X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-133-23542

Well Details

Well ID: 34-133-23542
Loading map...
Country: United States
State: Ohio
County: Portage
Municipality: Edinburg Township
Operator Name: PEP DRILLING LLC
Well Pad ID:
Farm/Lease Name: H. MYERS (SWIW #35)
License Status: Active Injection
License Date: 2010-03-10
Spud Date: 1986-11-17
Spud Drilling Contractor: CUBBY DRLG
Final Drill Date: 1986-11-24
Well Total Depth: 4875.00 ft
Configuration: Vertical
Latitude: 41.080000
Longitude: -81.140000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1986-10-24 2050 ORION PETRO CORP GeoDate 10/24/86
Oil and Gas 1986-10-24 Issued Date 10/24/86 Expired Date 10/24/87 Acres 0000000 Tool Type RTAF Proposed Formation Proposed Depth 04875 Proposed Drill Depth 04875
Original Spud 1986-11-18 PLUGGED BACK FROM CLINTON TO NEWBURG FOR DISPOSAL WELL
Completed 1986-11-24 PLUGGED BACK FROM CLINTON TO NEWBURG FOR DISPOSAL WELL
Reached Total Depth 1986-11-24 PLUGGED BACK FROM CLINTON TO NEWBURG FOR DISPOSAL WELL
Completion Report Received 1986-12-15 PLUGGED BACK FROM CLINTON TO NEWBURG FOR DISPOSAL WELL
Change of Owner 2010-02-10 Operator changed from 2050, ORION PETRO CORP to 1198, PIPES PURSIE E
Annulus Pressure Monitoring Approved 2010-03-10 PLUGGED BACK FROM CLINTON TO NEWBURG FOR DISPOSAL WELL
APP 2010-03-10 Proposed Formations:NEWBURG LOCKPORT, Issued Date:3/10/2010, Expired Date:3/10/2011 6:00:00 AM, Drilling unit acres:42.48, Proposed Well Type:SWD, Proposed Well Class:SWIW
Last Compliance Report 2010-03-10 PLUGGED BACK FROM CLINTON TO NEWBURG FOR DISPOSAL WELL
Plugged Back 2010-04-23 PLUGGED BACK FROM CLINTON TO NEWBURG FOR DISPOSAL WELL
Construction Permit Expires 2011-03-10 PLUGGED BACK FROM CLINTON TO NEWBURG FOR DISPOSAL WELL
Change of Owner 2016-05-20 Operator changed from 1198, PIPES PURSIE E to 9640, PEP DRILLING LLC
Record Last Modified 2017-02-15 PLUGGED BACK FROM CLINTON TO NEWBURG FOR DISPOSAL WELL

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 4665 4674 6
2010-05-17 4136 4220 0
4665 4674 6
4136 4220 0
4136 4220 0
2006-09-11 4740 4745 0
2006-09-11 4682 4688 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 66000 Gal 20000 FRAC: H2O,SAND

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1987 ORION PETRO CORP 2107.00 1164.00 365
1988 ORION PETRO CORP 2257.00 1235.00 365
1989 ORION PETRO CORP 1795.00 874.00 365
1990 ORION PETRO CORP 1885.00 651.00 365
1991 ORION PETRO CORP 1474.00 560.00 365
1992 ORION PETRO CORP 1323.00 533.00 365
1993 ORION PETRO CORP 1004.00 354.00 365
1994 ORION PETRO CORP 1035.00 401.00 365
1995 ORION PETRO CORP 991.00 381.00 0
1996 ORION PETRO CORP 864.00 295.00 0
1997 ORION PETRO CORP 1107.00 291.00 0
1998 ORION PETRO CORP 734.00 299.00 365
1999 ORION PETRO CORP 815.00 273.00 365
2000 ORION PETRO CORP 511.00 317.00 365
2001 ORION PETRO CORP 350.00 231.00 365
2002 ORION PETRO CORP 1348.00 232.00 365
2003 ORION PETRO CORP 628.00 285.00 365
2004 ORION PETRO CORP 394.00 208.00 365
2005 ORION PETRO CORP 290.00 218.00 365
2006 ORION PETRO CORP 886.00 222.00 365
2007 ORION PETRO CORP 371.00 137.00 365
2008 ORION PETRO CORP 69.00 196.00 365
2009 ORION PETRO CORP 7.00 168.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1987 ORION PETRO CORP Brine 930 365
1988 ORION PETRO CORP Brine 662 365
1989 ORION PETRO CORP Brine 190 365
1990 ORION PETRO CORP Brine 140 365
1991 ORION PETRO CORP Brine 30 365
1992 ORION PETRO CORP Brine 100 365
1993 ORION PETRO CORP Brine 70 365
1994 ORION PETRO CORP Brine 95 365
1995 ORION PETRO CORP Brine 65 0
1996 ORION PETRO CORP Brine 35 0
1997 ORION PETRO CORP Brine 100
1998 ORION PETRO CORP Brine 70 365
1999 ORION PETRO CORP Brine 70 365
2000 ORION PETRO CORP Brine 95 365
2001 ORION PETRO CORP Brine 115 365
2002 ORION PETRO CORP Brine 60 365
2003 ORION PETRO CORP Brine 95 365
2004 ORION PETRO CORP Brine 35 365
2005 ORION PETRO CORP Brine 71 365
2006 ORION PETRO CORP Brine 70 365
2007 ORION PETRO CORP Brine 35 365
2008 ORION PETRO CORP Brine 75 365
2009 ORION PETRO CORP Brine 35 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1117790914 2010-4-2 0:00:0 PB No Violations
-1222138984 2017-6-14 0:00: SW No Violations
-1251658922 2017-10-31 0:00 SW No Violations 0.60
-1300819928 2019-9-26 0:00: SW No Violations
-1332485709 2014-9-5 0:00:0 SW No Violations
-1347458698 2014-3-31 0:00: SW No Violations
-1349971070 2011-3-21 0:00: SW No Violations
-1417032430 2020-7-16 0:00: SW No Violations 0.70
-1498768370 2020-5-6 0:00:0 SW No Violations
-1580062675 2010-7-9 0:00:0 SW No Violations
-1646659943 2010-12-15 0:00 SW No Violations
-166432834 2016-6-21 0:00: SW No Violations 0.50
-1696587985 2020-1-9 0:00:0 SW No Violations 0.60
-1815091161 2018-5-24 0:00: SW No Violations 0.70
-1825561561 2010-8-17 0:00: SW No Violations
-1880603576 2011-11-1 0:00: SW No Violations
-1897198027 2016-8-5 0:00:0 SW No Violations
-1936365293 2019-12-2 0:00: SW No Violations 0.40
-2133056767 2010-2-18 0:00: SW No Violations
-230308464 2010-6-2 0:00:0 SW No Violations
-256590381 2012-12-18 0:00 SW No Violations
-259586894 2016-3-31 0:00: SW No Violations
-375527645 2017-1-23 0:00: SW No Violations
-448776645 2015-9-29 0:00: SW No Violations
-482431782 2016-9-28 0:00: SW No Violations
-486411968 2014-5-29 0:00: SW No Violations
-582907626 2010-4-6 0:00:0 PB No Violations
-617746748 2015-4-30 0:00: SW No Violations
-78420038 2010-5-5 0:00:0 SW No Violations
-845922479 2012-2-28 0:00: SW No Violations
-852699672 2017-3-20 0:00: SW No Violations
-904553326 2010-4-2 0:00:0 SW No Violations
0000PL5891 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
0078420038 2010-05-05 Salt Water Injection Well No Violations Met on site with Mark Smith and Wade Pol to discuss construction plans for this new facility. I advised them to follow the plan as submitted to Columbus and that any changes would require a written modification. Construction will begin as soon as the weather permits.
0166432834 2016-06-21 Salt Water Injection Well No Violations I inspected this salt water disposal well to see if the requested gauges had been installed at the wellhead. My inspection today found that no gauges have been installed. I inspected the pump house and surface facility to the south. The facility was currently open and PEP Drilling (#25303), Duck Creek Energy (#25331), and J Hawk (#25342) were delivering loads of salt water to the facility for injection. All trucks were marked and identified as required. I inspected the pump, which was currently running, and a gauge on the injection line registered an injection pressure of 680psi. I spoke with the facility operator and he will install the required gauges or repair the chart box at the wellhead. I will notify UIC Inspector Ochs of my findings.
0178863005 2015-07-10 Salt Water Injection Well No Violations The well and surface facility were inspected. There were no violations found at the time of inspection.
0208556803 2010-06-22 Salt Water Injection Well No Violations The concrete loading pad has been poured and the storage tanks are ready to plumb together. Work is also continuing inside of the building.
0230308464 2010-06-02 Salt Water Injection Well No Violations Pol has completed the installation of the 30 mil liner and the sand covering. The next step will cover the sand with 4 inches of crushed limestone (57s). The injection line has been installed but still needs the mechanical integrity test completed before use. Work is continuing on the building.
0256590381 2012-12-18 Salt Water Injection Well No Violations My inspection of the injection facility and well found no violations. The pump was operating, while the pressures were gauged.
0259586894 2016-03-31 Salt Water Injection Well No Violations The injection well and surface facility were inspected. There were no violations found at the time.
0375527645 2017-01-23 Salt Water Injection Well No Violations An inspection of the injection well and surface facility found no violations.
0448776645 2015-09-29 Salt Water Injection Well No Violations The injection well and surface facility were inspected. There were no violations found at the time.
0482431782 2016-09-28 Salt Water Injection Well No Violations The injection well and surface facility were inspected. There were no violations found at the time.
0486411968 2014-05-29 Salt Water Injection Well No Violations An inspection of the well and injection facility found no violations.
0582907626 2010-04-06 Plug / Plug Back No Violations Bob Worstall and myself witnessed the cement squeeze job. The details are in Inspector Worstalls RBDMS. There were no violations at this time.
0617746748 2015-04-30 Salt Water Injection Well Violations Noted The well and surface facility were inspected. An inspection found a check valve dripping. A well tender was notified of the leak.
0722674767 2013-09-06 Salt Water Injection Well No Violations My inspection of the well and injection facility found no violations.
0771918467 2016-12-28 Salt Water Injection Well No Violations The injection well and surface facility were inspected. There were no violations at the time.
0845922479 2012-02-28 Salt Water Injection Well No Violations This quarterly inspection found no violations at this time.
0852699672 2017-03-20 Salt Water Injection Well No Violations An inspection of the injection well and surface facility found no violations.
0877346109 2015-03-31 Salt Water Injection Well No Violations The injection well and surface facility were inspected. There were no violations found at the time.
0904553326 2010-04-02 Salt Water Injection Well No Violations Appalachian Well Surveys set the cement retainer at 4440 on 4/1. Today, Petroset was on site to set the bottom plug by stinging into the retainer. However, as soon as the stinger entered the retainer, the injection pressure increased to between 1800 and 2000 psi. Repeated attempts failed to permit normal operations. The decision was made to pull the tubing and check the condition of the stinger. If the stinger is in good working order then the retainer will need to be removed.
0927928198 2015-12-30 Salt Water Injection Well No Violations An inspection of the injection well and surface facility found no violations.
1018688346 2019-6-5 0:00:0 SW No Violations 1.00
1117790914 2010-04-02 Plug / Plug Back No Violations Bob Worstall called and wanted me to help him with the plug back. He had another meeting. The workover rig, Chipco had run in the hole with 2 3/8 tubing with stinger. Petro-Set pumped 54 barrels of fresh water to brake circulation. The rig crew dropped the stinger into the cement retainer. The pressure while circulated hole was 700psi. The pressure rose to 2000psi as soon the stinger went into the cement retainer. The stinger was pulled out of retainer. This process was preformed several times with the same result. Something is wrong with the cement retainer or the stinger is to short. Bob Worstall came on the location. PEP decided to pull out of the hole and try to drill up the cement retainer.
1210915160 2018-03-21 Salt Water Injection Well No Violations

-331)

1214704925 2016-05-12 Salt Water Injection Well No Violations I conducted a quarterly status check inspection of this active injection well and the associated surface facilities with Inspector John Fleming. My inspection found the needle valves on the injection tubing and annular port between the 4.5 casing and tubing corroded and not fitted with gauges. I called Mark Smith (PEP) and asked him to place new needle valves and gauges on the wellhead so I could safely check injection and annular pressures. He told me he would be up on Tuesday (5/17/16) and install the valves and gauges. I will re-inspect the wellhead and facility after that time.
1222138984 2017-06-14 Salt Water Injection Well No Violations The injection well and surface facility were inspected. There were no violations found at the time.
1223795879 2020-4-6 0:00:0 SW No Violations 1.20
1246727437 2014-10-23 Salt Water Injection Well No Violations The injection well and surface facility were inspected. There were no violations found at the time.
1251658922 2017-10-31 Salt Water Injection Well No Violations I found the UIC facility in good repair on the day of my inspection. The identification sign at the well is lying on the ground and the one at the facility was behind a wall and not in a conspicuous place. I spoke with the facility operator to repost the identification signs at the well and facility. There is a locked chain link fence around the well and facility. There are no violations at this time.
1270124059 2010-03-31 Production Wells No Violations I witnessed the setting of the cement retainer. The workover rig is Chipco LLC Well Service from Zanesville Ohio. I met with Mark Smith of PEP on the location. The logging company was Appalachian Well Service. They set the Owens 3.7 cement retainer at 4440. That is Two hundred feet above the top Clinton perf. There was a collar at 4450. The 2 3/8 tubing had parafin inside. Mark stated they would clean the parafin out of the tubing before going forward with the cement job. The cement job will be on Friday, 4/2/10. There were no violations at this time.
1271076124 2010-04-09 Salt Water Injection Well No Violations I witnessed the pressure testing of the casing. The permit wanted 1190psi for 15 minutes. Petroset pumped the casing to 1190psi. Lost 33psi in 15 minutes. There was some leakage around the 4 1/2 swedge to the casing. It could loose 59.5psi in 15 minutes. The pressure test passes. Rigged up Appalachian Well Service. Appalachian Well Service ran a GR/CCL/ bond log from 4430 to 3480. The top of the cement was at 3940. Called Tom Tomastik at Columbus and left him a message on the top of the cement. Will wait till Monday for the results from Tom.
1271103556 2010-04-05 Plug / Plug Back No Violations CHIPCO was on site to knock out the cement retainer that was placed in the well last Thursday to set the Clinton plug. Multiple attempts to set the stinger last Friday failed and the decision was made to removed the retainer and try again.
1271186442 2010-04-06 Plug / Plug Back No Violations Appalachian Well Service was on site to set a second cement retainer at 4424 for the purpose of squeezing the Clinton plug through six perforations from 4665 through 4745. CHIPCO ran 2-3/8 tubing in with a stinger to activate the tool. The system worked as designed and Petroset pumped 150 sacks of Class A cement through the retainer and into the formation. Pressure slowly built from 0 psi to 1200 psi during the mix and displace phases and reached a maximum of 1500 psi at plug down. The stinger was removed from the retainer and circulated clean before pulling the tubing string.

The next step is to complete a pressure test on the 4-1/2 casing and on the bottom plug and to run the cement bond log, all on Friday 4/9. The Newburg injection zone still needs to be perforated and fraced before the well can be used.

1271194001 2019-7-18 0:00: SW No Violations 1.00
1272901050 2010-04-23 Salt Water Injection Well No Violations Successfully completed the required mechanical integrity test (MIT) on the tubing packer for this brine injection well. CHIPCO was on site to run a new Halliburton R-4 packer on a new string of 2-3/8 upset tubing. The well was perforated with 225 shots from 4136 to 4220. The packer was set in tension at 4120. Prior to setting the packer, Producers circulated the freshwater/inhibitor mixture down the annulus and up the tubing. The inhibitor mixture circulated to surface. Several attempts to complete the MIT failed, presumably due to air in the system. On the successful attempt the initial shut in pressure was 990 psi. After five minutes the pressure fell to 980 psi. After ten minutes the pressure fell to 975 psi. After 15 minutes, the pressure held at 975 psi. The packer and injection system PASSED the test.
1275661355 2010-06-01 Salt Water Injection Well No Violations W. Pol Contracting has completed the containment dike and base using clay under four inches of sand. They are starting to lay the 30 mil re-enforced liner which will be covered by another 4 inches of sand. The liner extends completely over the containment dike. The sand is being applied by a sling truck. The clay and sand were obtained from Charleston Sand and Gravel.
1277155521 2010-06-03 Salt Water Injection Well No Violations Pol is using a rock thrower to spread 57 limestone throughout the containment area. The tank stands with bankrun will be set next.
1277690750 2010-06-07 Salt Water Injection Well No Violations The eight 210 bbl tank have been set in their pads and the sump is pumping rain water from the containment area.
1277696717 2010-06-10 Salt Water Injection Well No Violations Witness setting the septic tank for the loading pad slit drain.
1312480114 2011-08-03 Salt Water Injection Well No Violations I performed the quarterly UIC test on the annulus and the injection. The well was not running. There were no violations at this time.
1332485709 2014-09-05 Salt Water Injection Well No Violations An inspection of the well and injection facility found no violations.
1347458698 2014-03-31 Salt Water Injection Well No Violations The were no violations at the time of inspection.
1349289544 2012-08-03 Salt Water Injection Well No Violations My inspection of the well and injection facility found no violations.
1349971070 2011-03-21 Salt Water Injection Well No Violations Quarterly status check inspection found no violations at this time.
1438781707 2013-11-20 Salt Water Injection Well No Violations There were no violations at the time of inspection.
1500568711 2017-07-12 Salt Water Injection Well No Violations I performed an inspection of the injection well and surface facility found no violations.
1508492078 2020-3-5 0:00:0 SW No Violations
1513778540 2017-12-20 Salt Water Injection Well No Violations I found the injection and facility in good repair on the day of my inspection. I observed no leaks or spills. An identification sign is posted at the facility. The facility and well are secure with a locked chain link fence. There are no violations at this time.
1539263739 2018-10-11 Salt Water Injection Well No Violations I found the injection well operating during my inspection. There was a facility operator on location. There is a fence around the well. I observed no spills or leaks. There is an identification sign posted at the well and facility.
1541689559 2010-06-04 Salt Water Injection Well No Violations Pol is setting and leveling the tank stand rings. Once set, each ring will be filled with bank run gravel for a tank bed. Next week, the tanks will be set with a crane, the slit drain septic will be set and the concrete pad will be poured.
1552589139 2019-3-14 0:00: SW No Violations 1.00
1556296086 2019-4-26 0:00: SW No Violations 1.30
1580062675 2010-07-09 Salt Water Injection Well No Violations Completed the mechanical integrity test on the 3 injection line. The line was pressurized to 1060 psi with fresh water. After 15 minutes the pressure remained at 1060 psi. The injection line passed the test.
1585984189 2018-11-20 Salt Water Injection Well No Violations I found the injection well not in operation on the day of my inspection. The fencing around the injection well was locked. The facility is in good repair. There was no facility operator on location. There are identification signs posted. I observed no spills or leaks.
1594897778 2020-7-14 0:00: SW No Violations 0.80
1594994126 2020-7-17 0:00: SW No Violations 1.50
1619546593 2018-07-12 Salt Water Injection Well No Violations I found the injection well operating on the day of my inspection. Identification signs are posted. There is a chain link fence surrounding the well and facility. There was no facility operator on location. I observed no spills or leaks.
1642352712 2015-06-05 Salt Water Injection Well No Violations The well and surface facility were inspected. The check valve was no longer dripping. There were no additional problems found. The well was in compliance.
1646659943 2010-12-15 Salt Water Injection Well No Violations Quarterly status check inspection found no violations at this time. The lease road to the wellhead was drifted over preventing access for pressure reading at the wellhead. Pressure inside the pump house indicated that the well was on vacuum.
1684615316 2010-08-03 Salt Water Injection Well No Violations Work on this injection well conversion and facility installation is nearly complete. The remaining work includes installing the security fence and gate at the injection facility. Regular quarterly inspections will begin this month with the 3rd quarter.
1757928903 2012-07-09 Salt Water Injection Well No Violations My inspection of the well site found no violations at the time.
178863005 2015-7-10 0:00: SW No Violations
1798279381 2010-05-27 Salt Water Injection Well No Violations W. Pol Contracting is building the containment area with clay. The cinder block building is being redone for use as the pumphouse.
1815091161 2018-05-24 Salt Water Injection Well No Violations I found the well in operation on the day of my inspection. I observed no leaks or spills. Identification signs are posted at the well and tank battery. There are no violations at this time.
1825561561 2010-08-17 Salt Water Injection Well No Violations This is the first quarterly status check inspection for this well. There were no violations at this time.
1880603576 2011-11-01 Salt Water Injection Well No Violations I performed the quarterly UIC test on the annulus and the injection. The well was not running. There were no violations at this time.
1897198027 2016-08-05 Salt Water Injection Well No Violations The injection well and surface facility were inspected. There were no violations found at the time.
1936070464 2018-03-26 Salt Water Injection Well No Violations I was on location to inspect the injection well and facility. I found a new pressure gauge installed on the tubing per my request. The well was operating on the day of my inspection. The chain link fencing around the wellhead is locked. The facility is in good repair. I observed no leaks or spills. There are no violations at this time.
1999773106 2011-05-17 Salt Water Injection Well No Violations Quarterly status check inspection found no violations at this time.
2005562664 2018-08-15 Salt Water Injection Well No Violations I found the injection well operating on the day of my inspection. There are locked chain link fences around the injection well and facility. I observed no leaks or spills. Identification signs are posted. There was no facility on location.
208556803 2010-6-22 0:00: SW No Violations
2133056767 2010-02-18 Salt Water Injection Well No Violations PEP has submitted an application to convert this well from a Clinton production well to a Newburg disposal well. This field review was limited by significant (12+) snow cover. The disposal facility is proposed to be south of the wellhead near the treeline. Access to the facility will require a new entrance and culvert. The existing wellhead entrance and driveway will remain. The existing tank battery and driveway will be abandoned. The well and access will be north of a drainage swale while the facility and access will be south of the drainage swale. There are several single family homes within 500 of the well and the proposed facility.
43640742 2019-1-16 0:00: SW No Violations 1.00
722674767 2013-9-6 0:00:0 SW No Violations
771918467 2016-12-28 0:00 SW No Violations
877346109 2015-3-31 0:00: SW No Violations
927928198 2015-12-30 0:00 SW No Violations
PL5891 PL No Violations

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
0617746748 US-OH-126974 2015-10-15 Pollution/Contamination

For data sources see[9]

References