If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-31210 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.864086,"lon":-79.674519,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: West Franklin Township | |
Operator Name: MCGAUGHEY SCOTT | |
Well Pad ID: 151399 | |
Farm/Lease Name: MCGAUGHEY 1 | |
License Status: | |
Spud Date: | |
Permit Date: 2014-06-18 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.864086 | |
Longitude: -79.674519 |
Date | Event |
---|---|
2014-06-18 | New Permit Application |
2014-08-11 | Performed Spud Operation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | MCGAUGHEY SCOTT | 95.00 | 90 | 0.00 | 0 | 0.00 | 0 |
2015 | MCGAUGHEY SCOTT | 2,854.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | MCGAUGHEY SCOTT | 6,926.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2017 | MCGAUGHEY SCOTT | 5,032.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | MCGAUGHEY SCOTT | 5,601.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | MCGAUGHEY SCOTT | 1,757.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2296571 | Primary Facility | 2014-08-19 | Routine/Complete Inspection | No Violations Noted | Drilling was ongoing at the time of the inspection. Drill pit located onsite and it contained drill cuttings and fluids. Drill pit had more than two feet of lined freeboard. There was no observed accelerated erosion or sedimentation in relation to the site or access road and the E&S controls had been implemented as outliend in the E&S plan. |
2296956 | Primary Facility | 2014-08-18 | Drilling/Alteration | No Violations Noted | First Class Energy rig#10 RD20 waiting on Operator decision to spud skidded well at time of inspection. On 08-15-14 Operator and Operator consulting rep T. Kunselman of Snyder Brothers Inc notified Department of encountering conditions of a nature which rendered drilling of the bore hole or a portion thereof impossible. Discussed with Operator and Operator consulting rep Act 13 Section 3211 (f) Drilling – (5), (6), (7). Well plugged from 720’ to surface. |
2301148 | Primary Facility | 2014-09-03 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed at the time of the inspection. Well was not equipped for production. Drill pit had been regraded. There was no observed accelerated erosion or sedimentation in relation to the site. |
2342834 | Primary Facility | 2015-02-10 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped for production. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2359983 | Primary Facility | 2015-04-08 | Site Restoration | No Violations Noted | Well appeared to be equipped for production. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Site had been regraded, seeded, mulched and the vegetative cover had attained 70% uniform coverage. |
For data sources see[6]