If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-23103 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.18,"lon":-81.43,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: PEP DRILLING LLC | |
Well Pad ID: | |
Farm/Lease Name: CHURCH OF NEW HOPE | |
License Status: Producing | |
License Date: 2010-12-30 | |
Spud Date: 2011-08-26 | |
Spud Drilling Contractor: PEP DRLG | |
Final Drill Date: 2011-09-03 | |
Well Total Depth: | |
Configuration: Vertical | |
Latitude: 41.180000 | |
Longitude: -81.430000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2009-12-09 | Proposed Formations:CLINTON, Issued Date:12/9/2009, Expired Date:12/9/2010 6:00:00 AM, Drilling unit acres:24.513, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2010-12-30 | Proposed Formations:CLINTON, Issued Date:12/30/2010, Expired Date:12/29/2011 12:00:00 PM, Drilling unit acres:24.513, Proposed Well Type:OG, Proposed Well Class:POOL |
Correction to Well | 2011-01-07 | CORRECTION TO EXPIRATION DATE, SHOULD BE 12/29/2011. |
Reached Total Depth | 2011-09-03 | |
Construction Permit Expires | 2012-12-29 | |
Completion Report Received | 2013-10-16 | |
Change of Owner | 2016-05-24 | Operator changed from 1198, PIPES PURSIE E to 9640, PEP DRILLING LLC |
Record Last Modified | 2016-06-17 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2013-10-17 | 4018 | 4074 | 92 |
4018 | 4074 | 92 | |
4018 | 4074 | 92 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2011-09-03 | H2O | 15 | 76621 Bbl | 10000 | Universal Well Services Inc. | STAGE 1, 92 SHOTS |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | PIPES PURSIE E | 3696.00 | 222.00 | 364 |
2014 | PIPES PURSIE E | 3583.00 | 233.00 | 365 |
2016 | PEP DRILLING LLC | 1563.00 | 76.00 | 365 |
2017 | PEP DRILLING LLC | 857.00 | 63.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | PIPES PURSIE E | Brine | 1440 | 364 |
2014 | PIPES PURSIE E | Brine | 545 | 365 |
2016 | PEP DRILLING LLC | Brine | 0 | 365 |
2017 | PEP DRILLING LLC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1277324348 | 2011-9-6 0:00:0 | UD | No Violations | |
-1423374417 | 2011-9-1 0:00:0 | UD | No Violations | |
-1827919969 | 2011-8-26 0:00: | UD | No Violations | |
-1895131802 | 2011-8-18 0:00: | UD | No Violations | |
-2054212596 | 2011-9-27 0:00: | UD | No Violations | |
-2055980620 | 2012-12-18 0:00 | UP | No Violations | |
-343111509 | 2011-9-7 0:00:0 | UD | No Violations | |
-522772635 | 2011-11-15 0:00 | UD | No Violations | |
0343111509 | 2011-09-07 | Urban Drill / Deepen / Reopen | No Violations | The drilling rig is still on site waiting for their next location to be built. According to rig hands, they should be moving within the next few days. The pits are open, fenced, lined and in good condition. Solidification is tentatively scheduled for next week. |
0402912589 | 2012-01-17 | Urban Drill / Deepen / Reopen | No Violations | FOLLOW UP TO NOV # 1326829506 The Church of New Hope well was drilled in 2011 and was permitted on 20 acre spacing. Upon reaching TD and logging the well, it was discovered that the Clinton sandstone was deeper than 4,000 and therefore the well would require a 40 acre drilling unit. PEP was given until the expiration date of the drilling permit (12/29/2011) to acquire sufficient additional leases to meet the acreage and spacing requirements for a 40 acre drilling unit. The following summarizes activity at this location:
1. The drilling permit was issued on 12/9/2009 and expired on 12/9/2010 2. The drilling permit was reissued on 12/30/2010 and expired on 12/29/2011 3. PEP Drilling spudded the well on 8/25/2011 4. Surface casing was set and cemented on 8/27/2011 5. PEP Drilling reached first TD at 4,037 on 9/1/2011 6. The open hole nuclear logs indicate that the base of the Packer Shell is at 3,988 7. PEP Drilling reached final TD at 4,161 on 9/3/2011 8. The open hole nuclear logs indicate that the base of the Clinton sand is 4,074 To date, there has been no official documentation provided to the Division with proof that Pursie Pipes has acquired the necessary leases to meet the minimum acreage and spacing requirements. The well must be plugged and abandoned and the affected area reclaimed. |
0522772635 | 2011-11-15 | Urban Drill / Deepen / Reopen | No Violations | No change in the surface condition at this location. The affected area has not been graded or seeded. PEP is still working to acquire the necessary acreage to make this a legal 40+ acre drilling unit. Columbus has given PEP until the end of December (drilling permit expiration date) to complete the process. |
0908898688 | 2013-01-10 | UrbanProduction Wells | No Violations | Met with Mark Smith ( PEP Drlg. ) to determine if any H2S gas is present in the annular space. The 8.625 casing valve was opened and a Gas Detector was placed in the gas stream. The Gas Detector did not alert to the presence on H2S gas in the annular space. A fencing crew was on location to build the required fencing around the wellhead, tank battery and Dom/EOG gas measurement station. Annular casing valve with a pop-off pressure relief was in place and functional. All activities on this location were found to be in compliance. |
1277324348 | 2011-09-06 | Urban Drill / Deepen / Reopen | No Violations | On 9/1/11, PEP logged the well and found that it was not drilled deep enough. The well was drilled on 20 acre spacing but the top of the Clinton was below 4000. After much discussion about the likelyhood of obtaining the additional acreage and footage required to produce a formation deeper than 4000, PEP ran drill pipe back in and drilled another 140 approximately. On 9/2/11, they logged the well again and ran 4.5 casing. They are not permitted to complete the well until the additional acreage is obtained and the drilling unit is revised. Preliminary Restoration is due by the first of December. |
1315061575 | 2011-08-29 | Urban Drill / Deepen / Reopen | No Violations | PEP Drilling set surface casing early on 8/27. After waiting on cement and completing the BOP test, PEP resumed drilling the main hole with fresh water. On this date, they were drilling at 2920. The pits are fenced, lined and in good condition. |
1315412108 | 2011-08-30 | Urban Drill / Deepen / Reopen | No Violations | PEP Drilling is drilling on fluid at 3420. The pits continue to be fenced, lined and in good condition. No violations at this time. |
1326829506 | 2012-01-17 | Urban Drill / Deepen / Reopen | Violations Noted | The Church of New Hope well was drilled in 2011 and was permitted on 20 acre spacing. Upon reaching TD and logging the well, it was discovered that the Clinton sandstone was deeper than 4,000 and therefore the well would require a 40 acre drilling unit. PEP was given until the expiration date of the drilling permit (12/29/2011) to acquire sufficient additional leases to meet the acreage and spacing requirements for a 40 acre drilling unit. The following summarizes activity at this location:
1. The drilling permit was issued on 12/9/2009 and expired on 12/9/2010 2. The drilling permit was reissued on 12/30/2010 and expired on 12/29/2011 3. PEP Drilling spudded the well on 8/25/2011 4. Surface casing was set and cemented on 8/27/2011 5. PEP Drilling reached first TD at 4,037 on 9/1/2011 6. The open hole nuclear logs indicate that the base of the Packer Shell is at 3,988 7. PEP Drilling reached final TD at 4,161 on 9/3/2011 8. The open hole nuclear logs indicate that the base of the Clinton sand is 4,074 To date, there has been no official documentation provided to the Division with proof that Pursie Pipes has acquired the necessary leases to meet the minimum acreage and spacing requirements. The well must be plugged and abandoned and the affected area reclaimed. |
1336141059 | 2012-05-03 | Urban Drill / Deepen / Reopen | No Violations | The majority of the location has been rough graded. Still waiting for a final determination as to whether the well can be completed as drilled. |
1336144116 | 2012-04-11 | Urban Drill / Deepen / Reopen | No Violations | The requested reclamation work has not been started. I contacted Mark Smith who will meet with Wade Pol Contracting to perform the now required work. |
1423374417 | 2011-09-01 | Urban Drill / Deepen / Reopen | No Violations | PEP Drilling should reach total depth(TD) later today. The pits are fenced, lined and in good condition. |
1617766851 | 2011-08-30 | Urban Drill / Deepen / Reopen | No Violations | PEP is drilling at 3420 with salt water. The pits are fenced, lined and in good condition. |
1827919969 | 2011-08-26 | Urban Drill / Deepen / Reopen | No Violations | PEP Drilling spudded the well late last night and are drilling surface hole. They should be ready to set and cement surface casing later tonight. The drilling pits are fenced, lined and in good condition. |
1873925491 | 2011-08-16 | Urban Drill / Deepen / Reopen | No Violations | Associated is on site to start building the entrance, lease road and drilling location. The drilling permit and identification sign are posted. The rig is scheduled to start moving on 8/24. |
1895131802 | 2011-08-18 | Urban Drill / Deepen / Reopen | No Violations | PEP Drilling was scheduled to move on location today but will be delayed for one week. The location, entrance and drive are completed and in good condition. Silt fence is installed. Security fence will be installed after the rig arrives. |
1901080676 | 2011-09-20 | Urban Drill / Deepen / Reopen | No Violations | The pits have been solidified and covered over. The work was performed by Pyramid Pipeline and Chem Tech. No official word on attempts to obtain the additional acreage necessary to complete this well. I will contact PEP about reclaiming the site. |
2054212596 | 2011-09-27 | Urban Drill / Deepen / Reopen | No Violations | There has been no activity at this location since the drilling pits were solidified and covered. I spoke to Bill Marks about moving ahead with Preliminary Restoration while they attempt to acquire the additional acreage required to complete and produce the well. |
2055980620 | 2012-12-18 | UrbanProduction Wells | No Violations | I observed recent activities on this well as follows: 11/7/2012 Prepare to frac, move in frac tanks, 11/9/2012 Universal Well Services stimulated well, 11/13/2012 No activity, well shut-in, 11/14/2012 No activity, well shut-in, 11/15/2012 Move in Chippco service rig, unload 2.375 tubing, no pressure on well, well was static, run-in tubing,seating nipple set @ 3978.15 G.L.. Had 2 gas detectors on location, No indication of H2S gas, shut-in well @ 1300hrs. 11/19/2012 Move in Swab rig to pressure up well through tubing, well flowed, casing pressure @ 1200psi, Meeting with PEP Drlg. ( Bill Marks, Mark Smith, Perry Pipes ) Bob Roush to review tank battery location, moved tank Battery site to insure compliance, 11/29/2012 Reviewed plat and leases comprosing the 40 acre unit to assure compliance, gave plat and leases to Brian Reali ( Stow Law Director ) for his review, 12/4/2012 Reviewed revised tank battery plat, gave approval for construction of same, Tank ( 140 Bbl. ), Separator ( 2408 ) spotted on location, 12/18/2012 Status check, detected small gas leak on the tubing head, had Mark Smith tighten and resolve the leak. |
402912589 | 2012-1-17 0:00: | UD | No Violations | |
908898688 | 2013-1-10 0:00: | UP | No Violations | 1.00 |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
1326829506 | US-OH-109328 | 2012-01-17 | Drilling deeper than proposed total depth | |
1326829506 | US-OH-109329 | 2012-01-17 | Failure to meet setback requirements | |
1326829506 | US-OH-109330 | 2012-01-17 | Urban - failure to meet setbacks for well and/or tank battery |
For data sources see[9]