If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-21326 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.14,"lon":-81.59,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: YELLOW CREEK RESERVE LLC | |
Well Pad ID: | |
Farm/Lease Name: SOLOMON | |
License Status: Final Restoration | |
License Date: 2017-09-15 | |
Spud Date: 1983-05-27 | |
Spud Drilling Contractor: CVAS DRLG | |
Final Drill Date: 1983-06-03 | |
Well Total Depth: 3896.00 ft | |
Configuration: Vertical | |
Latitude: 41.140000 | |
Longitude: -81.590000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1983-02-01 | 140 KST OIL & GAS CO INC GeoDate 2/1/83 |
Oil and Gas | 1983-02-01 | Issued Date 2/1/83 Expired Date 7/31/83 Acres 0023650 Tool Type CRAF Proposed Formation CLINTON Proposed Depth 03896 Proposed Drill Depth 03896 |
Original Spud | 1983-05-28 | UPDATE COORDINATES PER DOGRM SURVEYOR-ALE 12/13/17. |
Completed | 1983-06-03 | UPDATE COORDINATES PER DOGRM SURVEYOR-ALE 12/13/17. |
Reached Total Depth | 1983-06-03 | UPDATE COORDINATES PER DOGRM SURVEYOR-ALE 12/13/17. |
Completion Report Received | 1983-06-28 | UPDATE COORDINATES PER DOGRM SURVEYOR-ALE 12/13/17. |
CO | 1995-12-12 | 182 BELDEN & BLAKE CO GeoDate 2/1/83 |
Change of Owner | 2007-04-27 | Operator changed from 182, BELDEN & BLAKE CORPORATION to 7578, ENERVEST OPERATING LLC |
Change of Owner | 2017-07-19 | Operator changed from 7578, ENERVEST OPERATING LLC to 9941, YELLOW CREEK RESERVE LLC |
APP | 2017-09-15 | Proposed Formations:CLINTON, Issued Date:9/15/2017, Expired Date:9/15/2019 12:00:00 PM, Drilling unit acres:23, Proposed Well Type:OG, Proposed Well Class: |
Plugged/Abandoned | 2018-03-09 | UPDATE COORDINATES PER DOGRM SURVEYOR-ALE 12/13/17. |
Record Last Modified | 2019-02-07 | UPDATE COORDINATES PER DOGRM SURVEYOR-ALE 12/13/17. |
Construction Permit Expires | 2019-09-15 | UPDATE COORDINATES PER DOGRM SURVEYOR-ALE 12/13/17. |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 3650 | 3714 | 0 |
3650 | 3714 | 0 | |
2006-09-11 | 3686 | 3714 | 84 |
3686 | 3714 | 84 | |
3650 | 3714 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 120000 Gal | 0 | FRAC;1200MG H2O |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | KST OIL & GAS CO INC | 25038.00 | 5849.00 | 365 |
1985 | KST OIL & GAS CO INC | 18653.00 | 3621.00 | 365 |
1986 | KST OIL & GAS CO INC | 14848.00 | 2795.00 | 365 |
1987 | KST OIL & GAS CO INC | 11422.00 | 2073.00 | 365 |
1988 | KST OIL & GAS CO INC | 9009.00 | 1972.00 | 365 |
1989 | KST OIL & GAS CO INC | 9892.00 | 2037.00 | 365 |
1990 | KST OIL & GAS CO INC | 8650.00 | 1791.00 | 365 |
1991 | KST OIL & GAS CO INC | 8314.00 | 1714.00 | 365 |
1993 | KST OIL & GAS CO INC | 6534.00 | 1314.00 | 365 |
1994 | KST OIL & GAS CO INC | 6651.00 | 1173.00 | 365 |
1995 | KST OIL & GAS CO INC | 4817.00 | 732.00 | 365 |
1996 | BELDEN & BLAKE CORPORATION | 5328.00 | 799.00 | 366 |
1997 | BELDEN & BLAKE CORPORATION | 5438.00 | 871.00 | 337 |
1998 | BELDEN & BLAKE CORPORATION | 3248.00 | 771.00 | 266 |
1999 | BELDEN & BLAKE CORPORATION | 3568.00 | 813.00 | 230 |
2000 | BELDEN & BLAKE CORPORATION | 3301.00 | 678.00 | 312 |
2001 | BELDEN & BLAKE CORPORATION | 3054.00 | 884.00 | 365 |
2002 | BELDEN & BLAKE CORPORATION | 2991.00 | 712.00 | 346 |
2003 | BELDEN & BLAKE CORPORATION | 3083.00 | 607.00 | 365 |
2004 | BELDEN & BLAKE CORPORATION | 4278.00 | 438.00 | 366 |
2005 | BELDEN & BLAKE CORPORATION | 3706.00 | 696.00 | 365 |
2006 | BELDEN & BLAKE CORPORATION | 3487.00 | 504.00 | 365 |
2007 | ENERVEST OPERATING LLC | 3017.00 | 598.00 | 365 |
2008 | ENERVEST OPERATING LLC | 2957.00 | 576.00 | 365 |
2009 | ENERVEST OPERATING LLC | 2756.00 | 543.00 | 365 |
2010 | ENERVEST OPERATING LLC | 2138.00 | 558.00 | 365 |
2011 | ENERVEST OPERATING LLC | 1534.00 | 539.00 | 0 |
2012 | ENERVEST OPERATING LLC | 1489.00 | 484.00 | 366 |
2013 | ENERVEST OPERATING LLC | 2749.00 | 463.00 | 365 |
2014 | ENERVEST OPERATING LLC | 2279.00 | 417.00 | 365 |
2015 | ENERVEST OPERATING LLC | 1217.00 | 216.00 | 364 |
2016 | ENERVEST OPERATING LLC | 2408.00 | 328.00 | 360 |
2017 | ENERVEST OPERATING LLC | 1719.00 | 206.00 | 140 |
2018 | YELLOW CREEK RESERVE LLC | 0.00 | 0.00 | 0 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1412855546 | 2019-1-31 0:00: | FR | No Violations | 0.50 |
-1993065629 | 2018-3-7 0:00:0 | PB | No Violations | 4.50 |
-998923542 | 2018-3-7 0:00:0 | PB | No Violations | |
0311629838 | 2018-03-09 | Plug / Plug Back | No Violations | I check the cement level in the 8.625 surface casing and found it at 18 below the top of the casing head. The cement plug was hardened and free from any gas migration indications. I gave approval to affix the identifying plate once the casing was cut a minimum of 30 below grade. |
0998923542 | 2018-03-07 | Plug / Plug Back | No Violations | Chipco rig personnel had previously lowered the 1.5 work string to 3762 and today they opened the 4.5 casing to relieve the casing pressure. J Hawk Water Service had two (2) water trucks on location, one (1) with brine water and the other with fresh water. Chipco pumped approximately five barrels down the 1.5 tubing and then allowed the well to absorb, on vacuum, the brine until the well was balanced. The capacity of the 4.5 casing was 60 barrels and a total of 75 barrels was used to load the hole until it quit taking the fluid on vacuum. Mixed water parameters were temperature was 35 F, pH was 8 and Chlorides were 414 ppm. Chipco mixed a cement slurry consisting of 35 sacks of Class A cement and displaced it to 3300. Prior to achieving full displacement ( 8.3 bbl.. ) the displacement pump was disengaged ( @ 6.5 bbl.. ) to check if the well was on vacuum. The water level in the tub remained static and the displacement was completed to the calculated volume. Chipco removed the 1.5 work string from the well and shut in the well. No violations identified during this inspection. |
1159921965 | 2018-03-06 | Plug / Plug Back | No Violations | Chipco personnel were on location tallying the 1.5 work string prior to lowering it into the 4.5 production casing. I informed that the setting depth of the work string should be approximately 3764 to be compliant with OAC 1501:9-11-08 A (1). I spoke with Chip Smith ( Chipco ) to review and approve of plugging intervals and procedures. I requested to have sufficient saltwater on location to load up the well prior to displacing the Clinton sand plug. No violations identified during this inspection. |
1200686433 | 2018-03-08 | Plug / Plug Back | No Violations | Chipco Well Services opened the 4.5 casing and after a slight puff of gas, the casing was static. Chipco then lowered their ripping tool into the 4.5 casing and tagged the top of the Clinton plug at 3350, approximately 48 lower than the displacement depth. The Clinton sand plug was 336 over the top of the Clinton sand. Chipco tried to initiate a telegraph at 2510 and could not find free pipe until 2224. The 4.5 casing was parted at 224 and one (1) joint of 4.5 casing was removed to place the bottom of the casing at 2182. Chipco mixed a cement slurry consisting of 86 sacks of Class A cement and displaced the slurry through the interval from 2182 to 1897. Slurry density was 15.1 ppg. Mix water parameters were temperature was 34 F, 414 ppm Chlorides and pH was 8. Chipco removed 38 joints of 4.5 casing to 601 and circulated 35 barrels of fresh water to clear the 8.625 surface casing. A cement slurry was mixed and displaced through the interval 601 to 401 using 6.5 barrels of fresh water. The remaining 14 joints of 4.5 casing was removed from the 8.625 surface casing. Appalachian Well Surveys set a cast iron bridge plug at 250. Chipco lowered seven (7) joints of 1.5 tubing to 234 in order circulate the surface plug back to surface. The cement slurry weight was verified, by scale, at 14.7 ppg. Chipco removed the seven (7) joints of 1.5 tubing and then topped off the 8.625 surface casing. The casing was static without any indication of gas migration. |
1412855546 | 2019-01-31 | Final Restoration | No Violations | My inspection found the former well and tank battery sites are being developed for a residential allotment. A landowner waiver was received on 01-14-2019 at the Uniontown office of the ODNR Division of Oil & Gas. The Landowner waiver waives the removal of any pipeline. The final restoration is passed. |
1520438620 | 2018-03-05 | Plug / Plug Back | No Violations | Chipco Well Service was the plugging and cementing contractor for the well. The well was completed as a pumping well. Chipcos service rig was removing the rods and 2.375 tubing from the 4.5 production casing. The casing was reported to have approximately 250 psi. I requested that a apron be placed around the wellhead to catch the paraffin coming off the rods. The rig operator indicated that the fluid level was down at ~ 2500 per the fluid level on the tubing. The operator indicated that a 1.5 tubing work string would be employed to set the cement plugs and a wireline bridge plug would also be set. No violations found during this inspection. |
1993065629 | 2018-03-07 | Plug / Plug Back | No Violations | With Bob Roush (MRI-3), I am on location to witness the plugging of this well. CHIPCO is the plugging and cement contractor. The hole was loaded with brine and went on vacuum. A total of 65 barrels of brine were loaded in the hole. The bottom plug was placed.
Mixing water: pH 8.0, Chlorides: 414 ppm; Cement weight 15.0 |
311629838 | 2018-3-9 0:00:0 | PB | No Violations |
For data sources see[9]