Well Details

Well ID: 37-003-22461
Loading map...
Country: United States
State: Pennsylvania
County: Allegheny
Municipality: Plum Borough
Operator Name: HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC
Well Pad ID: 154401
Farm/Lease Name: MIDAS 8M
License Status:
Spud Date:
Permit Date: 2017-07-28
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.531453
Longitude: -79.766944

For data sources see[1][2][3]

Well History

Date Event
2017-07-28 New Permit Application
2018-05-01 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-06-26 2018-07-07 7,328 14,400,100

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand (100 Mesh Proppant) ProFrac Proppant Listed Below
Water 7732-18-5 70 0.00137
Hydrochloric Acid (Hydrogen Chloride) 7647-01-0 36 0.19518
2-Propyn-1-ol compound w/ methyloxirane 38172-91-7 15 0.00024
Sulphamic Acid 5329-14-6 5 0.0001
Water 7732-18-5 63 0.34157
Silica Substrate 14808-60-7 100 12.6857
Water 7732-18-5 85 0.00138
Citric Acid 77-92-9 40 0.00078
Sodium polyacrylate 9003-04-7 20 0.00184
Quaternary Ammonium Chloride 68391-01-5 3 0.00053
Glutaraldehyde 111-30-8 20 0.0035
Alcohols, C11-14-iso, C13 rich ethoxylates 78330-21-9 5 0.00229
Water HHEX Carrier/Base Fluid 7732-18-5 100
Flotreat DR 15635 Clariant Friction Reducer Listed Below
Scaletreat 30 Clariant Scale Inhibitor Listed Below
Hydrochloric Acid (7.5%) Cooper Natural Acidizing Listed Below
ProHib 100 ProFrac Acid Inhibitor Listed Below
ProFE 105 ProFrac Iron Control Listed Below

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2018 HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC 1,675,406.00 122 0.00 0 0.00 0
2019 HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC 3,759,486.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC Drill Cuttings 1,480.53 Tons LANDFILL 100280
2018 HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC Produced Fluid 21.98 Tons LANDFILL 100280
2018 HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC Produced Fluid 11,128.59 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC Produced Fluid 1,730.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC Drill Cuttings 21.83 Tons LANDFILL 100172
2018 HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC Synthetic Liner Materials 34.00 Tons LANDFILL 100280
2018 HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC Other Oil & Gas Wastes 147.10 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC Drilling Fluid Waste 4,615.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC Produced Fluid 1,878.70 Bbl REUSE (AT WELL PAD)
2018 HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC Drill Cuttings 45.75 Tons LANDFILL 100594
2018 HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC Produced Fluid 39.26 Tons LANDFILL 100594
2018 HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC Drilling Fluid Waste 115.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC Other Oil & Gas Wastes 2,602.10 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC Produced Fluid 2,073.31 Bbl INJECTION DISPOSAL WELL 34-099-23158
2019 HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC Produced Fluid 2,607.00 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2687811 Primary Facility 2018-01-29 Routine/Complete Inspection No Violations Noted Act 9 site ID sign installed. PPC Plan on site. Emergency Response Plan on site. Waste control and disposal on site. Operator actively conduction earth disturbance. Drilling had not commenced.
2724904 Primary Facility 2018-05-01 Drilling/Alteration No Violations Noted A track mounted auger rig is drilling to install 56' of 28" conductor casing.
2724960 Primary Facility 2018-04-30 Routine/Complete Inspection No Violations Noted Preconstruction inspection in response to the Operator request received on 4/26/2018. Spud notification received on 4/30/2018. Act 9 site ID sigh installed. PPC plan on site. Emergency Response plan on site. Site specific secondary containment plan on site. Well permit on site. ESCGP on site. Site appears to be constructed as outline in ESCGP. temporary E&S BMPs installed and functioning as designed. Disturbed areas temporary stabilized with seed and mulch or vegetative matting. Wet pond 2 constructed. Emergency overflow installed. Outlet installed. Sediment trap 1 and channel installed. Emergency overflow installed. Wet pond 3 installed. Outlet installed. Sediment trap 2 installed. Emergency outlet installed. Operator indicated that the wet ponds are scheduled to be planted and temporary stabilized on 5/1/2018.
2731175 Primary Facility 2018-05-17 Routine/Complete Inspection No Violations Noted Drill rig on site and placed on containment. Well permit, PPC plan, waste control and disposal plan, and ER plan on site. Act 9 site ID sign installed.
2734039 Primary Facility 2018-05-24 Drilling/Alteration No Violations Noted Rig is currently running 9 5/8" casing. The surface and mine string are cemented to the surface.The intermediate casing will be cemented later today.
2738005 Primary Facility 2018-06-06 Drilling/Alteration No Violations Noted Precision rig is drilling the horizontal with a 8.5" bit at 12,193'. The planned TD is 14,840'.
2750438 Primary Facility 2018-07-11 Drilling/Alteration No Violations Noted This well was fraced and the plugs will be drilled out a later date. The site is in good condition.
2766631 Primary Facility 2018-08-20 Routine/Complete Inspection No Violations Noted Inspection in response to a complaint received by the department on 8/13/2018. At the time of inspection, the Operator was performing secondary containment repairs and maintenance. The Operator representatives indicated that the site was being prepared for a well production flow test. The well has been drilled, stimulated but was not in production at the time of inspection. The GPU unit, located onsite, was placed on secondary containment. No observation of accelerated erosion and sedimentation was observed on the well pad or access road. Site ID sign installed. E&S plan, PPC plan, ER plan, Waste Control and Disposal plan onsite. No observation of accelerated erosion or sedimentation was observed on the well pad or access road.
2778711 Primary Facility 2018-09-24 Routine/Complete Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The well tag was affixed to the well apparatus. The well apparatus, brine tanks and GPU appeared to be in sound condition. The brine tanks and GPU were placed in secondary containment.
2809868 Primary Facility 2018-12-04 Complaint Inspection No Violations Noted Inspection in response to a noise complaint received by the Department on 11/30/2018. At the time of inspection, the well was drilled and equipped for production. The well apparatus, brine tanks and gas production unit appeared to be in sound conduction. The brine tanks and GPU were placed in secondary containment. The Act 9 site ID sign was installed. The E&S plan was on site. The PPC plan and ER plan were on site. A contractor was on site installing chain link fence around the wet pond located near the well site entrance. No observation of accelerated erosion or sedimentation in relation to well pad or access road. The Department used the iPad, specifically the Decibel X application, to take decibel readings at the center of the well pad and on both sides GPU units. According to the Decibel X app, the center of the well pad had a decibel reading of 59.0 dB. The left side of the GPU unit the application returned a reading of 63.5 dB and the right side of the GPU unit the app returned a reading of 64.4 dB.
2846591 Primary Facility 2019-03-01 Routine/Complete Inspection No Violations Noted At the time of inspection well equipped for production. Brine tanks within secondary containment and appears structurally sound. GPU on secondary containment. No E&S issues.