34-133-22668

Well Details

Well ID: 34-133-22668
Loading map...
Country: United States
State: Ohio
County: <County>
Municipality:
Operator Name: GONZOIL INC
Well Pad ID:
Farm/Lease Name: AURORA INDUSTRIAL PARK
License Status: Final Restoration
License Date: 2017-10-16
Spud Date: 1981-10-12
Spud Drilling Contractor:
Final Drill Date: 1981-10-21
Well Total Depth: 4290.00 ft
Configuration: Vertical
Latitude: 41.280000
Longitude: -81.330000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Original Spud 1981-10-12 UPDATE LOCATION PER DOGRM SURVEYOR ALE 12-11-17.
Completed 1981-10-21 UPDATE LOCATION PER DOGRM SURVEYOR ALE 12-11-17.
Reached Total Depth 1981-10-21 UPDATE LOCATION PER DOGRM SURVEYOR ALE 12-11-17.
CO 1981-10-23 212 WATERCO INC GeoDate 10/23/81
Change of Owner 2001-01-29 Operator changed from 212, WATERCO INC to 70, WALDRON DAVID A & ASS INC
Change of Owner 2016-10-11 Operator changed from 70, DAVID A WALDRON & ASSOC to 9722, PIN OAK ENERGY PARTNERS LLC
Change of Owner 2017-10-10 Operator changed from 9722, PIN OAK ENERGY PARTNERS LLC to 3434, GONZOIL INC
APP 2017-10-16 Proposed Formations:CLINTON SAND, Issued Date:10/16/2017, Expired Date:10/16/2019 12:00:00 PM, Drilling unit acres:48.85, Proposed Well Type:OG, Proposed Well Class:
Plugged/Abandoned 2017-11-10 UPDATE LOCATION PER DOGRM SURVEYOR ALE 12-11-17.
Record Last Modified 2018-04-17 UPDATE LOCATION PER DOGRM SURVEYOR ALE 12-11-17.
Construction Permit Expires 2019-10-16 UPDATE LOCATION PER DOGRM SURVEYOR ALE 12-11-17.

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 4121 4197 44
4121 4197 44
4121 4197 44

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 71640 Gal 30000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1984 WILOCK INC 14183.00 307.00 365
1985 WILOCK INC 9754.00 145.00 202
1986 WILOCK INC 11145.00 299.00 362
1987 WILOCK INC 9040.00 142.00 357
1988 WATERCO INC 7666.00 124.00 365
1989 WILOCK INC 0.00 0.00 365
1990 WILOCK INC 5875.00 0.00 365
1991 WILOCK INC 6110.00 85.00 365
1992 WILOCK INC 5311.00 85.00 365
1993 WATERCO INC 4084.00 84.00 365
1995 WATERCO INC 2078.00 99.00 365
1996 WATERCO INC 1453.00 96.00 365
1997 WATERCO INC 6182.00 0.00 365
1998 WATERCO INC 2517.00 92.00 365
1999 WATERCO INC 2773.00 107.00 365
2000 WATERCO INC 2890.00 0.00 365
2001 DAVID A WALDRON & ASSOC 2420.00 106.00 365
2002 DAVID A WALDRON & ASSOC 1344.00 90.00 365
2003 DAVID A WALDRON & ASSOC 1984.00 0.00 365
2004 DAVID A WALDRON & ASSOC 2253.00 107.00 365
2005 DAVID A WALDRON & ASSOC 1813.00 42.00 365
2006 DAVID A WALDRON & ASSOC 1668.00 81.00 365
2007 DAVID A WALDRON & ASSOC 1981.00 99.00 365
2008 DAVID A WALDRON & ASSOC 1437.00 0.00 365
2009 DAVID A WALDRON & ASSOC 1395.00 79.00 365
2010 DAVID A WALDRON & ASSOC 1791.00 70.00 365
2011 DAVID A WALDRON & ASSOC 1381.00 67.00 365
2012 DAVID A WALDRON & ASSOC 1968.00 0.00 366
2013 DAVID A WALDRON & ASSOC 2337.00 73.00 365
2014 DAVID A WALDRON & ASSOC 1608.00 87.00 365
2015 DAVID A WALDRON & ASSOC 1598.00 41.00 365
2016 DAVID A WALDRON & ASSOC 2154.00 49.00 365
2017 PIN OAK ENERGY PARTNERS LLC 1281.00 31.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1984 WILOCK INC Brine 99 365
1985 WILOCK INC Brine 92 202
1986 WILOCK INC Brine 92 362
1987 WILOCK INC Brine 67 357
1988 WATERCO INC Brine 70 365
1989 WILOCK INC Brine 63 365
1990 WILOCK INC Brine 70 365
1991 WILOCK INC Brine 74 365
1992 WILOCK INC Brine 45 365
1993 WATERCO INC Brine 70 365
1995 WATERCO INC Brine 70 365
1996 WATERCO INC Brine 60 365
1997 WATERCO INC Brine 365
1998 WATERCO INC Brine 88 365
1999 WATERCO INC Brine 35 365
2000 WATERCO INC Brine 0 365
2001 DAVID A WALDRON & ASSOC Brine 68 365
2002 DAVID A WALDRON & ASSOC Brine 0 365
2003 DAVID A WALDRON & ASSOC Brine 38 365
2004 DAVID A WALDRON & ASSOC Brine 51 365
2005 DAVID A WALDRON & ASSOC Brine 0 365
2006 DAVID A WALDRON & ASSOC Brine 49 365
2007 DAVID A WALDRON & ASSOC Brine 0 365
2008 DAVID A WALDRON & ASSOC Brine 40 365
2009 DAVID A WALDRON & ASSOC Brine 0 365
2010 DAVID A WALDRON & ASSOC Brine 0 365
2011 DAVID A WALDRON & ASSOC Brine 55 365
2012 DAVID A WALDRON & ASSOC Brine 0 366
2013 DAVID A WALDRON & ASSOC Brine 43 365
2014 DAVID A WALDRON & ASSOC Brine 54 365
2015 DAVID A WALDRON & ASSOC Brine 0 365
2016 PIN OAK ENERGY PARTNERS LLC Brine 0 365
2017 PIN OAK ENERGY PARTNERS LLC Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1349670260 2017-11-9 0:00: PB No Violations 4.30
-1414770885 2015-10-8 0:00: UP No Violations 0.70
-320390884 2017-11-29 0:00 FR No Violations 0.50
-959857726 2019-9-19 0:00: FR No Violations 1.20
0320390884 2017-11-29 Final Restoration No Violations I was on location to check the progress of Final Restoration at this recently plugged and abandoned well location. The well was plugged on 11/10/17 and Final Restoration is due by mid February (3 months). The wellsite is graded, the flow line has been pulled, and all surface equipment has been removed. A yellow, wooden post has been placed at the location of the former wellhead as this area is going to be developed for commercial use. FR approval is pending the receipt of the Landowner Waiver (Form 5). No violations.
1349670260 2017-11-09 Plug / Plug Back No Violations I was on location to witness plugging operations at this Clinton Sandstone well. Plugs were set across the top of the Big Lime and across the Berea Sandstone/ Ohio Shale interval. The casing was recovered and the remainder of open surface casing will be bailed dry and grouted to surface tomorrow (11/10/17). No violations. See plugging report for more details on this job.
1414770885 2015-10-08 UrbanProduction Wells No Violations I was on location for a status check. During my inspection, I found the well in production. The well is equipped with an electric powered pumpjack. The tank battery consists of a 100 barrel production tank, a buried, concrete, brine tank, and a mechanical separator. There is a dike around the tank battery and well. An identification sign is posted. Locked, chain link fences surround the tank battery and pumpjack. The lease road is in stable condition. The well was placed into production prior to House Bill 278.
1509986630 2017-11-06 Plug / Plug Back No Violations I was on location to inspect this Clinton Sandstone well prior to plugging and abandonement operations. The wellhead consists of 4.5 production casing, 2.375 tubing and rods, and a stuffing box. The pumping unit has been removed and the flow lines are disconnected. Bishop Well Service is scheduled to be on location this afternoon. The tank battery, tanks, and surface equipment have been removed. I will check back later to see if the service rig has moved in. No violations.
1510162071 2017-11-08 Plug / Plug Back No Violations I was on location to witness plugging operations at this Clinton Sandstone well. Bishop Well Service was the plugging contractor and Petroset cementing was the cementing contractor. A 7.3 barrel (30 sack) plug was set across the Clinton Sandstone with 2.375 tubing. The tubing was pulled and the 4.5 production casing was ripped at a depth of 2586. The wellhead was packed off and shut-in, and operations will continue tomorrow morning (11/9/17). No violations. See plugging report for more details on this job.
2011251853 2017-11-07 Plug / Plug Back No Violations Status check of plugging operations. Bishop Well Service has pulled the rods are beginning to lay down the 2.375 tubing to tally and inspect. I met with Doug Gonzales and discussed the plugging operations. It was decided to bring in another tubing string to set the bottom plug due to the oil and paraffin build up inside the string. The plan is to begin plugging tomorrow around 10:00am. No violations.

For data sources see[9]

References