If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-133-24302 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.25,"lon":-81.12,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Portage | |
Municipality: Freedom Township | |
Operator Name: CEDAR VALLEY ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: HURLEY UNIT | |
License Status: Producing | |
License Date: 2006-05-04 | |
Spud Date: 2006-06-12 | |
Spud Drilling Contractor: CAPSTAR DRILLING | |
Final Drill Date: 2006-06-19 | |
Well Total Depth: 4487.00 ft | |
Configuration: Vertical | |
Latitude: 41.250000 | |
Longitude: -81.120000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2005-07-21 | Proposed Formations:CLINTON, Issued Date:7/21/2005, Expired Date:7/21/2006 6:00:00 AM, Drilling unit acres:180.484, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2006-05-04 | Proposed Formations:CLINTON, Issued Date:5/4/2006, Expired Date:5/4/2007 6:00:00 AM, Drilling unit acres:180.484, Proposed Well Type:OG, Proposed Well Class:POOL |
Original Spud | 2006-06-12 | RBDMS Rec |
Completed | 2006-06-19 | RBDMS Rec |
Reached Total Depth | 2006-06-19 | RBDMS Rec |
Completion Report Received | 2006-10-19 | RBDMS Rec |
Construction Permit Expires | 2007-05-04 | RBDMS Rec |
Correction to Well | 2008-09-19 | UNIT SIZE DECREASED TO 179.654 ACRES. |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-12-22 | 4325 | 4383 | 54 |
4325 | 4383 | 54 | |
4325 | 4383 | 54 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 15 | 74150 Gal | 51000 | 75M SCF NITROGEN ASSIST |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2006 | CEDAR VALLEY ENERGY INC | 63.00 | 590.00 | 28 |
2007 | CEDAR VALLEY ENERGY INC | 2765.00 | 1584.00 | 365 |
2008 | CEDAR VALLEY ENERGY INC | 2495.00 | 1389.00 | 365 |
2009 | CEDAR VALLEY ENERGY INC | 1748.00 | 873.00 | 365 |
2010 | CEDAR VALLEY ENERGY INC | 1666.00 | 833.00 | 365 |
2011 | CEDAR VALLEY ENERGY INC | 1780.00 | 772.00 | 365 |
2012 | CEDAR VALLEY ENERGY INC | 1506.00 | 565.00 | 366 |
2013 | CEDAR VALLEY ENERGY INC | 1207.00 | 608.00 | 365 |
2014 | CEDAR VALLEY ENERGY INC | 1288.00 | 573.00 | 365 |
2015 | CEDAR VALLEY ENERGY INC | 1107.00 | 523.00 | 365 |
2016 | CEDAR VALLEY ENERGY INC | 1013.00 | 362.00 | 365 |
2017 | CEDAR VALLEY ENERGY INC | 992.00 | 389.00 | 365 |
2018 | CEDAR VALLEY ENERGY INC | 876.00 | 377.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2006 | CEDAR VALLEY ENERGY INC | Brine | 523 | 28 |
2007 | CEDAR VALLEY ENERGY INC | Brine | 1062 | 365 |
2008 | CEDAR VALLEY ENERGY INC | Brine | 1582 | 365 |
2009 | CEDAR VALLEY ENERGY INC | Brine | 904 | 365 |
2010 | CEDAR VALLEY ENERGY INC | Brine | 959 | 365 |
2011 | CEDAR VALLEY ENERGY INC | Brine | 986 | 365 |
2012 | CEDAR VALLEY ENERGY INC | Brine | 803 | 366 |
2013 | CEDAR VALLEY ENERGY INC | Brine | 957 | 365 |
2014 | CEDAR VALLEY ENERGY INC | Brine | 1131 | 365 |
2015 | CEDAR VALLEY ENERGY INC | Brine | 1089 | 365 |
2016 | CEDAR VALLEY ENERGY INC | Brine | 729 | 365 |
2017 | CEDAR VALLEY ENERGY INC | Brine | 1236 | 365 |
2018 | CEDAR VALLEY ENERGY INC | Brine | 733 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1755918292 | 2006-6-19 0:00: | DD | No Violations | |
-1940385541 | 2006-6-16 0:00: | DD | No Violations | |
-591915199 | 2007-1-9 0:00:0 | PL | No Violations | |
0591915199 | 2007-01-09 | Preliminary Restoration | No Violations | Preliminary restoration is approved. |
1755918292 | 2006-06-19 | Drill / Deepen / Reopen | No Violations | The pit liner tear has been repaired. Drilling should be completed tomorrow with a move on Wednesday. No violations at this time. |
1940385541 | 2006-06-16 | Drill / Deepen / Reopen | No Violations | I told the tool pusher that the liner on the blow pit has ripped and must be either replaced or patched. |
For data sources see[9]