34-111-24808

Well Details

Well ID: 34-111-24808
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Ohio Township
Operator Name: EQUINOR USA ONSHORE PROPERTIES
Well Pad ID: US-OH-001526
Farm/Lease Name: STALDER S
License Status: Producing
License Date: 2017-12-08
Spud Date: 2017-12-19
Spud Drilling Contractor: NABORS DRILLING
Final Drill Date: 2018-03-18
Well Total Depth: 22987.00 ft
Configuration: Horizontal
Latitude: 39.680000
Longitude: -80.920000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-12-08 Proposed Formations:POINT PLEASANT, Issued Date:12/8/2017, Expired Date:12/8/2019 12:00:00 PM, Drilling unit acres:540.531, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2018-03-18
Change of Owner 2018-08-08 Operator changed from 9065, STATOIL USA ONSHORE PROPERTIES INC to 10187, EQUINOR USA ONSHORE PROPERTIES INC.
Correction to Well 2019-01-25 UPDATE TARGET/TAKE PER AS-DRILLED PLAT
Completion Report Received 2019-02-07
Record Last Modified 2019-06-12
Construction Permit Expires 2019-12-08

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2019-03-13 11193 11360 0
2019-03-13 22601 22761 0
22601 22761 0
11193 11360 0
11193 11360 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 08/01/2018 08/01/2018 10735 19,490,000.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 HAI-OS ACID INHIBITOR Halliburton Corrosion Inhibitor Listed Below Listed Below 0 0 0
MC B-8614 Halliburton Biocide Listed Below Listed Below 0 0 0
Ingredients Listed Above Listed Above Water 7732-18-5 100 0.459138 867974
FIGHTR EC-1 Halliburton Friction Reducer Listed Below Listed Below 0 0 0
SAND-PREMIUM WHITE-40/70, BULK Halliburton Proppant Listed Below Listed Below 0 0 0
Hydrotreated light petroleum distillate 64742-47-8 30 0.0206394 39018
Sobitan, mono-9-octadecenoate, (Z) 1338-43-8 5 0.0034399 6503
Crystalline silica, quartz 14808-60-7 100 13.5026 25,525,900.0
Sodium perborate tetrahydrate 10486-00-7 100 0.00963005 18205
Ethoxylated branched C13 alcohol 78330-21-9 5 0.0034399 6503
Ethoxylated alcohols Proprietary 30 0.000214017 405
Olefins Proprietary 5 0.00008561 164
Glutaraldehyde 111-30-8 30 0.00661318 12502
Modified thiourea polymer Proprietary 30 0.000214017 405
Quaternary ammonium compounds,

benzyl-C12-16-alkyldimethyl chlorides

68424-85-1 5 0.0011022 2084
Acrylamide, sodium acrylate polymer 25987-30-8 30 0.0206394 39018
Citric acid 77-92-9 60 0.00596051 11268
Acrylamide 79-06-1 0.01 0.00000688 14
Hydrochloric acid 7647-01-0 15 0.05904 111612
Sorbitan monooleate polyoxyethylene derivative 9005-65-6 5 0.0034399 6503
Ethanol 64-17-5 1 0.000220439 417
Propargyl alcohol 107-19-7 10 0.00007134 135
Phosphoric acid 7664-38-2 0.1 0.00002204 42
Fatty acids, tall oil Proprietary 30 0.000214017 405
Acetic acid 64-19-7 100 0.00918407 17362
Methanol 67-56-1 60 0.000458896 869
Acetate compound Proprietary 5 0.0034399 6503
HYDROCHLORIC ACID Halliburton Solvent Listed Below Listed Below 0 0 0
FE-2A Halliburton Additive Listed Below Listed Below 0 0 0
FE-1 Halliburton Additive Listed Below Listed Below 0 0 0
Fresh Water Operator Base Fluid Water 7732-18-5 100 85.9834 162,546,000.0
OptiKleen-WF(TM) Halliburton Concentrate Listed Below Listed Below 0 0 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-07-26 H2O 15 317127 Gal 438940 Halliburton STAGE 58 OF 58…SEE IMAGES FOR STAGES 2-57
2018-06-10 H2O 15 344537 Gal 444900 Halliburton STAGE 1 OF 58

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 EQUINOR USA ONSHORE PROPERTIES 1684834 0 91
2019 EQUINOR USA ONSHORE PROPERTIES 1557166 0 88

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 EQUINOR USA ONSHORE PROPERTIES Brine 48586 91
2019 EQUINOR USA ONSHORE PROPERTIES Brine 34051 88

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0100176108 2017-12-22 Casing String Witnessed No Violations Onsite inspection to witness the conductor casing cement job with Express Energy Services. The rig drilled a 26-inch diameter borehole to a depth of 100 feet from ground level. 100 feet of 20-inch diameter weld connection casing was inserted into the borehole. At approximately 24 barrels (114 sacks) of cement into the job, the conductor became plugged and was unable to continue pumping cement. Attempts were made to lift the conductor without success. The job was completed by filling the annulus of the hole with 153 sacks of Class A cement with a 1.18 yield, 2 percent calcium chloride, 0.5 pound of flake, and witnessing returns to surface. The cement proceeded to slowly settle back into the borehole. The cement appears to be being lost to a formation approximately 40 feet in depth downhole. They are going to let it settle and solidify for a few days, and come back to top it off. The remaining cement left in the conductor will be drilled down to 90 feet, thus leaving a 10-foot shoe in the conductor.
0827917438 2019-04-16 Preliminary Restoration No Violations On this day, I am conducting a preliminary restoration inspection. The site meets ORC 1509.072 (A). Annular pressure monitoring devices are equipped, along with proper identification. The 9.625 inch diameter intermediate casing has a pressure of 250 pounds per square inch (psi), and the 13.375 inch diameter surface casing has a pressure of 0 psi. The production records are current.
0863890212 2018-02-20 Drill / Deepen / Reopen No Violations On this day, I am checking in with CNX Company Man Kevin Perdue while the Nabors X13 rig is in the process of rigging up. Kevin has stated that they expect to start drilling February 23rd. I conducted a perimeter walk of the pad which appears to have drainage issues and considerable amounts of standing water across the surface. Due to the excessive rainfall, removal of the water will be addressed.
100176108 2017-12-22 0:00 CS No Violations 2.00
1130671445 2018-02-22 Drill / Deepen / Reopen No Violations On this day, I accompanied ODNR Inspector William Stolarik to discuss the upcoming operations with Mike Cannon. Please reference his comments for a detailed report. Nabors X13 drilling rig is still in the process of rigging up and anticipated to start drilling on February 23rd. Due to the new crew on this location, contact information was exchanged. Discussions about the removal or discharge of the rainwater on the pad were addressed.
1514299862 2017-12-26 Casing String Witnessed No Violations Onsite inspection to witness the conductor casing cement job with Express Energy Services and Caldwell Redi-Mix. The conductor was topped off with redi mix concrete by dumping it down the annulus of the hole and filling it to surface. Cement is witnessed at surface and has stabilized at the cellar floor.
1519334559 2018-02-22 Drill / Deepen / Reopen No Violations Status check inspection and pre spud meeting accompanied by ODNR Inspector Tom Thomas. On this day we met with Stat Oil representatives Colin Heckler and Mike Cannon and discussed the well pad containment and rig under containment and well as the drilling permit conditions and casing program. Neighbors rig X 13 is set op on location and is scheduled to spud in the next 48 hours. The Stat Oil Representatives have been provided with Inspector Tom Thomas contact information and understand He will act as the lead point for the Division. The well pad operations regarding containment have been explained and the Company understands the Division has no set directives regarding direct operations and only if there is product released in excess or above reportable quantities will we give direction.
1519708535 2018-02-26 Casing String Witnessed No Violations On this day, I am onsite to witness the 13.375-inch diameter surface casing cement job with Halliburton Energy Services. The Nabors X13 rig drilled a 17.5-inch diameter borehole to a depth of 1,852 feet from a KB of 32 feet. Wyoming Casing inserted 1800 feet of 13.375-inch diameter J-55 54.50 lb/ft casing into the borehole. Halliburton Energy Services initially pumped 40 barrels of 6% gel spacer, followed by 10 barrels of fresh water spacer. They cemented the casing with 348 barrels total volume of 1,595 sacks of Class A cement with a 1.227 yield, and a weight of 15.8 ppg gallon. It was displaced with 270 barrels of fresh water. The plug landed with 750 psi and then pressured up to 1,250 psi. 30 barrels of cement returns were brought to surface.
1520532740 2018-03-08 Drill / Deepen / Reopen No Violations On this day, I spoke with company man Kevin Perdue, and found the Nabors X13 rig has drilled the 12.25 inch diameter borehole to a total depth of 9, 843 feet. Wyoming Casing is currently running 9.625 inch diameter casing in the hole. They are projected to continue drilling with oil based drilling fluid. It will be noted that the Clinton formation top came in at 8,604 TVD.
1575910356 2019-12-9 0:00: PW No Violations 0.40
1659350763 2019-01-28 Production Wells No Violations On this day, I found the pad gated with signage at the entrance. The drilling and completions processes are finalized and the wells are now in production. There are (3) producing wells, (3) gas processing units with sand-traps, (3) 400-barrel steel production tanks within steel containment, and an Emergency Shutdown (ESD) button is present at the pad entrance. Concrete barriers surround the perimeter of the wellheads. Each well has identification and annular pressure monitoring devices equipped. The 9.625 inch diameter intermediate casing has a pressure of 600 pounds per square inch (psi), and the 13.375 inch diameter surface casing has a pressure of 300 psi. It will be noted that I spoke with Equinor representatives Jarrett Howell, Pat Reynolds, and Will Cramblett during the inspection. Additionally, EnerCorp is onsite with secondary sand-traps present at the wellheads.
441588065 2020-6-9 0:00:0 PW No Violations 6.20
827917438 2019-4-16 0:00: PL No Violations 0.20
863890212 2018-2-20 0:00: DD No Violations 2.00