Well Details

Well ID: 34-133-22981
Loading map...
Country: United States
State: Ohio
County: Portage
Municipality: Franklin Township
Operator Name: SUMMIT PETROLEUM INC
Well Pad ID:
Farm/Lease Name: FRANKLIN INVESTMENTS
License Status: Plugged and Abandoned
License Date: 2016-01-14
Spud Date: 1984-09-19
Spud Drilling Contractor: EDCO DRLG
Final Drill Date: 1984-09-25
Well Total Depth: 4250.00 ft
Configuration: Vertical
Latitude: 41.160000
Longitude: -81.330000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1982-11-30 625 PIONEER RESOURCES INC GeoDate 11/30/82
Oil and Gas 1982-11-30 Issued Date 11/30/82 Expired Date 5/29/83 Acres 0040000 Tool Type CRF Proposed Formation CLINTON Proposed Depth 00000 Proposed Drill Depth 00000
CO 1984-09-18 625 PIONEER RESOURCES INC GeoDate 9/18/84
Oil and Gas 1984-09-18 Issued Date 9/18/84 Expired Date 3/17/85 Acres 0040000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 04250 Proposed Drill Depth 04250
Original Spud 1984-09-19
Completed 1984-09-25
Reached Total Depth 1984-09-25
Completion Report Received 1984-10-18
CO 1993-04-30 4362 BUTLER KATHY GeoDate 9/18/84
Change of Owner 2003-06-19 Operator changed from 4362, BUTLER KATHY to 2026, SUMMIT PETROLEUM INC
APP 2016-01-14 Proposed Formations:CLINTON, Issued Date:1/14/2016, Expired Date:1/13/2018 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:HAD, Proposed Well Class:
Plugged/Abandoned 2016-02-10
Construction Permit Expires 2017-01-13
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 3899 4069 0
3899 4069 0
2006-09-11 4070 4120 215
4070 4120 215
3899 4069 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
FOAM 0 1000 Gal 0
H2O 0 1300 Bbl 0 FRAC: H2O,SAND,N2
N2 0 60 Mscf 0

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1985 PIONEER RESOURCES INC 19261.00 4183.00 279
1986 PIONEER RESOURCES INC 15699.00 376.00 365
1987 PIONEER RESOURCES INC 14711.00 380.00 365
1988 PIONEER RESOURCES INC 14843.00 310.00 350
1989 PIONEER RESOURCES INC 7372.00 341.00 365
1990 PIONEER RESOURCES INC 10405.00 191.00 365
1991 PIONEER RESOURCES INC 74.00 180.00 365
1992 PIONEER RESOURCES INC 8897.00 184.00 365
1993 PIONEER RESOURCES INC 7342.00 147.00 365
1994 BUTLER KATHY 6929.00 88.00 365
2002 SUMMIT PETROLEUM INC 9766.00 265.00 365
2003 SUMMIT PETROLEUM INC 5558.00 117.00 365
2004 SUMMIT PETROLEUM INC 3712.00 119.00 365
2005 SUMMIT PETROLEUM INC 3672.00 70.00 365
2006 SUMMIT PETROLEUM INC 2624.00 0.00 365
2007 SUMMIT PETROLEUM INC 2076.00 68.00 365
2008 SUMMIT PETROLEUM INC 3505.00 51.00 365
2009 SUMMIT PETROLEUM INC 3422.00 115.00 365
2010 SUMMIT PETROLEUM INC 3238.00 62.00 365
2011 SUMMIT PETROLEUM INC 2628.00 71.00 365
2012 SUMMIT PETROLEUM INC 2071.00 70.00 366
2013 SUMMIT PETROLEUM INC 1975.00 71.00 365
2014 SUMMIT PETROLEUM INC 2196.00 76.00 365
2015 SUMMIT PETROLEUM INC 1710.00 0.00 365
2016 SUMMIT PETROLEUM INC 511.00 65.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1985 PIONEER RESOURCES INC Brine 205 279
1986 PIONEER RESOURCES INC Brine 106 365
1987 PIONEER RESOURCES INC Brine 352 365
1988 PIONEER RESOURCES INC Brine 142 350
1989 PIONEER RESOURCES INC Brine 85 365
1990 PIONEER RESOURCES INC Brine 140 365
1991 PIONEER RESOURCES INC Brine 76 365
1992 PIONEER RESOURCES INC Brine 155 365
1993 PIONEER RESOURCES INC Brine 112 365
1994 BUTLER KATHY Brine 3 365
2002 SUMMIT PETROLEUM INC Brine 186 365
2003 SUMMIT PETROLEUM INC Brine 69 365
2004 SUMMIT PETROLEUM INC Brine 64 365
2005 SUMMIT PETROLEUM INC Brine 45 365
2006 SUMMIT PETROLEUM INC Brine 40 365
2007 SUMMIT PETROLEUM INC Brine 0 365
2008 SUMMIT PETROLEUM INC Brine 51 365
2009 SUMMIT PETROLEUM INC Brine 66 365
2010 SUMMIT PETROLEUM INC Brine 56 365
2011 SUMMIT PETROLEUM INC Brine 57 365
2012 SUMMIT PETROLEUM INC Brine 63 366
2013 SUMMIT PETROLEUM INC Brine 58 365
2014 SUMMIT PETROLEUM INC Brine 0 365
2015 SUMMIT PETROLEUM INC Brine 72 365
2016 SUMMIT PETROLEUM INC Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-629081798 2008-6-9 0:00:0 PW No Violations
-78458173 2006-5-15 0:00: PW No Violations
0078458173 2006-05-15 Production Wells No Violations Summit Petroleum is moving the tank battery to the east to permit new residential development. A new fence will be placed around the tank battery and the well head and the required ID will be posted.
0629081798 2008-06-09 Production Wells No Violations The company needs to fence the wellhead and the tank battery.
1143608724 2015-08-20 UrbanProduction Wells No Violations I conducted a status check inspection of this Clinton Sandstone well. My inspection found the wellhead was fenced and locked. A 4.5 flanged wellhead was equipped with a 4 plunger lift system and 2 flow line. The well produced to a diked and fenced tank battery to the southeast containing two (2) 100 barrel tanks, a vertical separator, and a horizontal separator with a meter run. The proper ID was posted at the tank battery and the man door was locked. I found no violations at this time.
1153403914 2006-07-19 Production Wells Violations Noted On May 15, 2006, I met with the developer who informed me that Summit would be moving the tank battery to accommodate new development. We discussed the move and the proposed location. I told them at the time that fencing around the tank battery and the wellhead is required. On July 19, I found that the tank battery had not been moved and the fence was still down at the tank battery and had never been placed around the wellhead. Please install the required fencing and post the required identification.
1164665513 2006-11-14 Production Wells Violations Noted A temporary fence has been placed around the wellhead but the fence is still down around the tank battery. According to a excavating crew working in the area, they are building a new tank battery site and should be ready to move tanks and the separator in the near future. Until then, the violation is still open.
1252686207 2009-09-10 Production Wells No Violations The fences have been installed around the wellhead and the tank battery as requested. The violation has been corrected.
1462817980 2016-03-04 Final Restoration No Violations I was on site to check the restoration status of this location following plugging operations on 2/10/2016. Keith Moore was on location with his crew and removing the fencing from around the tank battery. He said he will be removing the tanks and surface equipment over the next two (2) weeks and as time allows. The wellhead area has been graded and the fence panels need to be removed and the area mulched and seeded. Final restoration is due by 5/10/2016. No violations.
1578202374 2016-04-05 Final Restoration No Violations I was on location to check the Final Restoration status of this Clinton Sandstone well that was plugged and abandoned on 2/10/2016. My inspection found that the surface production equipment has been removed from the tank battery. The battery still needs to be graded and seeded. There is a sales line riser on the south side of the tank battery (GPS NAD83: 41.16761, -81.33788) and the line is still active. The area of the wellhead needs to be graded and seeded and the fence panels need to be removed. Final Restoration is due by 5/10/2016 and a landowner waiver will be required to leave the flow line buried. No violations.
1708610487 2017-07-25 Final Restoration No Violations This well was plugged and abandoned on 2/10/2016 and Final Restoration was due by May 2016. My inspection today found that the area is being developed as part of the River Bend subdivision. The lease road has been graded and seeded by the developer as well as the area around the former wellhead. The area of the tank battery has also been graded and seeded and grass is well established on the location. A sales line still exists on the east side of the former tank battery where the Robert A Durst-Trustee #3 (PN#22982) ties into the main sales line. I will speak with Bill Kinney about submitting a landowner waiver (Form 5). No violations.

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
1153403914 US-OH-103989 2006-07-20 General Safety
1153403914 US-OH-103990 2006-07-20 Failure to legibly identify well
1164665513 US-OH-104375 2006-07-20 General Safety
1164665513 US-OH-104376 2006-07-20 Failure to legibly identify well