37-005-30471

Well Details

Well ID: 37-005-30471
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: Mahoning Township
Operator Name: ALLIANCE PETRO CO LLC
Well Pad ID:
Farm/Lease Name: PUTNEY-DOVERSPIKE 8
License Status:
Spud Date:
Permit Date: 2009-09-30
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.939847
Longitude: -79.319075

For data sources see[1][2][3]

Well History

Date Event
2009-09-30 New Permit Application
2010-08-12 Performed Spud Operation
2010-08-17 Drilling Completion
2010-08-30 Perforation
2010-12-02 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 PHILLIPS EXPLORATION INC 352.00 106 0.00 0 0.00 0
2011 PHILLIPS EXPLORATION INC 3,146.00 364 0.00 0 0.00 0
2012 XTO ENERGY INC 3,991.00 366 0.00 0 0.00 0
2013 XTO ENERGY INC 4,063.00 364 0.00 0 0.00 0
2014 XTO ENERGY INC 4,443.00 365 0.00 0 0.00 0
2015 XTO ENERGY INC 4,808.00 365 0.00 0 0.00 0
2016 XTO ENERGY INC 4,476.00 366 0.00 0 0.00 0
2017 ALLIANCE PETRO CO LLC 3,028.00 334 0.00 0 0.00 0
2018 ALLIANCE PETRO CO LLC 5,181.00 365 0.00 0 0.00 0
2019 ALLIANCE PETRO CO LLC 2,060.00 304 0.00 0 0.00 0

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1907225 Primary Facility 2010-08-19 Routine/Complete Inspection No Violations Noted Drilling appeared to have been completed. Below grade pit located onsite and it had more than the required two feet of lined freeboard. Site is located in a cultivated corn field. All access road well-site erosion controls had been implemented properly and no accelerated erosion & sedimentation was observed in relation to the access road or well-site. The operator should continue to monitor the erosion controls until site restoration activities are completed
1946632 Primary Facility 2011-02-01 Routine/Complete Inspection No Violations Noted Drilling had been completed, well appeared to be equipped for production. Brine tank located onsite and appeared to be in sound condition. Site had been regraded, but due to snow cover the site was not evaluated for erosion issues.
2110326 Primary Facility 2012-10-24 Routine/Complete Inspection No Violations Noted Drilling had been completed well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Site had been restored and the vegetative cover met the 70% uniform coverage criteria.