X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-007-20513

Well Details

Well ID: 37-007-20513
Loading map...
Country: United States
State: Pennsylvania
County: Beaver
Municipality: New Sewickley Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: 154384
Farm/Lease Name: PER B22 1H
License Status:
Spud Date:
Permit Date: 2017-09-19
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.715969
Longitude: -80.177397

For data sources see[1][2][3]

Well History

Date Event
2017-09-19 New Permit Application
2018-01-03 Performed Spud Operation
2018-03-08 MOD

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-09-07 2018-09-23 5,291 25,849,800 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 BIOC12031A Tight Rock Biocide Listed Below
TRS 805X Tight Rock Friction Reducer Listed Below
Crystalline silica (Quartz) 14808-60-7 100 8.58648 20,820,400.0
Ethoxylated alcohols Proprietary 10 0.000150975 366.083
Apatite 64476-38-6 0.1 0.00858648 20820.4
Ilmenite 98072-94-7 0.1 0.00007250 175.809
Illite 12173-60-3 1 0.000725048 1758.09
Hydrochloric acid 7647-01-0 37 0.851014 2,063,530.0
Water 7732-18-5 100 88.9632 215,717,000.0
Diethylene glycol (mono) methyl ether 34590-94-8 20 0.00030195 732.165
Goethite 1310-14-1 0.1 0.00858648 20820.4
Calcite 471-34-1 1 0.0851398 206446
Glutaraldehyde 111-30-8 30 0.00568679 13789.3
Cinnamaldehyde 104-55-2 10 0.000150975 366.083
Isopropanol 67-63-0 5 0.00007549 183.041
Ethylene glycol 107-21-1 40 0.00156084 3784.7
Formic Acid 64-18-6 10 0.000150975 366.083
Diethylene glycol 111-46-6 1 0.00001510 36.608
Biotite 1302-27-8 0.1 0.00858648 20820.4
Ammonium Persulfate 7727-54-0 100 0.000350546 850
DWP-901 CWS Breaker Listed Below
Sand (Proppant) CWS Proppant Listed Below
TRS 17888 Tight Rock Friction Reducer Listed Below
Water Customer Base Fluid and Mix Water Listed Below
TRS 3001 Tight Rock Scale Inhibitor Listed Below
CI-9100G CWS Corrosion Inhibitor Listed Below

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 PENNENERGY RESOURCES LLC 760,737.00 271 0.00 0 8,814.00 271

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 PENNENERGY RESOURCES LLC Drill Cuttings 2,084.20 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste 2,405.83 Bbl REUSE (AT WELL PAD)
2018 PENNENERGY RESOURCES LLC Other Oil & Gas Wastes 125.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste 1,164.38 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 PENNENERGY RESOURCES LLC Produced Fluid 597.50 Bbl REUSE (AT WELL PAD)
2018 PENNENERGY RESOURCES LLC Produced Fluid 58.95 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Soil Contaminated by Oil & Gas Related Spills 6.71 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Soil Contaminated by Oil 6.71 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste 1,146.46 Bbl INJECTION DISPOSAL WELL 34-155-23223
2018 PENNENERGY RESOURCES LLC Produced Fluid 95.70 Bbl INJECTION DISPOSAL WELL 34-155-23196
2019 PENNENERGY RESOURCES LLC Produced Fluid 345.79 Bbl INJECTION DISPOSAL WELL 34-155-23196
2019 PENNENERGY RESOURCES LLC Drill Cuttings 1.23 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2019 PENNENERGY RESOURCES LLC Produced Fluid 31.61 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 PENNENERGY RESOURCES LLC Waste Water Treatment Sludge 1.02 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 PENNENERGY RESOURCES LLC Produced Fluid 544.80 Bbl INJECTION DISPOSAL WELL 34-155-23223
2019 PENNENERGY RESOURCES LLC Produced Fluid 24,128.18 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2678110 Primary Facility 2018-01-04 Drilling/Alteration No Violations Noted Cellar (8' x 8') installed, 20" conductor run. Cement truck on location cementing conductor and cellar floor. No violations noted. NOVIO
2679839 Primary Facility 2018-01-09 Routine/Complete Inspection No Violations Noted Site had been constructed as outlined within the E&S Plan contained within the ESCGP. The site was covered in snow and ice so erosion control BMP evaluation was not feasible at the time of the inspection. Drilling had commenced but was not ongoing at the time of the inspection. Well development impoundment had been constructed but had not been lined and was not in use as of the date of the inspection.
2684299 Primary Facility 2018-01-19 Drilling/Alteration No Violations Noted Mobilization of rig and equipment nearly complete. Containment is all in place. No violations noted. NOVIO
2693965 Primary Facility 2018-02-13 Drilling/Alteration No Violations Noted Rig skidded onto 1H from 2H today. Currently rigging up. No violations noted. NOVIO
2694286 Primary Facility 2018-02-14 Routine/Complete Inspection No Violations Noted Site and access road had been constructed in accordance with the ESCGP. All site and access road erosion controls had been implemented and maintained properly. With the upcoming precipitation forecasted the Department recommends the operator inspect the collection ditch in between the pad and impoundment and the rock outlet area for the sed trap to insure their continued proper function. There was no observed accelerated erosion or sedimentation in relation to the site or access road. There was an Act 9 sign located onsite in accordance with 25 Pa Code Chapter 78a.55(i). Drilling for 007-20514 Per B22 2H was ongoing at the time of the inspection. Secondary containment was located onsite and in use. 11 wheeled storage tanks were located onsite, 9 of which were located within tertiary containment. Additionally the vast majority of other containers located onsite were also within tertiary containment.
2694459 Primary Facility 2018-02-14 Drilling/Alteration No Violations Noted Highland rig 9 is drilling the top hole section of this well at 637'.
2699083 Primary Facility 2018-02-16 Drilling/Alteration No Violations Noted Rig drilling/making connection at 2252'. Repairing soft areas of pad after heavy rains. No violations noted. NOVIO
2699085 Primary Facility 2018-02-20 Drilling/Alteration No Violations Noted Rig TD'd well at 2550', set 9 5/8" casing and has begun demobilizing. Repairing soft areas of pad after heavy rains continues. No violations noted. NOVIO
2730873 Primary Facility 2018-05-17 Drilling/Alteration No Violations Noted Patterson 259 is drilling the bottom section of this well at 3,408'.
2734756 Primary Facility 2018-05-29 Drilling/Alteration No Violations Noted Patterson 259 drilled to a TD of 16,500'. On the way out of the hole they became stuck and are now fishing for their tools.
2736410 Primary Facility 2018-06-01 Drilling/Alteration No Violations Noted Patterson 259 drilled to a TD of 16,500'. On the way out the tools became stuck and they backed off and went back in to try and fish. The fishing did not go well and the decision was made to sidetrack. 2,980' of tools and drill pipe were left in the hole from 11,120' to 14,100'. The sidetrack started 10,150' and they are now drilling at 11,250'.
2739604 Primary Facility 2018-06-11 Drilling/Alteration No Violations Noted Patterson 259 ran 10,537' of 5.5" production casing then ran 5,938' of 7" on top. Total depth of the production casing is 16,475'.
2750697 Primary Facility 2018-07-11 Drilling/Alteration No Violations Noted The bottom hole section of this well is complete. The well is not fraced. The rig has moved. The site is in good condition.
2757784 Primary Facility 2018-07-23 Routine/Complete Inspection No Violations Noted At time of inspection, drilling equipment on-site. Wells 1H, 2H, 3H, 4H, 5H, 10H have been drilled, not yet frac'd.
2772829 Primary Facility 2018-09-07 Routine/Complete Inspection No Violations Noted Well currently being stimulated.
2778229 Primary Facility 2018-09-21 Routine/Complete Inspection No Violations Noted At the time of inspection the Operator was actively stimulating wells. ER plan, PPC plan, WCD Plan onsite, equipment placed on secondary containment. Act 9 site ID sign installed.
2852068 Primary Facility 2019-03-12 Routine/Complete Inspection No Violations Noted At the time of inspection well equipped for production. Three brine tanks within secondary containment and appear structurally sound. GPUs within secondary containment. No E&S issues.

For data sources see[8]

References