Well ID: 34-151-25885 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.97,"lon":-81.39,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Stark | |
Municipality: Lake Township | |
Operator Name: C & T ENERGY OF EAST CANTON IN | |
Well Pad ID: | |
Farm/Lease Name: HOLY SPIRIT CATHOLIC CHURCH UNIT | |
License Status: Producing | |
License Date: 2016-02-01 | |
Spud Date: 2016-02-24 | |
Spud Drilling Contractor: POULSON DRILLING | |
Final Drill Date: 2016-03-02 | |
Well Total Depth: 4550.00 ft | |
Configuration: Vertical | |
Latitude: 40.970000 | |
Longitude: -81.390000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2016-02-01 | Proposed Formations:CLINTON, Issued Date:2/1/2016, Expired Date:1/31/2018 12:00:00 PM, Drilling unit acres:40.7, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2016-03-02 | |
Completion Report Received | 2017-01-17 | |
Record Last Modified | 2017-02-10 | |
Construction Permit Expires | 2018-01-31 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2017-01-18 | 4336 | 4371 | 14 |
4336 | 4371 | 14 | |
4336 | 4371 | 14 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2016-10-10 | H2O | 8 | 99372 Gal | 65327 | Reliance Well Service | 14 SHOTS |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | C & T ENERGY OF EAST CANTON IN | 0.00 | 0.00 | 21 |
2017 | C & T ENERGY OF EAST CANTON IN | 8393.00 | 3282.00 | 365 |
2018 | C & T ENERGY OF EAST CANTON IN | 5135.00 | 1642.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | C & T ENERGY OF EAST CANTON IN | Brine | 2117 | 21 |
2017 | C & T ENERGY OF EAST CANTON IN | Brine | 745 | 365 |
2018 | C & T ENERGY OF EAST CANTON IN | Brine | 295 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-130275580 | 2016-2-24 0:00: | CS | No Violations | |
-1717691293 | 2016-10-31 0:00 | UP | No Violations | |
0130275580 | 2016-02-24 | Casing String Witnessed | No Violations | I was on site to witness the placement and cementing of the 16 conductor casing. Poulson Drilling drilled a 22 bore hole to 63 GL on a fresh water fluid system. Poulson Drilling ran two joints of 16, 54lb/ft, short thread coupling casing to 55 with one bow spring centralizer. Petroset Cementing Services (PCS) connected to the casing and established circulation, conditioned the bore hole with 200 lbs. of gel and 40 lbs. of cottonseed hulls. PCS mixed a cement slurry consisting of 230 sacks of Class A cement blended with 3% CaCl. Cement slurry verified by scale at 14.7 ppg. The cement slurry was displaced to 45 GL with 10 barrels of fresh water. I observed approximately 12 barrels of cement slurry returned to surface. No violations during this inspection. |
0884285445 | 2016-02-19 | Urban Drill / Deepen / Reopen | No Violations | I was on location to observe the site clearing and leveling of the Holy Spirit Catholic Church #1. Canton Oilwell Services were clearing the location of the trees and brush. Joe Little Excavating was putting in the filter socks and silt fencing. I sampled the creek water from which the cement mix water was to be pumped from and found it to have a pH of 4. The creek meandered through a peat bog and leached the excessive acidity from it. I spoke with Rob Frock ( East Canton Energy ) and informed him that this water was outside of parameters for mix water. Mr. Frock agreed and said would haul the water in. No violations identified during this inspection. |
0979956946 | 2016-02-25 | Casing String Witnessed | No Violations | I was location to witness the placement and cementing of the 11.75 surface casing. Poulson Drilling drilled a 14.75 bore hole from 64 to 428 while circulating a fresh water based drilling fluid. The Big Injun Sandstone was found from 250 to 350 GL. Poulson Drilling placed 10 joints of 11.75, 44 lb/ft, short thread coupling casing and two bow spring centralizers to a depth of 403 GL. Petroset Cementing Services (PCS) connected to the casing and established circulation. PCS mixed a cement slurry consisting of 300 sacks of Class A blended with 3% CaCl and 40 lbs of cottonseed hulls and circulated it back to surface. Cement slurry verified by scale at 15.0 ppg. The cement slurry was displaced to 383 GL with 47 barrels of fresh water. I observed approximately 21 barrels of cement slurry back to surface. No violations during this inspection. |
1456418799 | 2016-02-23 | Urban Drill / Deepen / Reopen | No Violations | I was on site to conduct an inspection of the pad installation prior to drilling activities. The pad installation was completed and ready for drilling activities to commence. The pits have been installed and lined and the cellar has been installed and lined as well. Poulson Drilling will be drilling the well and the rig has been set up over the cellar. Erosion and sediment controls are installed correctly and maintained. No violations were found during this inspection. |
1457105933 | 2016-03-01 | Urban Drill / Deepen / Reopen | No Violations | I was on site to conduct a status check on the well site. Well drilling operations ongoing. At the time of this inspection, well is being drilled on fluid and depth was 4437. The perimeter controls, lease access entrance, and pits were in compliance. No tracking of sediments onto adjacent roadways were observed. No violations during this inspection. |
1457454018 | 2016-02-22 | Urban Drill / Deepen / Reopen | No Violations | I was on the location to witness the construction of the drilling pits. The location was built on a glacial feature comprised of sandy soil. Joe Little Excavating was the contractor for the dirt work. The pits were dug with the sides having an angle of repose approaching 60 degrees in order to stabilize the sidewalls. The pits were double lined with pit liners. An excavation was made at the well stake down approximately five (5) feet deep and six (6) feet X six (6) feet square hole. A pit liner was positioned in the hole and a four (4) feet X five (5) feet plastic culvert was placed on end and on top of the liner. Ten (10) sacks of Sakrete cement was mixed and dumped around the culvert to seal the cellar pipe. The pit liner was long enough to reach the working pit. Thus allowing a liquid tight circulation path. I did not identify any violations during this inspection. |
1457621865 | 2016-03-08 | Urban Drill / Deepen / Reopen | No Violations | I was on site to conduct an inspection of the drilling pit closure. Joe Little Excavating was on site to conduct the closure work. At the time of this inspection, twenty-two tons of material was being offloaded into the pits for solidification. Approximately forty-four more tons will be added to the first pit to complete the solidification process and close the pit. All BMPs on site are being maintained and are working accordingly. No violations at this time. |
1461120074 | 2016-03-02 | Casing String Witnessed | No Violations | I was on site to witness the placement and cementing of the 4.5 production casing. Poulson Drilling drilled a 7 7/8 bore hole to 4542 GL on air to 3839 then switched over to a fluid system for remainder of the hole. Poulson Drilling ran one hundred and two joints of 4.5, 11.6lb/ft, casing to 4516 with seven bow spring centralizers. Petroset Cementing Services (PCS) connected to the casing and established circulation, conditioned the bore hole with 200 lbs. of gel and 40 lbs. of cottonseed hulls. PCS mixed a cement slurry consisting of 200 sacks of Class A cement blended with 2% calcium chloride. The cement slurry was displaced to 4506 GL with 72 barrels of fresh water. No violations during this inspection. |
1468815260 | 2016-03-09 | Urban Drill / Deepen / Reopen | No Violations | Joe Little Excavating was on location to solifify the drilling pits. The working pit was solidified with 46 tons of solidification material and then encapsulated. The blow pit is scheduled to be solidified on 3/11/2016 weather depending. No violations. |
1520464821 | 2016-02-25 | Urban Drill / Deepen / Reopen | No Violations | I was on site to conduct an inspection of the drilling activities involving the surface hole. Poulson Drilling reached a depth of 300 feet GL at the time of this inspection. The top of the Big Injun had been located around 225 feet GL. Poulson Drilling conducted a survey and ran a deviation tool which read 1.25 inches offset. No violations found during this inspection. |
1717691293 | 2016-10-31 | UrbanProduction Wells | No Violations | I inspected the Holy Spirit Catholic Church Unit # 1 to assess the restoration and construction activities. The well head and tank battery was accessed on a gravelled road. The well was configured to operated as an electric pumping well. The 8.625 annular monitoring gauge was absent and I was told by Rob Frock that the pumper has the gauge and will install it. The tank battery is located west of the well head and consists of one (1) 210 barrel oil tank, one (1) 100 barrel steel brine tank and a vertical separator. The tank battery was surrounded with an earthen dike. All equipment spacing rules were observed to meet the requirements. The 210 tank had the charcoal filter, lightening arrestor and pressure relief hatch in place. The fencing requirement has not been fulfilled at this time, but will be once the initial restoration is completed. The landscaping requirement was waived by the DOGRM Inspector. Joe Little Excavating was contouring the location with the top soil. I asked Mr. Frock to correct the silt fencing and maintain the same, in working condition, until the location has established vegetative growth and is stabilized. No violations identified during this inspection. |
1982191478 | 2016-03-09 | Urban Drill / Deepen / Reopen | No Violations | I was on site to conduct an inspection of the drilling pit solidification. Joe Little Excavating was on site waiting for the last load of material to complete the second drilling pit solidification. No violations at this time. |
884285445 | 2016-2-19 0:00: | UD | No Violations | |
979956946 | 2016-2-25 0:00: | CS | No Violations |
For data sources see[9]