If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-157-24485 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.38,"lon":-81.33,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Tuscarawas | |
Municipality: Mill Township | |
Operator Name: EVERFLOW EASTERN PARTNERS LP | |
Well Pad ID: | |
Farm/Lease Name: JESSIE L UNIT | |
License Status: Producing | |
License Date: 1986-12-16 | |
Spud Date: 1987-03-05 | |
Spud Drilling Contractor: | |
Final Drill Date: 1987-03-12 | |
Well Total Depth: 5348.00 ft | |
Configuration: Vertical | |
Latitude: 40.380000 | |
Longitude: -81.330000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1986-12-16 | 84 EVERFLOW EASTERN PTNS L P GeoDate 12/16/86 |
Oil and Gas | 1986-12-16 | Issued Date 12/16/86 Expired Date 12/16/87 Acres 0055840 Tool Type RTA Proposed Formation CLINTON Proposed Depth 00000 Proposed Drill Depth 00000 |
Original Spud | 1987-03-05 | RL 2-28-87 |
Completed | 1987-03-12 | RL 2-28-87 |
Reached Total Depth | 1987-03-12 | RL 2-28-87 |
Construction Permit Expires | 1987-12-16 | RL 2-28-87 |
Record Last Modified | 2015-09-24 | RL 2-28-87 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 5127 | 5172 | 30 |
5127 | 5172 | 30 | |
5127 | 5172 | 30 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 99330 Gal | 64000 | |||
N2 | 0 | 246500 | 0 | CSF |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-425235595 | 2015-5-19 0:00: | PW | No Violations | 1.00 |
0000PL2522 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
0425235595 | 2015-05-19 | Production Wells | No Violations | On the date of inspection I found production equipment to include a 100bbl tank, a horizontal separator, and a concrete brine vault within an earthen dike. The well is equipped with a gas plunger lift system, 1.5 inch tubing, 4.5 inch casing, and 8.625 inch casing. At the time of my inspection all valves were in closed position. Identification is present, production records are current through 2014, and both the well head and production equipment are fenced in. |
1538159036 | 2018-09-28 | Production Wells | No Violations | Upon arrival on location, I witnessed the well was equipped with 4.5 inch diameter casing, 1.5 inch diameter tubing, and a plunger lift system. The valves on the tubing and on the casing were open. Production equipment included a steel 100 barrel tank, a horizonal separator, and a concrete vault within an earthen dike. The well and the production equipment had chain link fence around them. The production report was up to date and proper identification was present. |
PL2522 | PL | No Violations |
For data sources see[9]