X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-121-24487

Well Details

Well ID: 34-121-24487
Loading map...
Country: United States
State: Ohio
County: Noble
Municipality: Beaver Township
Operator Name: ANTERO RESOURCES CORPORATION
Well Pad ID: US-OH-000626
Farm/Lease Name: GRISSOM UNIT
License Status: Producing
License Date: 2014-05-23
Spud Date: 2014-05-17
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2014-08-14
Well Total Depth: 15246.00 ft
Configuration: Horizontal
Latitude: 39.910000
Longitude: -81.310000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-04-03 Proposed Formations:POINT PLEASANT, Issued Date:4/3/2014, Expired Date:4/2/2016 12:00:00 PM, Drilling unit acres:549.201, Proposed Well Type:OG, Proposed Well Class:EOUT
APP 2014-05-23 Proposed Formations:POINT PLEASANT, Issued Date:5/23/2014, Expired Date:5/22/2016 12:00:00 PM, Drilling unit acres:487.822, Proposed Well Type:OG, Proposed Well Class:EOUT
Reached Total Depth 2014-08-14
Correction to Well 2015-01-30 CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
Completion Report Received 2015-04-20
Construction Permit Expires 2016-05-22
Record Last Modified 2017-10-23

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2015-04-20 7922 15121 0
7922 15121 0
7922 15121 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 11/19/2014 12/04/2014 7899 10,324,800.0 485725

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 AP One U.S. Well Services, LLC Gel Breakers Ammonium Persulfate 7727-54-0 100 0.00172 1653
Water Antero Resources Base Fluid Water 7732-18-5 100 89.6514 86,109,000.0
SI-1100 U.S. Well Services Scale Inhibitor Potassium salt of diethylene triamine

penta (methylene phosphonic acid)

15827-60-8 10 0.00179 1715.87
bis (hexamethylene) tramine penta

(methylene phosphonic acid) - phosphate acid

40623-75-4 10 0.00152 1461.67
2-Phosphonobutane 1,2,4 tricarboxylic salt 37971-36-1 10 0.00171 1639.61
Ethylene Glycol 107-21-1 40 0.00598 5744.99
hexamethylenediamine tetra (methylene phosphonic acid) 38820-59-6 10 0.00165 1588.77
Acrylic polymer 52255-49-9 5 0.00066 635.508
Di Water 7732-18-5 80 0.01059 10168.1
Copolymer of Maleic and Acrylic acid 26677-99-6 10 0.00156 1500
WFRA-405 U.S. Well Services, LLC Friction Reducer Crystalline Salt 12125-02-9 5 0.00349 3351.43
Petroleum Distillates 64742-47-8 40 0.02247 21583.2
Water 7732-18-5 40 0.02791 26811.4
Anionic Polyacrylamide Proprietary 40 0.02791 26811.4
Ethoxylated alcohol blend Proprietary 5 0.00349 3351.43
K-BAC 1020 U.S. Well Services, LLC Anti-Bacterial Agent Deionized Water 7732-18-5 28 0.00258 2475.31
2,2-dibromo-3-nitrilopropionamide 10222-01-2 20 0.00451 4333.56
HCL Acid (12.6%-18.0%) U.S. Well Services, LLC Bulk Acid Hydrogen Chloride 7647-01-1 18 0.03354 32215.8
Water 7732-18-5 87.5 0.14042 134869
Sand U.S. Well Services, LLC Proppant Crystalline Silica, quartz 14808-60-7 100 9.96277 9,569,110.0
AI-301 U.S. Well Services, LLC Acid Corrosion Inhibitors Polyethylene polyamine 68603-67-8 10 0.00006000 62.148
Coco amine 61791-14-8 5 0.00003000 28.3894
Methenamine 100-97-0 20 0.00017 164.165
Diethylene Glycol 111-46-6 30 0.00022 207.181
Hydrogen Chloride 7647-01-0 10 0.00007000 71.5906
LGC-15 U.S. Well Services, LLC Gelling Agents Petroleum Distillates 64742-47-8 60 0.04024 38650.8
Surfactant 68439-51-0 3 0.00255 2448.68
Guar Gum 9000-30-0 50 0.04249 40811.4
Suspending agent (solid) 14808-60-7 3 0.0065 6241.74

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2014-12-04 H2O 15 5735 Bbl 241480 US Well Services Inc STAGE 41/41

60 SHOTS

2014-11-19 H2O 15 6056 Bbl 206197 US Well Services Inc STAGE 1/41

60 STAGES STAGES 2-40 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2015 ANTERO RESOURCES CORPORATION 1619229 37947 365
2016 ANTERO RESOURCES CORPORATION 812308 2712 361
2017 ANTERO RESOURCES CORPORATION 394544 913 365
2018 ANTERO RESOURCES CORPORATION 219559 471 353
2019 ANTERO RESOURCES CORPORATION 64134 124 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2015 ANTERO RESOURCES CORPORATION Brine 16754 365
2016 ANTERO RESOURCES CORPORATION Brine 7755 361
2017 ANTERO RESOURCES CORPORATION Brine 3199 365
2018 ANTERO RESOURCES CORPORATION Brine 1175 353
2019 ANTERO RESOURCES CORPORATION Brine 393 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1400228186 2018-7-16 0:00: PW No Violations 0.10
-1489129033 2018-6-12 0:00: PW No Violations 0.20
-1668165193 2014-8-14 0:00: CS No Violations 2.00
-1674770703 2017-8-15 0:00: PW No Violations 0.50
-1676898226 2020-4-28 0:00: PW No Violations 0.20
-2123473810 2015-6-16 0:00: PW No Violations 0.20
-233051276 2018-3-8 0:00:0 PW No Violations 0.20
-390723789 2015-2-11 0:00: PL No Violations 0.50
-787824453 2014-5-18 0:00: CS No Violations 3.00
-796883859 2019-10-10 0:00 PW No Violations 1.00
0233051276 2018-03-08 Production Wells No Violations The purpose of my inspection was a status check on a cut slope slip failure. The pad name is Roe and there are a total of 7 wells. The slip occurred in the cut slope of the pad in the Northwest corner where the eight 400 barrel tanks and two vapor recovery towers were located. That equipment had been removed in order for Antero to take remedial action on the slope failure. The remaining production equipment and wellheads were outside the area of concern. ODNR Division of Oil and Gas Engineering Section is currently working with Antero Resources with planning the material modification to repair the slope.
0390723789 2015-02-11 Preliminary Restoration No Violations My inspection today finds the well site meets the preliminary restoration requirements. The tank battery is comprised of eight 500 barrel tanks set inside a liquid tight plastic liner.
0617772956 2017-01-20 Production Wells No Violations The purpose of my inspection is a status check on a producing well. The pad name is Roe and there are a total of 7 wells on this pad. During my inspection the well was equipped with a production tree style wellhead. The production equipment for this well consists of eight 400 barrel tanks within containment, and seven gas processing units. The vapor recovery system consists of two compressors and three Cimarron combustors. The production records are current, the identification is located at the wellhead, and there are no violations present.
0787824453 2014-05-18 Casing String Witnessed No Violations My inspection today finds Express drilled the well to 101 and ran 100 of 26 casing. Express Energy Services also cemented the casing in place by circulating 330 sks of class A cement. The mix water was sourced from a Caldwell municipal source. Chlorides tested below 250 ppm. I witnessed 19 bbl returns to surface.
0805751592 2018-04-20 Production Wells No Violations During my inspection contractors for Antero Resources were on location running lines to the combustors. The production equipment had been relocated due to a slip near the old orientation of the production equipment on the north side of the pad.
0889614485 2014-07-03 Casing String Witnessed No Violations
0968443485 2018-03-05 Production Wells No Violations
1130534187 2017-05-09 Production Wells No Violations The purpose of my inspection was a status check on a producing well. The pad is named Roe and there are a total of 7 wells on this pad. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Gauges present read 290 pounds per square inch on the casing and 170 pounds per square inch on the tubing. Annular pressure monitoring was present. The production equipment for this well consists of eight 400 barrel tanks, seven gas processing units, two compressors, and two Cimarron combustors. The pipeline tie in is located on the west side of the pad. The production records are current, the identification is located at the wellhead, and there are no violations present.
1400228186 2018-07-16 Production Wells No Violations The purpose of my inspection today was to witness Antero re-assembling the Grissom 1H plunger lift system. The well was equipped with a plunger lift system with valves in the open position. A pressure gauge was present on all casing strings. Accompanied by Antero Production Superintendent during my inspection.
1489129033 2018-06-12 Production Wells No Violations Prior inspection found contractors for Antero relocating and reassembling production equipment due to a slip in the cut slope of the North side if the pad. During my inspection today, the tank battery had been moved and reset within steel containment and the vapor recovery system had been connected. The well was equipped with a production tree style wellhead with a plunger lift system. Production valves were in the open position. A gauge was present on the production tubing reading 170 pounds per square inch, 285 pounds per square inch on the production casing, 0 pounds per square inch on the 9.625 inch diameter intermediate casing, and 150 pounds per square inch on the 13.375 inch diameter surface casing. The production equipment consisted of four 400 barrel tanks, seven gas production units, and two combustors. The identification was located at the wellhead.
1569600020 2018-03-21 Production Wells No Violations The purpose of my inspection was a status check. The pad is named Roe and there are a total of 7 wells. During my inspection construction equipment was on location to make repairs to the slips located on the cut slope and fill slopes of the pad. Antero is actively working with ODNR Division of Oil and Gas Engineering section to make necessary slip repairs. The slips do not oppose any threat to the wells and the wells are under continuous pressure monitoring.
1668165193 2014-08-14 Casing String Witnessed No Violations I am onsite to monitor the cementing operations on the production casing string. The drilling rig ran 15,246 of 5.5 casing. Allied cemented the casing in place with a 301 sack lead cement slurry of class H and Poz. in equal amounts. The tail cement consisted of 1300 sacks of class H cement.
1674770703 2017-08-15 Production Wells No Violations The purpose of my inspection was a status check on a production well. The pad is named Roe and there are a total of 7 wells. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Gauges present read 277 pounds per square inch on the casing, 170 pounds per square inch on the tubing, and 160 pounds per square inch on the annulus. The production equipment for the well consists of eight 400 barrel tanks, seven gas processing units, two compressors, and two Cimarron combustors. The pipeline tie in is located on the west side of the pad. The production records are current, and the identification is located at the wellhead.
2123473810 2015-06-16 Production Wells No Violations The well is equipped in a manner consistent with being capable of production. All drainage sumps on the location are closed. No violations were noted during the inspection.
617772956 2017-1-20 0:00: PW No Violations 0.50
805751592 2018-4-20 0:00: PW No Violations 0.20
889614485 2014-7-3 0:00:0 CS No Violations
968443485 2018-3-5 0:00:0 PW No Violations 0.50

For data sources see[10]

References