-03-08
Record Last Modified 2019-03-14
Construction Permit Expires 2019-10-13

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2019-03-13 12253 12418 0
2019-03-13 22930 23090 0
22930 23090 0
12253 12418 0
12253 12418 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 07/31/2018 09/05/2018 11171 18,328,400.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 OptiKleen-WF(TM) Halliburton Concentrate Listed Below Listed Below 0 0 0
FIGHTR EC-1 Halliburton Friction Reducer Listed Below Listed Below 0 0 0
MC B-8614 Halliburton Biocide Listed Below Listed Below 0 0 0
Fresh Water Operator Base Fluid Water 7732-18-5 100 86.1666 152,675,000.0
HAI-OS ACID INHIBITOR Halliburton Corrosion Inhibitor Listed Below Listed Below 0 0 0
HYDROCHLORIC ACID Halliburton Solvent Listed Below Listed Below 0 0 0
FE-1A ACIDIZING COMPOSITION Halliburton Additive Listed Below Listed Below 0 0 0
Ingredients Listed Above Listed Above Water 7732-18-5 100 0.437078 774442
SAND-PREMIUM WHITE-40/70, BULK Halliburton Proppant Listed Below Listed Below 0 0 0
LCA-1 Halliburton Solvent Listed Below Listed Below 0 0 0
Hydrotreated light petroleum distillate 64742-47-8 30 0.0197569 35007
Ethoxylated alcohols Proprietary 30 0.000203247 361
Sorbitan monooleate polyoxyethylene derivative 9005-65-6 5 0.00329281 5835
Fatty acids, tall oil Proprietary 30 0.000203247 361
Phosphoric acid 7664-38-2 0.1 0.00002158 39
Acetic acid 64-19-7 60 0.00491524 8710
Hdrotreated light petrolem distillates Proprietary 100 0.00008294 147
Hydrochloric acid 7647-01-0 15 0.0560981 99398.3
Ethoxylated branched C13 alcohol 78330-21-9 5 0.00329281 5835
Acrylamide 79-06-1 0.01 0.00000659 12
Acetic anhydride 108-24-7 100 0.00819206 14516
Sobitan, mono-9-octadecenoate, (Z) 1338-43-8 5 0.00329281 5835
Glutaraldehyde 111-30-8 30 0.00647347 11471
Acetate compound Proprietary 5 0.00329281 5835
Acrylamide polymer Proprietary 30 0.0197569 35007
Propargyl alcohol 107-19-7 10 0.00006775 121
Olefins Proprietary 5 0.00008130 148
Ethanol 64-17-5 1 0.000215782 383
Quaternary ammonium compounds,

benzyl-C12-16-alkyldimethyl chlorides

68424-85-1 5 0.00107891 1912
Modified thiourea polymer Proprietary 30 0.000203247 361
Crystalline silica, quartz 14808-60-7 100 13.3431 23,642,200.0
Citric acid 77-92-9 60 0.00566678 10041
Methanol 67-56-1 60 0.000436704 775
Sodium perborate tetrahydrate 10486-00-7 100 0.0104142 18453
FE-2A Halliburton Additive Listed Below Listed Below 0 0 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-08-01 H2O 15 324897 Gal 441160 Halliburton STAGE 1 OF 54
2018-09-05 H2O 15 317989 Gal 439660 Halliburton STAGE 54 OF 54…SEE IMAGES FOR STAGES 2-53

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 EQUINOR USA ONSHORE PROPERTIES 1047148 0 92
2019 EQUINOR USA ONSHORE PROPERTIES 1782145 0 89

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 EQUINOR USA ONSHORE PROPERTIES Brine 18736 92
2019 EQUINOR USA ONSHORE PROPERTIES Brine 34012 89

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-402571256 2018-2-13 0:00: DD No Violations 3.50
0246804385 2018-08-15 Completion Testing No Violations Status check inspection on the well completion process found Halliburton Pressure pumping service on location stimulating the 3 wells present and Horizontal Wireline on location providing the wireline service. The last stage treated was stage 22 with a average treating pressure of 10,000 pounds and break pressure of 8,400 pounds per square inch pressure (psi) the initial shut in pressure for the wells on the pad has been averaging 6,400 psi. Horizontal wirelline perforated the stage in 6 clusters with 40 perforations total. The stage was perforated between the depths of 18,912 and 19,096 and a completion plug will be set at 19,096. The company is monitoring all annuli electronically. All stimulation and support equipment is placed on polymer containment.
0402571256 2018-02-13 Drill / Deepen / Reopen No Violations Status check inspection follow up to a complaint received by ODNR Wildlife officer Wesley Feldner on 02/11/2018. On this day I met on site with Stat Oil employee Brett Pugh who indicated a catch basing drain system situated on the well pad at a coordinates of 39.67850 x 80.89803 had failed and was allowing fluid to by pass the drain and exit on the North East slope. The complaint nature was that soap suds were found in a ditch line directly below the drain outlet however no product was found in the ditch on this day. ODNR Engineer Technician Andy Thomas was notified of the construction defect and was going to address the issue with Stat Oil Construction Supervisor Vinnie Dewiler. The entire well pad perimeter was inspected on this day.
0480921833 2018-07-30 Completion Testing No Violations On this day, I accompanied ODNR Inspector William Stolarik. Please reference his comments for a detailed report. Halliburton is in their preparation phase to begin hydraulic fracturing. We spoke with Statoil Field Completions Superintendent, Darren Galisky, and conducted a walkthrough of the pad and equipment onsite.
0604727998 2017-11-22 Casing String Witnessed No Violations On site inspection to witness the surface casing cement job with Orion Drilling Polaris rig 14 on location along with Schlumberger Cement Service. The rig has drilled a 17.5 diameter well bore to a measured depth of 2,065 and was attempting to run the 13.375 diameter casing while I was on location for 2 hours. They casing tally allowed for 16 of rat hole below the casing and the casing was sitting down 70 from a total casing set depth of 2,049. The company loaded the casing and hole with fresh water however did not install the Franks Casing circulating tool initially and after several hours they decided to lay down the one casing joint and pick up the CRT circulating tool. I left location at 2:00 am and the company man reported that they were able to get the casing installed and past what they believed to be a ledge in the well bore. The job was finished by 7:00 am the next day.
1518477503 2018-02-12 Drill / Deepen / Reopen No Violations
1532974237 2018-07-30 Completion Testing No Violations Status check inspection on the well completion process accompanied by ODNR Inspector Tom Thomas along with Darrin Galisky representing Stat Oil. Current operations are the well drilling process is complete and Halliburton pressure pumping along with Allied Horizontal Wireline is rigging up preparing to begin stimulation operations on the 3 wells present on the pad. All stimulation support equipment is situated on polymer liner. The well head completion stack consists of a primary master valve situated atop the B section of the well head followed by a hydraulic master valve then the well head flow cross. Atop the flow cross is a upper hydraulic master valve followed by the pressure lines before the wireline head attachment point. There is a separate accumulator control for each well on the pad. The well completion operations are to begin in the next 48 hours.
1555426130 2019-04-16 Preliminary Restoration No Violations On this day, I am conducting a preliminary restoration inspection. The site meets ORC 1509.072 (A). I found the pad gated with signage at the entrance. There are (3) producing wells, (3) gas processing units, (3) 400-barrel steel production tanks within steel containment, and an Emergency Shutdown (ESD) button is present at the pad entrance. Concrete barriers surround the perimeter of the wellheads. Each well has annular pressure monitoring devices equipped. Greg Davis, Equinor Representative, was notified to label the gauges and wellheads with proper identification. Mr. Davis also stated that annular pressures are monitored daily. It will be noted that a third-party contractor, FMC Technologies, is onsite with secondary sand traps.
1601726166 2020-1-21 0:00: PW No Violations 1.00
1930953685 2020-1-21 0:00: PW No Violations 0.20
2122974588 2020-1-21 0:00: PW No Violations 1.00
246804385 2018-8-15 0:00: CT No Violations 0.30
480921833 2018-7-30 0:00: CT No Violations 0.30
604727998 2017-11-22 0:00 CS No Violations 3.50

For data sources see[10]

References