If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-30714 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.737075,"lon":-79.514817,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: Manor Township | |
Operator Name: EXCO RESOURCES PA LLC | |
Well Pad ID: 148754 | |
Farm/Lease Name: LENAPE HEIGHTS UNIT 6H | |
License Status: | |
Spud Date: | |
Permit Date: 2010-09-16 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.737075 | |
Longitude: -79.514817 |
Date | Event |
---|---|
2010-09-16 | New Permit Application |
2010-12-03 | Performed Spud Operation |
2011-03-28 | Drilling Completion |
2011-06-09 | Perforation |
2014-04-14 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-06-09 | 2011-06-09 | 6,884 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | 3 HCl Acid | Calfrac Well Services | Perforation Breakdown | Hydrochloric acid | 7647-01-0 | 100.00 | 0.67 | |
Water | Base Fluid | Water | 100.00 | 87.78 | ||||
DWP-944 | Calfrac Well Services | Biocide | Polyethylene glycol | 25322-68-3 | 70.00 | 0.02 | ||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 40.00 | 0.01 | |||||
DAP-901 | Calfrac Well Services | Scale Inhibitor | Organic phosphonate | 30.00 | 0.00575000 | |||
Phosphoric acid ammonium salt | 5.00 | 0.00096000 | ||||||
Methanol | 67-56-1 | 30.00 | 0.00575000 | |||||
Ammonium chloride | 12125-02-9 | 10.00 | 0.00192000 | |||||
Oxyalkylated polyamine | 5.00 | 0.00096000 | ||||||
Amine salt | 5.00 | 0.00096000 | ||||||
DAP-103 | Calfrac Well Services | Iron Control | Citric acid | 77-92-9 | 60.00 | 0.00293000 | ||
DAP-923 | Calfrac Well Services | Corrosion Inhibitor | Methanol | 67-56-1 | 60.00 | 0.00070000 | ||
Ethoxylated C14-15 alcohols | 68951-67-7 | 30.00 | 0.00035000 | |||||
Thiourea polymer | 68527-49-1 | 30.00 | 0.00035000 | |||||
Propargyl alcohol | 107-19-7 | 10.00 | 0.00012000 | |||||
Fatty acids, tall-oil | 61790-12-3 | 30.00 | 0.00035000 | |||||
Alkenes, C>10 .alpha.- | 64743-02-8 | 5.00 | 0.00006000 | |||||
Sand (Proppant) | Calfrac Well Services | Propping Agent | Quartz | 14808-60-7 | 99.90 | 11.38 | ||
DWP-612 | Calfrac Well Services | Friction Reducer | No Hazardous Materials | 100.00 | 0.08 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | EXCO RESOURCES PA INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | EXCO RESOURCES PA INC | 137,521.00 | 61 | 0.00 | 0 | 0.00 | 0 |
2012 | EXCO RESOURCES PA LLC | 975,660.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | EXCO RESOURCES PA LLC | 627,555.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | EXCO RESOURCES PA LLC | 484,866.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | EXCO RESOURCES PA LLC | 457,577.40 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | EXCO RESOURCES PA LLC | 373,238.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | EXCO RESOURCES PA LLC | 318,992.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | EXCO RESOURCES PA LLC | 282,206.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2019 | EXCO RESOURCES PA LLC | 252,594.00 | 361 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | EXCO RESOURCES PA INC | Produced Fluid | 4,828.18 Bbl | INJECTION DISPOSAL WELL | 34-119-27350 |
2011 | EXCO RESOURCES PA INC | Drilling Fluid Waste | 794.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2011 | EXCO RESOURCES PA INC | Drilling Fluid Waste | 599.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | EPA ID: 748-163 |
2011 | EXCO RESOURCES PA INC | Drilling Fluid Waste | 100.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2011 | EXCO RESOURCES PA INC | Produced Fluid | 2,029.60 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | EXCO RESOURCES PA INC | Fracing Fluid Waste | 1,168.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0028207 |
2011 | EXCO RESOURCES PA INC | Drilling Fluid Waste | 112.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0028207 |
2011 | EXCO RESOURCES PA INC | Fracing Fluid Waste | 4,759.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | EXCO RESOURCES PA INC | Fracing Fluid Waste | 455.00 Bbl | INJECTION DISPOSAL WELL | 34-007-20919 |
2012 | EXCO RESOURCES PA LLC | Produced Fluid | 2,848.76 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2012 | EXCO RESOURCES PA LLC | Produced Fluid | 493.91 Bbl | INJECTION DISPOSAL WELL | 34-013-20611 |
2012 | EXCO RESOURCES PA LLC | Produced Fluid | 630.06 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | EXCO RESOURCES PA LLC | Produced Fluid | 1,782.92 Bbl | INJECTION DISPOSAL WELL | 34-119-27350 |
2012 | EXCO RESOURCES PA LLC | Produced Fluid | 101.87 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW008 |
2012 | EXCO RESOURCES PA LLC | Produced Fluid | 3,530.12 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2013 | EXCO RESOURCES PA LLC | Produced Fluid | 429.19 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | EXCO RESOURCES PA LLC | Produced Fluid | 105.21 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2013 | EXCO RESOURCES PA LLC | Produced Fluid | 3,807.96 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2013 | EXCO RESOURCES PA LLC | Produced Fluid | 48.00 Bbl | INJECTION DISPOSAL WELL | 34-119-27350 |
2014 | EXCO RESOURCES PA LLC | Produced Fluid | 3,326.89 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2015 | EXCO RESOURCES PA LLC | Produced Fluid | 3,028.60 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2016 | EXCO RESOURCES PA LLC | Produced Fluid | 2,147.30 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2016 | EXCO RESOURCES PA LLC | Produced Fluid | 308.90 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | EXCO RESOURCES PA LLC | Produced Fluid | 1,852.70 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2017 | EXCO RESOURCES PA LLC | 1,248.00 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE | |
2017 | EXCO RESOURCES PA LLC | Produced Fluid | 105.20 Bbl | REUSE (AT WELL PAD) | |
2017 | EXCO RESOURCES PA LLC | 105.20 Bbl | REUSE (AT WELL PAD) | ||
2018 | EXCO RESOURCES PA LLC | Produced Fluid | 207.10 Bbl | INJECTION DISPOSAL WELL | 34-007-21847 |
2018 | EXCO RESOURCES PA LLC | Produced Fluid | 1,149.10 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
2019 | EXCO RESOURCES PA LLC | Produced Fluid | 1,125.70 Bbl | INJECTION DISPOSAL WELL | PAS2D205BCLE |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1933769 | Primary Facility | 2010-12-13 | Routine/Complete Inspection | No Violations Noted | Drill rig onsite, drilling was ongoing at the Lenape Heights 6H (005-30714) well located on the pad. Drill pit had more than the required two feet of lined freeboard. E&S controls appeared to have been implemented as outlined in the E&S plan. Site is covered by ESCGP-1 ESX09-005-0006. Operator should continue to monitor the E&S controls and the access road until well development activities for the four wells located on the pad have been completed. |
1946895 | Primary Facility | 2011-02-02 | Routine/Complete Inspection | No Violations Noted | Drill rig onsite, drilling was not ongoing at the Lenape Heights 6H (005-30714) well located on the pad. No drill pit was located onsite as the drill rig set-up is a closed loop system where all drill cuttings are captured and hauled to an off-site landfill. E&S controls appeared to have been implemented as outlined in the E&S plan. Site is covered by ESCGP-1 ESX09-005-0006. Operator should continue to monitor the E&S controls and the access road until well development activities for the four wells located on the pad have been completed. |
1947945 | Primary Facility | 2011-02-02 | Drilling/Alteration | No Violations Noted | |
1951858 | Primary Facility | 2011-02-23 | Drilling/Alteration | No Violations Noted | Frontier rig released prior to completion of drilling |
1960151 | Primary Facility | 2011-03-16 | Drilling/Alteration | No Violations Noted | Rigging up Patterson UTI 257 |
1972874 | Primary Facility | 2011-04-05 | Routine/Complete Inspection | No Violations Noted | |
1983996 | Primary Facility | 2011-06-27 | Complaint Inspection | No Violations Noted | Well stimulation activities were ongoing at the time of the inspection. Spoke with pad manager Rick Olson regarding the water that had been observed on Penn View Road. Mr. Olson stated that the water is river water that is being withdrawn from the Allegheny River and deposited onto the paved roads to address dust issues. Mr. Olson stated that initially he questioned the water on the road and he contacted his superiors at EXCO and inquired about the watering of roads. He was informed that they were indeed spreading river water to minimize dust in the residential areas. This practice had been suspended during rainy days, however was begun again recently. Observed no accelerated erosion or sedimentation issues while onsite, however a full site inspection was not performed due to the ongoing well stimulation activities. |
1987403 | Primary Facility | 2011-07-11 | Incident- Response to Accident or Event | Violation(s) Noted | Inspection performed as a result of the operator notifying the Department of a release of flowback fluids to the ground. Wells were actively being flared at the time of the inspection. According to Doug Byers, who WQS Higgins met onsite an out of service pipe was left adjacent to the flare trailers brought onsite. This pipe still contained flowback fluid. Upon ignition of the flare stacks the fluid in the pipe was heated resulting in the pipe bursting and releasing the flowback fluid to the well pad immediately adjacent to the flar trailers and to a stormwater management trap. A vacuum truck located onsite vacuumed any fluid left on the surface. Prior to excavating the affected fill area the flare stacks had to be safely moved to another section of the well pad. Once this is completed the affected soil will be excavated and sampled to insure that all of the contaminated media had been excavated. |
2019236 | Primary Facility | 2011-09-30 | Compliance Evaluation | No Violations Noted | Drilling had been completed, wells appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. Noted that the roll-offs boxes that had contained the contaminated mdeia excavated as a result of the flowback discharge had been removed. There was no observed accelerated erosion or sedimentation observed in relation to the access road or well-site. Noted that the public road leading to the well pad had been repaved. Site required final stabilization, i.e. final grading, seeding & mulching. The Department recommends that the operator undertake temporary erosion controls to insure continued site stabilization through the winter months. |
2030067 | Primary Facility | 2011-12-29 | Administrative/File Review | No Violations Noted | review for compliance |
2042790 | Primary Facility | 2012-02-15 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed, well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Erosion controls had been implemented and maintained as outlined in the approved ESCGP. |
2252471 | Primary Facility | 2014-03-11 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2325798 | Primary Facility | 2014-12-03 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2444304 | Primary Facility | 2016-01-28 | Routine/Complete Inspection | No Violations Noted | Well was appropriately labeled and brine tank located onsite. Brine tank appeared to be in sound condition. Brine tank containment was holding a minimal amount of water. There was no observed accelerated erosion & sedimentation in relation to the site or access road. |
2560292 | Primary Facility | 2017-02-09 | Routine/Complete Inspection | No Violations Noted | Well tagged-in production. Well head casing-production set equipment-tank battery-dike containment looked ok. |
2694710 | Primary Facility | 2018-02-15 | Routine/Complete Inspection | No Violations Noted | At time of inspection, well 6H drilled and appears equipped for production. Wells 3H, 4H, and 5H also drilled and appear equipped for production. |
2841387 | Primary Facility | 2019-02-15 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, well was producing. The well integrity appeared to be in good condition, with no leaks or spills. Only some minor rust was observed. Flow could be heard. The cellar was filled to surface with gravel. There was a tubing gauge that was reading 204 psi. The well was properly labeled and the Emergency Response sign was posted at the entrance to the site. There were 4 tanks contained within a lined steel dike. 2 dual line heaters were also being used. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1987403 | 615205 | 07/11/2011 | 2011-07-11 | 78.54* - Failure to properly control or dispose of industrial or residual waste to prevent pollution of the waters of the Commonwealth. | Environmental Health & Safety |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
615205 | 272516 | NOV - Notice of Violation | Comply/Closed | 2011-10-13 | |||
615205 | 279689 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2012-01-23 | 2012-01-23 | $5,000.00 | $5,000.00 |
For data sources see[8]