X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-127-25836

Well Details

Well ID: 34-127-25836
Loading map...
Country: United States
State: Ohio
County: Perry
Municipality: Clayton Township
Operator Name: R C POLING CO INC
Well Pad ID:
Farm/Lease Name: HURST ETAL
License Status: Final Restoration
License Date: 1997-01-08
Spud Date: 1983-01-25
Spud Drilling Contractor: BOWMAN DRILLING
Final Drill Date: 1983-03-12
Well Total Depth: 3378.00 ft
Configuration: Vertical
Latitude: 39.820000
Longitude: -82.180000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1982-12-27 236 POLING R C CO INC GeoDate 12/27/82
Oil and Gas 1982-12-27 Issued Date 12/27/82 Expired Date 6/25/83 Acres 0020000 Tool Type CT Proposed Formation CLINTON Proposed Depth 03378 Proposed Drill Depth 03378
Original Spud 1983-01-25
Completed 1983-03-12
Reached Total Depth 1983-03-12
Completion Report Received 1983-04-03
CO 1995-12-18 236 POLING R C CO INC GeoDate 12/18/95
Unknown 1995-12-18 Issued Date 12/18/95 Expired Date 12/17/96 Proposed Purpose OG Was Plug Supervised Who Superivsed Plug and Abandon Date
CO 1997-01-08 236 POLING R C CO INC GeoDate 1/8/97
COMBINATION WELL 1997-01-08 Issued Date 1/8/97 Expired Date 1/8/98 Proposed Purpose OG Was Plug Supervised Y Who Superivsed HOUSEHOLDERPlug and Abandon Date 3/28/97
Plugged/Abandoned 1997-03-28
Construction Permit Expires 1998-01-08
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 3342 3376 0
3342 3376 0
3342 3376 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 2100 Bbl 30000 FRAC: 2100 BBL H2O, 30M SAND

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1984 R C POLING CO INC 5629.00 733.00 365
1985 R C POLING CO INC 3421.00 765.00 365
1986 R C POLING CO INC 2207.00 754.00 365
1987 R C POLING CO INC 1337.00 623.00 365
1988 R C POLING CO INC 559.00 532.00 365
1989 R C POLING CO INC 665.00 384.00 365
1990 R C POLING CO INC 34.00 516.00 365
1991 R C POLING CO INC 0.00 144.00 365
1992 R C POLING CO INC 0.00 65.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1984 R C POLING CO INC Brine 0 365
1985 R C POLING CO INC Brine 60 365
1986 R C POLING CO INC Brine 15 365
1987 R C POLING CO INC Brine 20 365
1988 R C POLING CO INC Brine 25 365
1989 R C POLING CO INC Brine 35 365
1990 R C POLING CO INC Brine 35 365
1991 R C POLING CO INC Brine 40 365
1992 R C POLING CO INC Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0000PL6997 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
iDIAN00186 1999-10-04 Final Restoration No Violations
iDIAN001860 1999-10-4 0:00: FR No Violations
PL6997 PL No Violations

For data sources see[9]

References