If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-23006 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.24,"lon":-81.47,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: OHIO VALLEY ENERGY SYSTEMS COR | |
Well Pad ID: | |
Farm/Lease Name: LAUREL LAKES | |
License Status: Producing | |
License Date: 2007-07-06 | |
Spud Date: 2007-09-16 | |
Spud Drilling Contractor: WILDCAT DRILLING | |
Final Drill Date: 2007-09-19 | |
Well Total Depth: 3988.00 ft | |
Configuration: Vertical | |
Latitude: 41.240000 | |
Longitude: -81.470000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2007-07-06 | Proposed Formations:OHIO SHALE THRU CLINTON, Issued Date:7/6/2007, Expired Date:7/5/2008 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Completed | 2007-09-19 | |
Reached Total Depth | 2007-09-19 | |
Completion Report Received | 2007-11-23 | |
Construction Permit Expires | 2008-07-05 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2008-02-21 | 3743 | 3788 | 87 |
3743 | 3788 | 87 | |
3743 | 3788 | 87 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 2714 Bbl | 80000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | OHIO VALLEY ENERGY SYSTEMS COR | 20915.00 | 1268.00 | 213 |
2009 | OHIO VALLEY ENERGY SYSTEMS COR | 11832.00 | 257.00 | 365 |
2010 | OHIO VALLEY ENERGY SYSTEMS COR | 21646.00 | 1034.00 | 365 |
2011 | OHIO VALLEY ENERGY SYSTEMS COR | 26974.00 | 667.00 | 365 |
2012 | OHIO VALLEY ENERGY SYSTEMS COR | 18335.00 | 501.00 | 366 |
2013 | OHIO VALLEY ENERGY SYSTEMS COR | 9861.00 | 387.00 | 365 |
2014 | OHIO VALLEY ENERGY SYSTEMS COR | 8696.00 | 322.00 | 365 |
2015 | OHIO VALLEY ENERGY SYSTEMS COR | 6900.00 | 263.00 | 365 |
2016 | OHIO VALLEY ENERGY SYSTEMS COR | 4816.00 | 205.00 | 365 |
2017 | OHIO VALLEY ENERGY SYSTEMS COR | 3370.00 | 136.00 | 365 |
2018 | OHIO VALLEY ENERGY SYSTEMS COR | 4270.00 | 265.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 22 | 213 |
2009 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 65 | 365 |
2010 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 359 | 365 |
2011 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 213 | 365 |
2012 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 150 | 366 |
2013 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 77 | 365 |
2014 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 71 | 365 |
2015 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 88 | 365 |
2016 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 40 | 365 |
2017 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 0 | 365 |
2018 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 73 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-2069637150 | 2007-9-27 0:00: | DD | No Violations | |
-991730635 | 2008-6-11 0:00: | PL | No Violations | |
0949994400 | 2007-09-06 | Drill / Deepen / Reopen | No Violations | Ohio Valley is building the location. The property to the north included in the mandatory pooling is delineated in the field with silt fence and stakes. |
0991730635 | 2008-06-11 | Preliminary Restoration | No Violations | Preliminary restoration is approved. |
1269532023 | 2008-01-09 | Production Wells | No Violations | Status check inspection found that the well was in production and the site has been rough graded. Preliminary restoration is due this spring. No violations at this time. |
1427471069 | 2007-09-18 | Drill / Deepen / Reopen | No Violations | Wildcat is drilling out from under surface. The pits are lined and in good condition. The neighboring property to the north has not been affected by any of the site construction. No violations at this time. |
1670498248 | 2007-09-13 | Drill / Deepen / Reopen | No Violations | The location and access road are nearly complete. The rig should arrive in the next day or two. Precautions are still in place to protect the mandatory pool acreage to the north. |
2069637150 | 2007-09-27 | Drill / Deepen / Reopen | No Violations | The drilling pits have reportedly been solidified and covered over. Ohio Valley did not provide the required notification on pit solidification. |
949994400 | 2007-9-6 0:00:0 | DD | No Violations |
For data sources see[9]