X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-133-23812

Well Details

Well ID: 34-133-23812
Loading map...
Country: United States
State: Ohio
County: Portage
Municipality: Deerfield Township
Operator Name: EVERFLOW EASTERN PARTNERS LP
Well Pad ID:
Farm/Lease Name: BERLIN RESERVIOR UNIT
License Status: Producing
License Date: 1990-10-29
Spud Date: 1990-10-29
Spud Drilling Contractor: CUBBY DRLG
Final Drill Date: 1990-11-04
Well Total Depth: 5090.00 ft
Configuration: Vertical
Latitude: 40.990000
Longitude: -81.020000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Original Spud 1990-10-20
CO 1990-10-29 84 EVERFLOW EASTERN PTNS L P GeoDate 10/29/90
Oil and Gas 1990-10-29 Issued Date 10/29/90 Expired Date 10/29/91 Acres 0040500 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 05090 Proposed Drill Depth 05090
Completed 1990-11-04
Reached Total Depth 1990-11-04
Completion Report Received 1991-01-28
Construction Permit Expires 1991-10-29
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 4860 4990 0
4860 4990 0
2006-09-11 4876 4934 44
4876 4934 44
4860 4990 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 111320 Gal 75000 FRAC:WATER/SAND

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1991 EVERFLOW EASTERN PARTNERS LP 32098.00 823.00 264
1992 EVERFLOW EASTERN PARTNERS LP 23030.00 572.00 365
1993 EVERFLOW EASTERN PARTNERS LP 14856.00 460.00 365
1994 EVERFLOW EASTERN PARTNERS LP 15654.00 365.00 365
1995 EVERFLOW EASTERN PARTNERS LP 11509.00 202.00 365
1996 EVERFLOW EASTERN PARTNERS LP 9963.00 264.00 365
1997 EVERFLOW EASTERN PARTNERS LP 10374.00 197.00 365
1998 EVERFLOW EASTERN PARTNERS LP 8541.00 226.00 365
1999 EVERFLOW EASTERN PARTNERS LP 7758.00 256.00 365
2000 EVERFLOW EASTERN PARTNERS LP 8391.00 124.00 365
2001 EVERFLOW EASTERN PARTNERS LP 5155.00 130.00 365
2002 EVERFLOW EASTERN PARTNERS LP 4604.00 120.00 365
2003 EVERFLOW EASTERN PARTNERS LP 8334.00 256.00 365
2004 EVERFLOW EASTERN PARTNERS LP 7212.00 122.00 365
2005 EVERFLOW EASTERN PARTNERS LP 7030.00 253.00 365
2006 EVERFLOW EASTERN PARTNERS LP 6666.00 118.00 365
2007 EVERFLOW EASTERN PARTNERS LP 6439.00 119.00 365
2008 EVERFLOW EASTERN PARTNERS LP 6110.00 0.00 365
2009 EVERFLOW EASTERN PARTNERS LP 3137.00 127.00 365
2010 EVERFLOW EASTERN PARTNERS LP 5389.00 105.00 365
2011 EVERFLOW EASTERN PARTNERS LP 4742.00 116.00 365
2012 EVERFLOW EASTERN PARTNERS LP 2955.00 0.00 366
2013 EVERFLOW EASTERN PARTNERS LP 3995.00 117.00 365
2014 EVERFLOW EASTERN PARTNERS LP 4381.00 0.00 365
2015 EVERFLOW EASTERN PARTNERS LP 4883.00 124.00 365
2016 EVERFLOW EASTERN PARTNERS LP 5666.00 0.00 365
2017 EVERFLOW EASTERN PARTNERS LP 3550.00 137.00 365
2018 EVERFLOW EASTERN PARTNERS LP 3141.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1991 EVERFLOW EASTERN PARTNERS LP Brine 419 264
1992 EVERFLOW EASTERN PARTNERS LP Brine 40 365
1993 EVERFLOW EASTERN PARTNERS LP Brine 0 365
1994 EVERFLOW EASTERN PARTNERS LP Brine 0 365
1995 EVERFLOW EASTERN PARTNERS LP Brine 0 365
1996 EVERFLOW EASTERN PARTNERS LP Brine 40 365
1997 EVERFLOW EASTERN PARTNERS LP Brine 0 365
1998 EVERFLOW EASTERN PARTNERS LP Brine 0 365
1999 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2000 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2001 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2002 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2003 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2004 EVERFLOW EASTERN PARTNERS LP Brine 40 365
2005 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2006 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2007 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2008 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2009 EVERFLOW EASTERN PARTNERS LP Brine 50 365
2010 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2011 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2012 EVERFLOW EASTERN PARTNERS LP Brine 115 366
2013 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2014 EVERFLOW EASTERN PARTNERS LP Brine 30 365
2015 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2016 EVERFLOW EASTERN PARTNERS LP Brine 16 365
2017 EVERFLOW EASTERN PARTNERS LP Brine 8 365
2018 EVERFLOW EASTERN PARTNERS LP Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0000PL5758 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
0651785144 2005-03-03 Production Wells No Violations Status check inspection - no violations at this time.
1266902419 2017-12-14 Production Wells No Violations Status check inspection of this Clinton Sandstone well. My inspection found the wellhead equipped with 2.375 tubing and operating with the aid of a plunger lift system. A gauge on the tubing flow line indicates a pressure of 40psi and the required ID is posted at the wellhead. The well produces to a diked tank battery on location and contains one (1) 210 barrel tank and a horizontal separator. A gauge inside the separator indicates a pressure of 170psi and identification is posted on the tank ladder. No violations.
651785144 2005-3-3 0:00:0 PW No Violations
PL5758 PL No Violations

For data sources see[9]

References