If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-133-24438 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.27,"lon":-81.08,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Portage | |
Municipality: Windham Township | |
Operator Name: SUMMIT PETROLEUM INC | |
Well Pad ID: | |
Farm/Lease Name: CRAVER NEDALKA | |
License Status: Producing | |
License Date: 2012-07-13 | |
Spud Date: 2012-07-30 | |
Spud Drilling Contractor: POULSON DRILLING | |
Final Drill Date: 2012-08-06 | |
Well Total Depth: 4397.00 ft | |
Configuration: Vertical | |
Latitude: 41.270000 | |
Longitude: -81.080000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2012-07-13 | Proposed Formations:CLINTON, Issued Date:7/13/2012, Expired Date:7/13/2014 12:00:00 PM, Drilling unit acres:100.82, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2012-08-06 | |
Completion Report Received | 2012-11-05 | |
Construction Permit Expires | 2013-07-13 | |
Correction to Well | 2014-08-15 | UNIT SIZE INCREASED TO 120.52 ACRES. |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2012-12-07 | 4170 | 4189 | 34 |
4170 | 4189 | 34 | |
4170 | 4189 | 34 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2012-08-30 | H2O | 15 | 2048 Bbl | 40000 | Producers Service Corporation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | SUMMIT PETROLEUM INC | 438.00 | 466.00 | 77 |
2013 | SUMMIT PETROLEUM INC | 5593.00 | 3284.00 | 365 |
2014 | SUMMIT PETROLEUM INC | 1839.00 | 1080.00 | 160 |
2015 | SUMMIT PETROLEUM INC | 3878.00 | 2299.00 | 365 |
2016 | SUMMIT PETROLEUM INC | 3948.00 | 1874.00 | 365 |
2017 | SUMMIT PETROLEUM INC | 3315.00 | 1549.00 | 365 |
2018 | SUMMIT PETROLEUM INC | 3210.00 | 1387.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | SUMMIT PETROLEUM INC | Brine | 7428 | 77 |
2013 | SUMMIT PETROLEUM INC | Brine | 1290 | 365 |
2014 | SUMMIT PETROLEUM INC | Brine | 342 | 160 |
2015 | SUMMIT PETROLEUM INC | Brine | 904 | 365 |
2016 | SUMMIT PETROLEUM INC | Brine | 766 | 365 |
2017 | SUMMIT PETROLEUM INC | Brine | 667 | 365 |
2018 | SUMMIT PETROLEUM INC | Brine | 612 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1295800949 | 2012-9-12 0:00: | UD | No Violations | |
-134187930 | 2012-7-30 0:00: | UD | No Violations | |
-198535705 | 2013-5-16 0:00: | UP | No Violations | |
-1994847494 | 2012-8-15 0:00: | DD | No Violations | |
-861279113 | 2012-8-13 0:00: | UD | No Violations | |
0134187930 | 2012-07-30 | Urban Drill / Deepen / Reopen | No Violations | On location to witness the cementing of the 8.625 surface casing. An 11 hole was drilled to a total depth (TD) of 297 at the kelly bushing. Poulson drilling ran 272 of new, 20 lb/ft, surface casing. Petroset rigged up, broke circulation, and pumped 225 sacks of Class A cement. 15 barrels of cement returned to surface and held for 30 minutes. See cement ticket for further details. |
0198535705 | 2013-05-16 | UrbanProduction Wells | No Violations | I was on location to check if a gate had been installed on the lease road. Steel poles had been installed on each side of the road, but the gates had not been put in. I called Alan Lorinchack (Summit Petroleum) and asked to get the gates installed within a week. He said he would take care of it. I will check back next week. No violations. |
0283228674 | 2012-11-06 | UrbanPreliminary Restoration | No Violations | I was on location to check the preliminary restoration status of this well location. The site has been graded and seeded. The pumping unit is fenced and screened and the gate is locked. The tank battery is fenced and screened and contains 2-low profile, 140 barrel tanks and 1-100 barrel tank. There are 2-horizontal separators and the battery is sufficiently diked and the gate is locked. All drilling and completion equipment has been removed. The lease road is in good condition. Preliminary restoration is passed. No violations. |
0529588403 | 2012-07-30 | Urban Drill / Deepen / Reopen | No Violations | On location to check the drilling status. Poulson Drilling is currently at 190 at the kelly bushing of an 11 surface hole. The well was spudded at 7:00 A.M. |
0771337186 | 2012-08-06 | Urban Drill / Deepen / Reopen | No Violations | I was on location to witness the cementing of the 4.5 production casing string. Poulson Drilling ran 4365 of production casing. Petroset rigged up, established circulation, and cemented the casing with 200 sacks of Class A cement. See cement ticket for further details. |
0861279113 | 2012-08-13 | Urban Drill / Deepen / Reopen | No Violations | I was on location to witness solidification and closing of the pits. The cuttings have been properly solidified and can be enclosed and buried in the liner. No violations. |
1295800949 | 2012-09-12 | Urban Drill / Deepen / Reopen | No Violations | I performed this status check inspection to check the progress of the installation of the surface equipment following completion of the well the previous week. During my inspection, I found that the rods and tubing had been run in the hole and the pumping unit was spotted and rigged up over the wellhead. A flow back tank was still present on the location. The tank battery was under construction and the flow lines had been run from this well and the Craver-Nedalka #2. The well site still needs to be graded and the topsoil spread and seeded. The lease road is in good condition. No violations. |
1344003757 | 2012-08-03 | Urban Drill / Deepen / Reopen | No Violations | On location to check drilling progress. Poulson Drilling is at a depth of 3457 at the kelly bushing and is drilling on fluid. The pits are in good condition and have plenty of freeboard. The location and lease road are in good condition. No violations. |
1994847494 | 2012-08-15 | Drill / Deepen / Reopen | No Violations | I was on location to inspect the closed pits. The area has been graded and the well is waiting on completion. No violations. |
283228674 | 2012-11-6 0:00: | UL | No Violations | |
529588403 | 2012-7-30 0:00: | UD | No Violations | |
771337186 | 2012-8-6 0:00:0 | UD | No Violations | |
803511970 | 2019-7-2 0:00:0 | UP | No Violations | 0.40 |
For data sources see[9]