X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-005-31293

Well Details

Well ID: 37-005-31293
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: West Franklin Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: 152144
Farm/Lease Name: PAD W9
License Status: Active
Spud Date: 2017-07-01
Permit Date: 2017-06-14
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.830910
Longitude: -79.672353

For data sources see[1][2][3]

Well History

Date Event
2017-06-14 New Permit Application
2017-07-05 Performed Spud Operation
2017-12-07 Drilling Completion
2018-04-27 Perforation
2018-04-27 Performed Stage 1 of Stimulation
2018-04-28 Performed Stage 2 of Stimulation
2018-04-30 Perforation
2018-05-01 Perforation
2018-05-01 Performed Stage 3 of Stimulation
2018-05-01 Performed Stage 4 of Stimulation
2018-05-01 Performed Stage 5 of Stimulation
2018-05-01 Performed Stage 6 of Stimulation
2018-05-01 Performed Stage 7 of Stimulation
2018-05-01 Performed Stage 8 of Stimulation
2018-05-02 Perforation
2018-05-02 Performed Stage 10 of Stimulation
2018-05-02 Performed Stage 11 of Stimulation
2018-05-02 Performed Stage 12 of Stimulation
2018-05-02 Performed Stage 13 of Stimulation
2018-05-02 Performed Stage 9 of Stimulation
2018-05-03 Perforation
2018-05-03 Performed Stage 14 of Stimulation
2018-05-03 Performed Stage 15 of Stimulation
2018-05-03 Performed Stage 16 of Stimulation
2018-05-03 Performed Stage 17 of Stimulation
2018-05-03 Performed Stage 18 of Stimulation
2018-05-04 Perforation
2018-05-04 Performed Stage 19 of Stimulation
2018-05-04 Performed Stage 20 of Stimulation
2018-05-04 Performed Stage 21 of Stimulation
2018-05-05 Performed Stage 22 of Stimulation
2018-05-07 Perforation
2018-05-07 Performed Stage 23 of Stimulation
2018-05-07 Performed Stage 24 of Stimulation
2018-05-07 Performed Stage 25 of Stimulation
2018-05-08 Perforation
2018-05-08 Performed Stage 26 of Stimulation
2018-05-08 Performed Stage 27 of Stimulation
2019-06-11 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-04-27 2018-05-08 6,235 12,880,000 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 TRS 11800 Tight Rock Solutions Friction Reducer Alkyl Alcohol Not Assigned 10 0.00680457 8480.91
Oxyalkylated alcohol Not Assigned 5 0.00340229 4240.45
Hydrotreated Light Distillate 64742-47-8 30 0.0204137 25442.7
Inorganic Salt Not Assigned 10 0.00680457 8480.91
AP Breaker Lubrizol Breaker Ammonium persulfate 7727-54-0 100 0.00040117 500
Unihib G Geosafe Corrosion Inhibitor Butyl digycol 0000112-34-5 75 0.000618792 771.234
Thiourea 0000062-56-6 1 0.00000825 10.283
Formaldehyde 0000050-00-0 1 0.00000825 10.283
Methanol 0000067-56-1 5 0.00004125 51.416
Alcohols C10-16, ethoxylated 0068002-97-1 50 0.000412528 514.156
Hydrochloric Acid (7.5%) PVS Acidizing Hydrochloric Acid 7647-01-0 7.5 0.138145 172178
Water 7732-18-5 92.5 1.70379 2,123,530.0
TRS 805X Tight Rock Solutions Friction Reducer Alcohol Alkoxylates Not Assigned 5 0.0028421 3542.26
Aliphatic Hydrocarbon Not Assigned 30 0.0170526 21253.6
TRS 3001 Tight Rock Solutions Scale Control Amine Triphosphate Not Assigned 30 0.00757399 9439.87
Ethylene Glycol 107-21-1 5 0.00126233 1573.31
Sodium Phosphate, Tribasic 7601-54-9 5 0.00126233 1573.31
Water PennEnergy Resources Carrier/Base Fluid Water 7732-18-5 100 86.2382 107,483,000.0
Sand (Proppant) Sargent/Momentive/Prefferred Proppant Silica Substrate 14808-60-7 100 11.7503 14,645,100.0
Other Chemical(s) Listed Above See Trade Name(s) List Formaldehyde 0000050-00-0 1 0.00000825 10.283
Alcohols C10-16, ethoxylated 0068002-97-1 50 0.000412528 514.156
Alkyl Alcohol Not Assigned 10 0.00680457 8480.91
Ethylene Glycol 107-21-1 5 0.00126233 1573.31
Thiourea 0000062-56-6 1 0.00000825 10.283
Methanol 0000067-56-1 5 0.00004125 51.416
Sodium Phosphate, Tribasic 7601-54-9 5 0.00126233 1573.31
Alcohol Alkoxylates Not Assigned 5 0.0028421 3542.26
Water 7732-18-5 92.5 1.70379 2,123,530.0
Oxyalkylated alcohol Not Assigned 5 0.00340229 4240.45
Inorganic Salt Not Assigned 10 0.00680457 8480.91
BIOC12031A Nalco Biocide Glutaraldehyde 111-30-8 30 0.00544507 6786.49

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2018-04-27 1 Sand 9,576,050 8,382 5,099
2018-04-28 2 Sand 9,576,050 8,181 6,471
2018-05-01 3 Sand 9,576,050 8,283 6,186
2018-05-01 4 Sand 9,576,050 7,991 5,936
2018-05-01 5 Sand 9,576,050 7,674 6,251
2018-05-01 6 Sand 9,576,050 8,151 6,342
2018-05-01 7 Sand 9,576,050 7,884 5,232
2018-05-01 8 Sand 9,576,050 7,884 5,206
2018-05-02 9 Sand 9,576,050 7,964 5,323
2018-05-02 10 Sand 9,576,050 7,722 6,568
2018-05-02 11 Sand 9,576,050 7,119 6,623
2018-05-02 12 Sand 9,576,050 6,864 5,939
2018-05-02 13 Sand 9,576,050 6,767 6,317
2018-05-03 14 Sand 9,576,050 6,641 6,158
2018-05-03 15 Sand 9,576,050 6,846 6,628
2018-05-03 16 Sand 9,576,050 6,120 5,966
2018-05-03 17 Sand 9,576,050 6,294 6,088
2018-05-03 18 Sand 9,576,050 6,209 5,817
2018-05-04 19 Sand 9,576,050 6,259 5,172
2018-05-04 20 Sand 9,576,050 6,174 4,593
2018-05-04 21 Sand 9,576,050 7,109 6,766
2018-05-05 22 Sand 9,576,050 6,401 5,642
2018-05-07 23 Sand 9,576,050 6,328 5,769
2018-05-07 24 Sand 9,576,050 5,842 5,839
2018-05-07 25 Sand 9,576,050 6,008 6,375
2018-05-08 26 Sand 9,576,050 6,395 6,213
2018-05-08 27 Sand 9,576,050 5,025 5,120

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 PENNENERGY RESOURCES LLC 0.00 0 0.00 0 0.00 0
2018 PENNENERGY RESOURCES LLC 468,630.00 157 0.00 0 0.00 0
2019 PENNENERGY RESOURCES LLC 697,971.00 364 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 PENNENERGY RESOURCES LLC Drilling Fluid Waste 870.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2017 PENNENERGY RESOURCES LLC 308.83 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2017 PENNENERGY RESOURCES LLC Drilling Fluid Waste 690.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2017 PENNENERGY RESOURCES LLC Produced Fluid 806.72 Bbl REUSE (AT WELL PAD)
2017 PENNENERGY RESOURCES LLC Drill Cuttings 836.81 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Produced Fluid 18.33 Bbl INJECTION DISPOSAL WELL 34-155-23795
2018 PENNENERGY RESOURCES LLC Synthetic Liner Materials 4.28 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Filter Socks 0.50 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2018 PENNENERGY RESOURCES LLC Waste Water Treatment Sludge 6.73 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2018 PENNENERGY RESOURCES LLC Produced Fluid 1,560.05 Bbl REUSE (AT WELL PAD)
2018 PENNENERGY RESOURCES LLC Produced Fluid 11.20 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2018 PENNENERGY RESOURCES LLC Produced Fluid 721.00 Bbl INJECTION DISPOSAL WELL 34-155-22403
2018 PENNENERGY RESOURCES LLC Produced Fluid 1,246.00 Bbl INJECTION DISPOSAL WELL 34-155-21893
2018 PENNENERGY RESOURCES LLC Produced Fluid 38.33 Bbl INJECTION DISPOSAL WELL 34-155-23223
2018 PENNENERGY RESOURCES LLC Produced Fluid 33.21 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Produced Fluid 100.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 PENNENERGY RESOURCES LLC Produced Fluid 30.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste 55.83 Bbl REUSE (AT WELL PAD)
2018 PENNENERGY RESOURCES LLC Servicing Fluid 20.31 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2019 PENNENERGY RESOURCES LLC Produced Fluid 355.07 Bbl INJECTION DISPOSAL WELL 34-155-21893
2019 PENNENERGY RESOURCES LLC Produced Fluid 50.06 Bbl INJECTION DISPOSAL WELL 34-099-23158
2019 PENNENERGY RESOURCES LLC Produced Fluid 537.05 Bbl INJECTION DISPOSAL WELL 34-155-23223
2019 PENNENERGY RESOURCES LLC Produced Fluid 9,023.71 Bbl REUSE (AT WELL PAD)
2019 PENNENERGY RESOURCES LLC Produced Fluid 470.10 Bbl INJECTION DISPOSAL WELL 34-155-23196
2019 PENNENERGY RESOURCES LLC Produced Fluid 888.75 Bbl INJECTION DISPOSAL WELL 34-155-23795
2019 PENNENERGY RESOURCES LLC Produced Fluid 210.04 Bbl INJECTION DISPOSAL WELL 34-155-22403
2019 PENNENERGY RESOURCES LLC Produced Fluid 420.68 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2612498 Primary Facility 2017-07-06 Drilling/Alteration No Violations Noted Well sign present-spudded 7-5-2017 with 40' of 16" casing in a 8' round - 8' deep cellar.
2619275 Primary Facility 2017-07-26 Routine/Complete Inspection No Violations Noted Drilling had commenced but was not ongoing at the time of the inspection. Well development impoundment construction was in its final stages with final grading and mulching for temporary stabilization being completed. There was no observed accelerated erosion or sedimentation in relation to the site or access road. All erosion controls had been implemented and maintained as outlined in the E&S plan contained within the ESCGP.
2630669 Primary Facility 2017-08-28 Drilling/Alteration No Violations Noted The Rig had just run and cemented 2,814' of 8 5/8" casing-cemented with 720 sks cement and got 20 bbl cement return. Daily drilling info and all equipment on site looked ok.
2637399 Primary Facility 2017-09-15 Routine/Complete Inspection No Violations Noted Drilling was ongoing for 005-31296 at the time of the inspection. Secondary containment, and tertiary containment for number areas on the well pad was implemented as outlined. Well development impoundment construction had been completed and the impoundment was not lined and not in use. All access road and site erosion controls had been implemented as outlined in the E&S plan contained within the ESCGP. All erosion controls appeared to be maintained and functioning properly. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2661676 Primary Facility 2017-11-16 Routine/Complete Inspection No Violations Noted At time of inspection, 3H actively being drilled. 1H, 2H, 4H, 5H, 6H all spudded, not yet completed.

Operator representatives John Rice and Bobby Harrage on-site.

2665168 Primary Facility 2017-11-29 Drilling/Alteration No Violations Noted The rig had just skidded to this hole and was in the process of setting up to commence drilling at the time of this inspection. The daily drilling log and all equipment on site looked ok.
2670284 Primary Facility 2017-12-06 Routine/Complete Inspection No Violations Noted At time of inspection, drilling rig on 2H. 1H, 3H, 4H, 5H, 6H have all been spudded.

Operator representative Bobby Harrage on-site.

2678887 Primary Facility 2017-12-27 Routine/Complete Inspection No Violations Noted At time of inspection, drilling rig on 4H. Wells 1H, 2H, and 3H have been completed. Wells 5H and 6H have been spudded, not yet completed.

Operator representatives Heath Cunningham and Todd White on-site.

2691333 Primary Facility 2018-01-25 Routine/Partial Inspection No Violations Noted At time of inspection, well 2H drilled to total depth. Wells 1H, 3H, 4H, 5H, and 6H also drilled to total depth. These wells have not yet been frac'd.

The rig is in the process of exiting the site. Because of the large volume of vehicle traffic, the Department did not inspect the whole site due to safety concerns.

Operator representative James on-site.

2695906 Primary Facility 2018-02-15 Routine/Complete Inspection No Violations Noted At time of inspection, well 2H drilled to total depth. Wells 1H, 3H, 4H, 5H, and 6H also drilled to total depth. These wells have not yet been frac'd.

No rig on-site during this inspection.

2709358 Primary Facility 2018-03-15 Routine/Complete Inspection No Violations Noted At time of inspection, well 2H drilled, not yet frac'd. Frac'g not yet completed for wells 1H, 4H, 5H, and 6H. Frac'g operations ongoing for well 4H during this inspection. Well 3H frac'd.
2724503 Primary Facility 2018-04-30 Drilling/Alteration No Violations Noted Operator had just finished fracking stage 2 of the planned 27 stages at the time of this inspection. All paperwork and equipment on site looked ok. A Scada pressure monitoring unit will be set up on the offset Snyder wells in order to monitor these wells for potential communication later on in the frac stages. All equipment on site looked ok.
2726891 Primary Facility 2018-05-07 Drilling/Alteration No Violations Noted Operator had just finished fracking stage 23 of the planned 27 stages at the time of this inspection. All paperwork and equipment on site looked ok. A Scada pressure monitoring unit will be set up on the offset Snyder Mushroom Farms #1,2,4 and 5 wells in order to monitor these wells for potential communication later on in the frac stages. At the rime of this inspection the #4 Mushroom Farm well was being monitored. All equipment on site looked ok.
2727586 Primary Facility 2018-05-08 Routine/Complete Inspection No Violations Noted At time of inspection, frac'g of wells 1H, 2H, 3H, 4H, 5H, and 6H have been completed. Equipment being removed from site. Operator intends to begin drilling out plugs on Monday 5/14/18.

Operator representative Frank Kocher on-site.

2747764 Primary Facility 2018-07-02 Drilling/Alteration No Violations Noted On this date this well has been drilled, fracked and is awaiting flow back. The operator is moving equipment in to this well pad today to begin flowing back all 6 wells on this pad. The well is shut in, is tagged, the well head casing and all equipment on site looked ok.
2792880 Primary Facility 2018-10-23 Routine/Complete Inspection No Violations Noted Well appears equipped for production. Well head surrounded by cement barriers. Small generator on site located on secondary containment. Three brine tanks on site.
2821541 Primary Facility 2019-01-03 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The well head casing, piping, production set equipment, containment dike and tank battery look ok.

For data sources see[9]

References