If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-169-25673 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.95,"lon":-81.77,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Wayne | |
Municipality: Milton Township | |
Operator Name: MORTON SALT INC | |
Well Pad ID: | |
Farm/Lease Name: MORTON SALT INC (SMP #5) | |
License Status: Active Injection | |
License Date: 2012-09-21 | |
Spud Date: 2012-10-26 | |
Spud Drilling Contractor: KILBARGER DRLG | |
Final Drill Date: 2012-11-11 | |
Well Total Depth: 4692.00 ft | |
Configuration: Horizontal | |
Latitude: 40.950000 | |
Longitude: -81.770000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2012-09-21 | Proposed Formations:SALINA, Issued Date:9/21/2012, Expired Date:9/21/2014 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:SM, Proposed Well Class:SMP |
Reached Total Depth | 2012-11-11 | |
Completion Report Received | 2012-12-26 | |
Last Compliance Report | 2014-04-24 | |
Construction Permit Expires | 2014-09-21 | |
Record Last Modified | 2018-03-27 |
For data sources see[2]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-10868591 | 2017-7-18 0:00: | SM | No Violations | |
-1175886105 | 2012-12-20 0:00 | PW | No Violations | |
-1285391616 | 2019-5-2 0:00:0 | SM | No Violations | 1.20 |
-1329101621 | 2012-11-28 0:00 | DD | No Violations | |
-1573165205 | 2017-11-30 0:00 | SM | No Violations | 0.40 |
-1792357091 | 2015-6-10 0:00: | SM | No Violations | 0.50 |
-1962459115 | 2017-8-16 0:00: | SM | No Violations | |
-359340828 | 2013-7-15 0:00: | PL | No Violations | |
-391034228 | 2012-11-6 0:00: | DD | No Violations | |
-738355239 | 2018-8-30 0:00: | SM | No Violations | 0.20 |
-811626882 | 2012-11-1 0:00: | DD | No Violations | |
-827265943 | 2012-11-15 0:00 | DD | No Violations | |
-957181452 | 2012-12-12 0:00 | PL | No Violations | |
0010868591 | 2017-07-18 | Solution Mining Project | No Violations | Performed quarterly inspection on 07/18/2017 at the request of DOGRM UIC. A small fluid leak was noted from a flange on the large line. Mark Kurtz with Morton Salt was notified of this issue and will have it addressed by field staff promptly. Well identification is clearly displayed. No other problems were noted at the time of the inspection. |
0118886410 | 2012-12-04 | Drill / Deepen / Reopen | No Violations | The reserve pit has been emptied. The working pit still has fluid in it but there is plenty of freeboard. The rig is no longer there. |
0144992415 | 2014-10-24 | Solution Mining Project | No Violations | ID in place. No apparent problems at this time. |
0209206832 | 2012-11-05 | Drill / Deepen / Reopen | No Violations | Drilling ahead at 2980 Measured depth and still building angle. Current angle is ~66 degrees. |
0359340828 | 2013-07-15 | Preliminary Restoration | No Violations | The well is plumbed in to the water lines. The location is not yet back to original grade. |
0391034228 | 2012-11-06 | Drill / Deepen / Reopen | No Violations | Drilling ahead at 3000 on fluid and building angle. Will stop drilling at 3120 and pull out of the hole and run 8-5/8 Casing. After reaching the casing point, they were only able to pull one joint of drill pipe. They fear that they havent kept the hole clean and are trying to find a high viscosity sweep material that will work with salt water. |
0697247115 | 2012-11-21 | Drill / Deepen / Reopen | No Violations | The reserve pit has been emptied. There is still some fluid in the working pits though they now have plenty of freeboard. The rig is rigging down to move off. |
0738355239 | 2018-08-30 | Solution Mining Project | No Violations | I found the injection well in good repair. I observed no leaks or spills. There is an identification sign posted. |
0811626882 | 2012-11-01 | Drill / Deepen / Reopen | No Violations | Mud pump problems have delayed drilling. They finally got back to bottom with the directional assembly and started drilling at approximately 1:00 PM. |
0827265943 | 2012-11-15 | Drill / Deepen / Reopen | No Violations | Retrieved the fish. Total depth is 4992 measured depth. Appalachian ran a VDL CCL Bond log from 2913 to surface. There was a good bond the whole way. The rig will lay down the rest of the drill pipe and run 5-1/2 tubing. |
0957181452 | 2012-12-12 | Preliminary Restoration | No Violations | The pits remain open. The working pit is now completely full. I contacted Mr. Brown with Morton and he has scheduled the water truck to empty the pits for 12/13/12. He has also scheduled the closing of the woring pit for that date. The closing of the reserve pit will follow. |
1133795631 | 2020-5-22 0:00: | SM | No Violations | 1.30 |
1157080070 | 2014-03-06 | Solution Mining Project | No Violations | No apparent problems at this time. |
1175886105 | 2012-12-20 | Production Wells | No Violations | Both pits have been closed. The location is back to rough grade but will need to settle out until spring before it can be put to final grade. The road is in to the well head. The well head has been assembled. The pipe for both the injection and return pipe lines are on location but have not yet been welded together. There were no problems noted at the time of the inspection |
1185948044 | 2012-11-02 | Drill / Deepen / Reopen | No Violations | Drilling ahead at 2347 and building angle. Current angle is at 15 degrees. |
118886410 | 2012-12-4 0:00: | DD | No Violations | |
1315118694 | 2020-1-23 0:00: | SM | No Violations | 6.50 |
1329101621 | 2012-11-28 | Drill / Deepen / Reopen | No Violations | There is no change in the pits. There are 3 loads of the rig yet to be moved out. There were no problems noted at the time of the inspection. |
1351508583 | 2012-10-27 | Drill / Deepen / Reopen | No Violations | Set and cemented 11.75 surface casing this date. See the casing ticket for details. |
1351605528 | 2012-10-30 | Drill / Deepen / Reopen | No Violations | Drilling ahead at 1620 and dusting. |
1351766681 | 2012-10-31 | Drill / Deepen / Reopen | No Violations | They have reached the kick-off point of 2325. DDC has run a gyro log. They are tripping out of the hole for the directional assembly. |
1353326050 | 2012-11-16 | Drill / Deepen / Reopen | No Violations | They ran 110 joints of 5-1/2 tubing to 4685. The rig is rigging down and will move off on Monday. |
1354017144 | 2012-11-26 | Drill / Deepen / Reopen | No Violations | The drilling rig is still there. The working pit has been partially emptied and squeezed. The reserve pit is half full again from water from the working pit. |
1355831267 | 2012-12-14 | Preliminary Restoration | No Violations | The working pit has been emptied and filled in. The reserve pit has been emptied and and squeezed and the backhoe is diggiing fingers to hold the cuttings and sludge and should finish today. |
144992415 | 2014-10-24 0:00 | SM | No Violations | 0.50 |
1507296642 | 2017-10-05 | Solution Mining Project | No Violations | The operator requested inspection to witness mechanical integrity testing of the well. No issues observed during testing. |
1573165205 | 2017-11-30 | Solution Mining Project | No Violations | The proper identification sign is posted. I observed no spills or leaks. There are no violations at this time. |
1579880557 | 2020-1-24 0:00: | SM | No Violations | 3.00 |
1580234280 | 2020-1-28 0:00: | SM | No Violations | 6.20 |
1792357091 | 2015-06-10 | Solution Mining Project | No Violations | Good signs in place. No leakage. All appears to be in good order. |
1922701790 | 2012-11-08 | Drill / Deepen / Reopen | No Violations | On location to witness the pressure test of the 8-5/8 casing. Starting pressure: 550 psig. Ending pressure after 15 minutes: 542 psig. Pressure test passed. |
1962459115 | 2017-08-16 | Solution Mining Project | No Violations | Visited location on 08/16/2017 to ensure issues noted in the previous inspection had been addressed. All repairs had been made, and no leaks were noted. Well identification is clearly displayed. No problems were noted at the time of the inspection. |
2014879047 | 2014-05-28 | Solution Mining Project | No Violations | Signs need to be placed, have contacted producer. No other apparent problems at this time. |
209206832 | 2012-11-5 0:00: | DD | No Violations | |
697247115 | 2012-11-21 0:00 | DD | No Violations |
For data sources see[3]