If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-003-22461 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.531453,"lon":-79.766944,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Allegheny | |
Municipality: Plum Borough | |
Operator Name: HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | |
Well Pad ID: 154401 | |
Farm/Lease Name: MIDAS 8M | |
License Status: | |
Spud Date: | |
Permit Date: 2017-07-28 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.531453 | |
Longitude: -79.766944 |
Date | Event |
---|---|
2017-07-28 | New Permit Application |
2018-05-01 | Performed Spud Operation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-06-26 | 2018-07-07 | 7,328 | 14,400,100 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Sand (100 Mesh Proppant) | ProFrac | Proppant | Listed Below | ||||
Water | 7732-18-5 | 70 | 0.00137 | |||||
Hydrochloric Acid (Hydrogen Chloride) | 7647-01-0 | 36 | 0.19518 | |||||
2-Propyn-1-ol compound w/ methyloxirane | 38172-91-7 | 15 | 0.00024 | |||||
Sulphamic Acid | 5329-14-6 | 5 | 0.0001 | |||||
Water | 7732-18-5 | 63 | 0.34157 | |||||
Silica Substrate | 14808-60-7 | 100 | 12.6857 | |||||
Water | 7732-18-5 | 85 | 0.00138 | |||||
Citric Acid | 77-92-9 | 40 | 0.00078 | |||||
Sodium polyacrylate | 9003-04-7 | 20 | 0.00184 | |||||
Quaternary Ammonium Chloride | 68391-01-5 | 3 | 0.00053 | |||||
Glutaraldehyde | 111-30-8 | 20 | 0.0035 | |||||
Alcohols, C11-14-iso, C13 rich ethoxylates | 78330-21-9 | 5 | 0.00229 | |||||
Water | HHEX | Carrier/Base Fluid | 7732-18-5 | 100 | ||||
Flotreat DR 15635 | Clariant | Friction Reducer | Listed Below | |||||
Scaletreat 30 | Clariant | Scale Inhibitor | Listed Below | |||||
Hydrochloric Acid (7.5%) | Cooper Natural | Acidizing | Listed Below | |||||
ProHib 100 | ProFrac | Acid Inhibitor | Listed Below | |||||
ProFE 105 | ProFrac | Iron Control | Listed Below |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2018 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | 1,675,406.00 | 122 | 0.00 | 0 | 0.00 | 0 |
2019 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | 3,759,486.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2018 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Drill Cuttings | 1,480.53 Tons | LANDFILL | 100280 |
2018 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Produced Fluid | 21.98 Tons | LANDFILL | 100280 |
2018 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Produced Fluid | 11,128.59 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2018 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Produced Fluid | 1,730.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Drill Cuttings | 21.83 Tons | LANDFILL | 100172 |
2018 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Synthetic Liner Materials | 34.00 Tons | LANDFILL | 100280 |
2018 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Other Oil & Gas Wastes | 147.10 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Drilling Fluid Waste | 4,615.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Produced Fluid | 1,878.70 Bbl | REUSE (AT WELL PAD) | |
2018 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Drill Cuttings | 45.75 Tons | LANDFILL | 100594 |
2018 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Produced Fluid | 39.26 Tons | LANDFILL | 100594 |
2018 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Drilling Fluid Waste | 115.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Other Oil & Gas Wastes | 2,602.10 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Produced Fluid | 2,073.31 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2019 | HUNTLEY & HUNTLEY ENERGY EXPLORATION LLC | Produced Fluid | 2,607.00 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2687811 | Primary Facility | 2018-01-29 | Routine/Complete Inspection | No Violations Noted | Act 9 site ID sign installed. PPC Plan on site. Emergency Response Plan on site. Waste control and disposal on site. Operator actively conduction earth disturbance. Drilling had not commenced. |
2724904 | Primary Facility | 2018-05-01 | Drilling/Alteration | No Violations Noted | A track mounted auger rig is drilling to install 56' of 28" conductor casing. |
2724960 | Primary Facility | 2018-04-30 | Routine/Complete Inspection | No Violations Noted | Preconstruction inspection in response to the Operator request received on 4/26/2018. Spud notification received on 4/30/2018. Act 9 site ID sigh installed. PPC plan on site. Emergency Response plan on site. Site specific secondary containment plan on site. Well permit on site. ESCGP on site. Site appears to be constructed as outline in ESCGP. temporary E&S BMPs installed and functioning as designed. Disturbed areas temporary stabilized with seed and mulch or vegetative matting. Wet pond 2 constructed. Emergency overflow installed. Outlet installed. Sediment trap 1 and channel installed. Emergency overflow installed. Wet pond 3 installed. Outlet installed. Sediment trap 2 installed. Emergency outlet installed. Operator indicated that the wet ponds are scheduled to be planted and temporary stabilized on 5/1/2018. |
2731175 | Primary Facility | 2018-05-17 | Routine/Complete Inspection | No Violations Noted | Drill rig on site and placed on containment. Well permit, PPC plan, waste control and disposal plan, and ER plan on site. Act 9 site ID sign installed. |
2734039 | Primary Facility | 2018-05-24 | Drilling/Alteration | No Violations Noted | Rig is currently running 9 5/8" casing. The surface and mine string are cemented to the surface.The intermediate casing will be cemented later today. |
2738005 | Primary Facility | 2018-06-06 | Drilling/Alteration | No Violations Noted | Precision rig is drilling the horizontal with a 8.5" bit at 12,193'. The planned TD is 14,840'. |
2750438 | Primary Facility | 2018-07-11 | Drilling/Alteration | No Violations Noted | This well was fraced and the plugs will be drilled out a later date. The site is in good condition. |
2766631 | Primary Facility | 2018-08-20 | Routine/Complete Inspection | No Violations Noted | Inspection in response to a complaint received by the department on 8/13/2018. At the time of inspection, the Operator was performing secondary containment repairs and maintenance. The Operator representatives indicated that the site was being prepared for a well production flow test. The well has been drilled, stimulated but was not in production at the time of inspection. The GPU unit, located onsite, was placed on secondary containment. No observation of accelerated erosion and sedimentation was observed on the well pad or access road. Site ID sign installed. E&S plan, PPC plan, ER plan, Waste Control and Disposal plan onsite. No observation of accelerated erosion or sedimentation was observed on the well pad or access road. |
2778711 | Primary Facility | 2018-09-24 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well was drilled and equipped for production. The well tag was affixed to the well apparatus. The well apparatus, brine tanks and GPU appeared to be in sound condition. The brine tanks and GPU were placed in secondary containment. |
2809868 | Primary Facility | 2018-12-04 | Complaint Inspection | No Violations Noted | Inspection in response to a noise complaint received by the Department on 11/30/2018. At the time of inspection, the well was drilled and equipped for production. The well apparatus, brine tanks and gas production unit appeared to be in sound conduction. The brine tanks and GPU were placed in secondary containment. The Act 9 site ID sign was installed. The E&S plan was on site. The PPC plan and ER plan were on site. A contractor was on site installing chain link fence around the wet pond located near the well site entrance. No observation of accelerated erosion or sedimentation in relation to well pad or access road. The Department used the iPad, specifically the Decibel X application, to take decibel readings at the center of the well pad and on both sides GPU units. According to the Decibel X app, the center of the well pad had a decibel reading of 59.0 dB. The left side of the GPU unit the application returned a reading of 63.5 dB and the right side of the GPU unit the app returned a reading of 64.4 dB. |
2846591 | Primary Facility | 2019-03-01 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. Brine tanks within secondary containment and appears structurally sound. GPU on secondary containment. No E&S issues. |
For data sources see[8]