X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-111-24825

Well Details

Well ID: 34-111-24825
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Benton Township
Operator Name: TRIAD HUNTER LLC
Well Pad ID: US-OH-001543
Farm/Lease Name: POOL
License Status: Producing
License Date: 2018-03-07
Spud Date: 2018-03-21
Spud Drilling Contractor: H&P DRILLING
Final Drill Date: 2018-05-30
Well Total Depth: 18001.00 ft
Configuration: Horizontal
Latitude: 39.590000
Longitude: -81.100000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2018-03-07 Proposed Formations:POINT PLEASANT, Issued Date:3/7/2018, Expired Date:3/6/2020 12:00:00 PM, Drilling unit acres:686.7, Proposed Well Type:OG, Proposed Well Class:EOUT
Reached Total Depth 2018-05-30 UPDATE STATUS PER PRODUCTION RECEIVED 12/18/18-ALE.
Completion Report Received 2019-01-15 UPDATE STATUS PER PRODUCTION RECEIVED 12/18/18-ALE.
Record Last Modified 2019-01-24 UPDATE STATUS PER PRODUCTION RECEIVED 12/18/18-ALE.
Correction to Well 2019-01-25 UPDATE TARGET/TAKER PER AS-DRILLED PLAT
Construction Permit Expires 2020-03-06 UPDATE STATUS PER PRODUCTION RECEIVED 12/18/18-ALE.

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2019-04-02 10338 10480 0
2019-04-02 17835 17925 0
17835 17925 0
10338 10480 0
10338 10480 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 07/09/2018 07/29/2018 9538 12,689,400.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 SI-20 Moon Scale inhibitor Phosphinocarboxylic Acid 110224-99-2 45 0.0101139 12329.2
Water 7732-18-5 55 0.0123614 15069.1
NEFE-180 Chemplex Corrosion Inhibitor/Iron Control Acetic acid 64-19-7 65 0.00151359 1845.14
2-Ethylhexanol 104-76-7 10 0.000232861 283.867
Methanol 67-56-1 35 0.000815012 993.534
Fatty acids, tall oil 61790-12-3 5 0.00011643 141.933
2-Propyn-1-ol 107-19-7 5 0.00011643 141.933
Alcohols, C14-15, ethoxylated 68951-67-7 5 0.00011643 141.933
Olefin Proprietary 5 0.00011643 141.933
Coconut oil acid diethanolamine 68603-42-9 5 0.00011643 141.933
K-BAC 1005 WST Biocide 2,2-Dibromo-3-nitrilopropionamide 10222-01-2 5.8 0.000805955 982.494
Water 7732-18-5 44.3 0.00619858 7556.33
Polyethylene glycol 25322-68-3 50 0.00699614 8528.59
Sand (Silca) Muskie Proppant Silica Substrate 14808-60-7 100 12.2649 14,951,500.0
Plexgel 907L-EB Chemplex Gelling Agent Guar Gum 9000-30-0 50 0.00004100 49.978
Alcohol ethoxylate 34398-01-1 1 0.00000082 1
Organophylic Clay Proprietary 2 0.00000164 1.999
Distilates (petroleum), Hydrotreated Light 64742-47-8 50 0.00004100 49.978
Cyrstaline silca 14808-60-7 0.1 0.00000005 0.06
Water Blue Ridge Mountain Resources Carrier Fluid Water 7732-18-5 100 86.8656 105,893,000.0
Hydrochloric Acid (28%) Oxy Acidizing Hydrochloric Acid (Hydrogen Chloride) 7647-01-0 28 0.105415 128505
Water 7732-18-5 72 0.271066 330441
Plexslick 957 Chemplex Friction Reducer Oleic Acid Diethanolamide 93-83-4 1.5 0.000995024 1212.98
Ammonium Chloride 12125-02-9 2 0.0013267 1617.3
Water 7732-18-5 60 0.039801 48519
Alcohols, C12-16, Ethoxylated 68551-12-2 1.5 0.000995024 1212.98
Petroleum Distillate 64742-47-8 20 0.013267 16173
Sodium Persulfate Chemplex Gel Breaker Disodium peroxodisulphate 7775-27-1 100 0.00000164 2
Sand (Resin coated) Muskie Proppant Silica Substrate 14808-60-7 96 0.372237 453773
Phenolic Resin 9003-35-4 4 0.0155099 18907.2
Other Chemical(s) Listed Above See Trade Name(s) List Water 7732-18-5 60 0.039801 48519
Ammonium Chloride 12125-02-9 2 0.0013267 1617.3
Organophylic Clay Proprietary 2 0.00000164 1.999
Water 7732-18-5 55 0.0123614 15069.1
Water 7732-18-5 72 0.271066 330441
Guar Gum 9000-30-0 50 0.00004100 49.978
2-Ethylhexanol 104-76-7 10 0.000232861 283.867
Fatty acids, tall oil 61790-12-3 5 0.00011643 141.933
Polyethylene glycol 25322-68-3 50 0.00699614 8528.59
Coconut oil acid diethanolamine 68603-42-9 5 0.00011643 141.933
Alcohols, C12-16, Ethoxylated 68551-12-2 1.5 0.000995024 1212.98
Methanol 67-56-1 35 0.000815012 993.534
Oleic Acid Diethanolamide 93-83-4 1.5 0.000995024 1212.98
2-Propyn-1-ol 107-19-7 5 0.00011643 141.933
Phenolic Resin 9003-35-4 4 0.0155099 18907.2
Cyrstaline silca 14808-60-7 0.1 0.00000005 0.06
Alcohols, C14-15, ethoxylated 68951-67-7 5 0.00011643 141.933
Water 7732-18-5 44.3 0.00619858 7556.33
Olefin Proprietary 5 0.00011643 141.933
Alcohol ethoxylate 34398-01-1 1 0.00000082 1

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-07-09 H2O 15 8072 Bbl 347220 STINGRAY PRESSURE PUMPING LLC STAGE 1/44

STAGES 2-43 SEE IMAGES

2018-07-29 H2O 15 6121 Bbl 349360 STINGRAY PRESSURE PUMPING LLC STAGE 44/44

STAGES 2-43 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 TRIAD HUNTER LLC 1447063 0 184
2019 TRIAD HUNTER LLC 1130214 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 TRIAD HUNTER LLC Brine 36109 184
2019 TRIAD HUNTER LLC Brine 25054 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1314311428 2020-9-3 0:00:0 PL No Violations 0.40
-1561744010 2018-3-22 0:00: CS No Violations 1.00
-1789334624 2018-8-21 0:00: CT No Violations 0.50
-2103609495 2018-6-25 0:00: CT No Violations 0.30
1523622065 2018-04-13 Casing String Witnessed No Violations On site inspection to witness the surface casing cement job with H&P Drilling rig 371 on location along with C&J Cement Service. The rig has drilled a 17.5 diameter surface borehole to a measured depth of 1,500 with the depth measured off a drilling rig Kelly Bushing heigth of 25 above grade level. The borehole was drilled on air with a hammer bit and upon reaching total depth several soap sweeps were ran to condition the borehole before pulling the drill string and starting in the hole with the 13.375 J-55 Grade Buttress Thread 61 pound per foot casing. The company ran a casing guide shoe and float collar along with centralizers on every 3rd casing collar. The casing was set 26 off bottom and upon landing the casing the cement head was installed and the circulation was established with fresh water before commencing the cement job. The casing was then cemented by pumping a 40 barrel 6% gel spacer followed by a 278 barrel cement mix consisting of 1,225 sacks of class A cement with a 15.6 pound per gallon weight verified by weight of scale and a 1.24 yield by design. 38% cement excess was ran. The cement and plug was displaced with 217 barrels of fresh water to the casing float collar set at 1,432. Upon reaching total displacement at 217 barrels with a final displacement pressure of 459 (psi) pounds per square inch the plug was landed and the casing pressure tested for 5 minutes at 984 psi. 82 barrels of cement returns were witnessed to surface. I also spoke with both company men on site and explained the well construction rules regarding annular pressure monitoring as described 1501:9-1-08 of the well construction rules. Also addressed on his day was the area affected by the well pad construction especially but not limited to the South East facing well pad slope where soil sediment has exited the depicted limits of disturbance depicted in the well pad construction drawings. It was observed and photographed that earthen sediment has also entered a wet weather stream
1523983895 2018-04-17 Drill / Deepen / Reopen No Violations
1561744010 2018-03-22 Casing String Witnessed No Violations The purpose of my inspection was to witness cement operations on the conductor casing. Express Energy was on location with 2 auger rigs, 2 bulk cement trucks, and one pump truck. The borehole was 26 inches in diameter and was drilled to 120 feet in depth. No water was encountered during the drilling process. A 20 inch diameter conductor was set on bottom of the borehole at 120 feet. Express held a pre job safety meeting with all personnel on location. Following the safety meeting Expressed plumbed up to the casing and pumped 10 barrels of fresh water ahead of 230 sacks of class A cement weighing 15.6 pounds per gallon and 39 barrels of fresh water for displacement. 10 feet of cement was left within the casing and the remaining cement filled the annuals and circulated to surface. Returns were siphoned from the cellar.
1664699085 2018-07-23 Completion Testing No Violations
1789334624 2018-08-21 Completion Testing No Violations Status check inspection found the well drilling -stimulation and completion drill out operations now complete. The company man on site indicated that 2.875 diameter L-80 grade 6.5 pound per foot production tubing was set in the well bore on a tubing hanger. The tubing was set to a measured depth of 10,106 with a tubing profile X nipple set in the string at 9,615 and an XN nipple also set in the string at 10,073. The tubing hanger was positive pressure tested to 7,500 pounds per square inch for 15 minutes then negative tested for 15 minutes also. The well head consists of a lower A and upper B section followed by a production flow cross then a tubing flow cross. The tubing flow cross consists of a primary master valve followed by a secondary master valve with a total of (2) emergency shut down valves present in the well head production assembly. Crews are on site installing the production equipment downstream from the well head assembly. Crews are also on site mopping up from the completion process which includes pressure washing and removing all containment mats, all fluid created is being recovered and hauled from site by the means of a vacuum truck. All perimeter drain valves are in the closed position and no surface water is being discharged. 3 wells are present on this pad.
2103609495 2018-06-25 Completion Testing No Violations Status check inspection on the well completion process found the company has installed a lower master valve and is preparing the well for stimulation. Annular pressure monitoring is in place and is being checked daily. The company will fill the mouse holes and pour extra concrete in the cellar up to the base plate of the surface casing tomorrow morning. This will be to add extra support to the well head. The well pad earthen poly liner is intact with rubber mats in place on the liner. All rig equipment is off site. There will be an above ground storage tank placed on the well pad location. Stimulation will begin in the next 2 weeks.

For data sources see[10]

References