X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-157-24038

Well Details

Well ID: 34-157-24038
Loading map...
Country: United States
State: Ohio
County: Tuscarawas
Municipality: Wayne Township
Operator Name: BELDEN BRICK CO LLC, THE
Well Pad ID:
Farm/Lease Name: LECKY HARRY & WILLIAM
License Status: Producing
License Date: 1984-04-24
Spud Date: 1984-05-20
Spud Drilling Contractor: G & H DRLG
Final Drill Date: 1984-05-27
Well Total Depth: 4458.00 ft
Configuration: Vertical
Latitude: 40.610000
Longitude: -81.580000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Oil and Gas 1984-04-24 Issued Date 4/24/84 Expired Date 10/21/84 Acres 0040000 Tool Type RTF Proposed Formation CLINTON Proposed Depth 04458 Proposed Drill Depth 04458
Original Spud 1984-05-20
Completed 1984-05-27
Reached Total Depth 1984-05-27
CO 1984-06-25 554 BELDEN BRICK CO GeoDate 4/24/84
Construction Permit Expires 1984-10-21
Completion Report Received 1984-11-05
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 4296 4362 0
4296 4362 0
2006-09-11 4298 4362 7
4298 4362 7
4296 4362 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 81000 Bbl 40000 FRAC: H2O,SAND

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1984 BELDEN BRICK CO LLC, THE 14687.00 190.00 365
1985 BELDEN BRICK CO LLC, THE 22255.00 95.00 365
1986 BELDEN BRICK CO LLC, THE 13768.00 93.00 365
1987 BELDEN BRICK CO LLC, THE 9318.00 0.00 365
1988 LANDPROVEST INC 7665.00 94.00 365
1989 BELDEN BRICK CO LLC, THE 6586.00 0.00 365
1990 BELDEN BRICK CO LLC, THE 4804.00 0.00 365
1991 BELDEN BRICK CO LLC, THE 4200.00 83.00 365
1992 BELDEN BRICK CO LLC, THE 3357.00 0.00 365
1993 BELDEN BRICK CO LLC, THE 3415.00 0.00 365
1994 BELDEN BRICK CO LLC, THE 3745.00 0.00 365
1995 BELDEN BRICK CO LLC, THE 2559.00 0.00 365
1996 BELDEN BRICK CO LLC, THE 2839.00 0.00 366
1997 BELDEN BRICK CO LLC, THE 2832.00 0.00 365
1998 BELDEN BRICK CO LLC, THE 2123.00 0.00 365
1999 BELDEN BRICK CO LLC, THE 2188.00 78.00 365
2000 BELDEN BRICK CO LLC, THE 1442.00 0.00 365
2001 BELDEN BRICK CO LLC, THE 1425.00 0.00 365
2002 BELDEN BRICK CO LLC, THE 1565.00 0.00 365
2003 BELDEN BRICK CO LLC, THE 1514.00 0.00 365
2004 BELDEN BRICK CO LLC, THE 1314.00 0.00 365
2005 BELDEN BRICK CO LLC, THE 1338.00 82.00 365
2006 BELDEN BRICK CO LLC, THE 1671.00 0.00 365
2007 BELDEN BRICK CO LLC, THE 699.00 102.00 0
2008 BELDEN BRICK CO LLC, THE 746.00 0.00 365
2009 BELDEN BRICK CO LLC, THE 196.00 0.00 365
2010 BELDEN BRICK CO LLC, THE 477.00 0.00 365
2011 BELDEN BRICK CO LLC, THE 521.00 0.00 0
2012 BELDEN BRICK CO LLC, THE 569.00 0.00 366
2013 BELDEN BRICK CO LLC, THE 480.00 0.00 365
2014 BELDEN BRICK CO LLC, THE 294.00 0.00 365
2015 BELDEN BRICK CO LLC, THE 453.00 0.00 365
2016 BELDEN BRICK CO LLC, THE 67.00 0.00 365
2017 BELDEN BRICK CO LLC, THE 200.00 0.00 365
2018 BELDEN BRICK CO LLC, THE 368.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1984 BELDEN BRICK CO LLC, THE Brine 0 365
1985 BELDEN BRICK CO LLC, THE Brine 146 365
1986 BELDEN BRICK CO LLC, THE Brine 46 365
1987 BELDEN BRICK CO LLC, THE Brine 30 365
1988 LANDPROVEST INC Brine 19 365
1989 BELDEN BRICK CO LLC, THE Brine 0 365
1990 BELDEN BRICK CO LLC, THE Brine 0 365
1991 BELDEN BRICK CO LLC, THE Brine 0 365
1992 BELDEN BRICK CO LLC, THE Brine 0 365
1993 BELDEN BRICK CO LLC, THE Brine 0 365
1994 BELDEN BRICK CO LLC, THE Brine 0 365
1995 BELDEN BRICK CO LLC, THE Brine 44 365
1996 BELDEN BRICK CO LLC, THE Brine 0 366
1997 BELDEN BRICK CO LLC, THE Brine 12 365
1998 BELDEN BRICK CO LLC, THE Brine 15 365
1999 BELDEN BRICK CO LLC, THE Brine 13 365
2000 BELDEN BRICK CO LLC, THE Brine 0 365
2001 BELDEN BRICK CO LLC, THE Brine 0 365
2002 BELDEN BRICK CO LLC, THE Brine 51 365
2003 BELDEN BRICK CO LLC, THE Brine 35 365
2004 BELDEN BRICK CO LLC, THE Brine 31 365
2005 BELDEN BRICK CO LLC, THE Brine 19 365
2006 BELDEN BRICK CO LLC, THE Brine 31 365
2007 BELDEN BRICK CO LLC, THE Brine 0
2008 BELDEN BRICK CO LLC, THE Brine 0 365
2009 BELDEN BRICK CO LLC, THE Brine 0 365
2010 BELDEN BRICK CO LLC, THE Brine 0 365
2011 BELDEN BRICK CO LLC, THE Brine 0
2012 BELDEN BRICK CO LLC, THE Brine 0 366
2013 BELDEN BRICK CO LLC, THE Brine 0 365
2014 BELDEN BRICK CO LLC, THE Brine 0 365
2015 BELDEN BRICK CO LLC, THE Brine 69 365
2016 BELDEN BRICK CO LLC, THE Brine 0 365
2017 BELDEN BRICK CO LLC, THE Brine 35 365
2018 BELDEN BRICK CO LLC, THE Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1374341915 2017-8-10 0:00: PW No Violations
-1660975352 2018-6-4 0:00:0 PW No Violations 0.20
-1866419944 2015-10-8 0:00: PW No Violations 1.00
0000PL2848 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
1374341915 2017-08-10 Production Wells No Violations This is a producing plunger lift well. There were no problems noted at the time of the inspection.
1660975352 2018-06-04 Production Wells No Violations Upon arrival on location, I witnessed the well was equipped 4.5 inch diameter casing, 1.5 inch diameter tubing, and a plunger lift system. The valves on the tubing and casing were open. Production equipment included a steel 140 barrel tank, a horizonal separator, and chart recorder with an 2 by 1 inch orifice plate within an earthen dike. Domestic gas was being provided off the separator. The production report was up to date and proper identification was present.
1866419944 2015-10-08 Production Wells No Violations On the day of my inspection I found a 8 X 4 inch wellhead and a 4 X 1 1/2 inch wellhead operated by a plunger lift system. The valves are in the off position. The tank battery is made up of one 100 bbl tank, a horizontal separator, all in an earthen dike. The tanks is properly identified, the production reporting is up to date, and there are no violations.
PL2848 PL No Violations

For data sources see[9]

References