37-007-20516

Well Details

Well ID: 37-007-20516
Loading map...
Country: United States
State: Pennsylvania
County: Beaver
Municipality: New Sewickley Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: 154384
Farm/Lease Name: PER B22
License Status:
Spud Date:
Permit Date: 2017-10-12
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.715956
Longitude: -80.177614

For data sources see[1][2][3]

Well History

Date Event
2017-10-12 New Permit Application
2018-01-04 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-08-24 2018-10-01 5,525 21,541,400 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 TRS 17888 Tight Rock Friction Reducer Listed Below Listed Below 0 0 0
DWP-901 CWS Breaker Listed Below Listed Below 0 0 0
TRS 3001 Tight Rock Scale Inhibitor Listed Below Listed Below 0 0 0
TRS 805X Tight Rock Friction Reducer Listed Below Listed Below 0 0 0
Sand (Proppant) CWS Proppant Listed Below Listed Below 0 0 0
CI-9100G CWS Corrosion Inhibitor Listed Below Listed Below 0 0 0
BIOC12031A Tight Rock Biocide Listed Below Listed Below 0 0 0
Ethylene glycol 107-21-1 40 0.00145191 3013.84
Cinnamaldehyde 104-55-2 10 0.000131937 273.87
Crystalline silica (Quartz) 14808-60-7 100 11.0614 22,961,000.0
Ammonium Persulfate 7727-54-0 100 0.000467778 971
Formic Acid 64-18-6 10 0.000131937 273.87
Diethylene glycol 111-46-6 1 0.00001319 27.387
Diethylene glycol (mono) methyl ether 34590-94-8 20 0.000263873 547.741
Ethoxylated alcohols Proprietary 10 0.000131937 273.87
Goethite 1310-14-1 0.1 0.0110614 22961
Biotite 1302-27-8 0.1 0.0110614 22961
Hydrochloric acid 7647-01-0 37 0.817569 1,697,090.0
Glutaraldehyde 111-30-8 30 0.00537429 11155.8
Isopropanol 67-63-0 5 0.00006597 136.935
Apatite 64476-38-6 0.1 0.0110614 22961
Calcite 471-34-1 1 0.110614 229610
Other Chemical(s) Listed Above See Trade Name(s) List Listed Below
Water Customer Base Fluid and Mix Water Water 7732-18-5 100 86.6004 179,763,000.0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 PENNENERGY RESOURCES LLC 1,332,393.00 257 0.00 0 4,932.00 257

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 PENNENERGY RESOURCES LLC Filter Socks 1.52 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2018 PENNENERGY RESOURCES LLC Drill Cuttings 878.45 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste 2,405.91 Bbl REUSE (AT WELL PAD)
2018 PENNENERGY RESOURCES LLC Other Oil & Gas Wastes 5.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste 1,645.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 PENNENERGY RESOURCES LLC Produced Fluid 1,061.63 Bbl REUSE (AT WELL PAD)
2018 PENNENERGY RESOURCES LLC Produced Fluid 81.89 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Produced Fluid 13.43 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2018 PENNENERGY RESOURCES LLC Soil Contaminated by Oil & Gas Related Spills 6.71 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Soil Contaminated by Oil 6.71 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste 1,456.16 Bbl INJECTION DISPOSAL WELL 34-155-23223
2018 PENNENERGY RESOURCES LLC Produced Fluid 30.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2019 PENNENERGY RESOURCES LLC Produced Fluid 633.09 Bbl INJECTION DISPOSAL WELL 34-155-23196
2019 PENNENERGY RESOURCES LLC Drill Cuttings 1.26 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2019 PENNENERGY RESOURCES LLC Produced Fluid 57.87 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 PENNENERGY RESOURCES LLC Waste Water Treatment Sludge 1.02 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 PENNENERGY RESOURCES LLC Produced Fluid 850.98 Bbl INJECTION DISPOSAL WELL 34-155-23223
2019 PENNENERGY RESOURCES LLC Produced Fluid 39,934.46 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2678647 Primary Facility 2018-01-05 Drilling/Alteration No Violations Noted Cellar (8' x 8') installed, conductor run. Waiting on cement trucks. No violations noted. NOVIO
2679854 Primary Facility 2018-01-09 Routine/Complete Inspection No Violations Noted Site had been constructed as outlined within the E&S Plan contained within the ESCGP. The site was covered in snow and ice so erosion control BMP evaluation was not feasible at the time of the inspection. Drilling had commenced but was not ongoing at the time of the inspection. Well development impoundment had been constructed but had not been lined and was not in use as of the date of the inspection.
2684307 Primary Facility 2018-01-19 Drilling/Alteration No Violations Noted Mobilization of rig and equipment nearly complete. Containment is all in place. No violations noted. NOVIO
2688226 Primary Facility 2018-01-30 Drilling/Alteration No Violations Noted Rig is setting up over the 4H well. The 20" conductor is set at 40'.

The site is in good condition.

2690189 Primary Facility 2018-02-02 Drilling/Alteration No Violations Noted Rig drilling 12 3/8" hole at 1976'. No violations noted. NOVIO
2694288 Primary Facility 2018-02-14 Routine/Complete Inspection No Violations Noted Site and access road had been constructed in accordance with the ESCGP. All site and access road erosion controls had been implemented and maintained properly. With the upcoming precipitation forecasted the Department recommends the operator inspect the collection ditch in between the pad and impoundment and the rock outlet area for the sed trap to insure their continued proper function. There was no observed accelerated erosion or sedimentation in relation to the site or access road. There was an Act 9 sign located onsite in accordance with 25 Pa Code Chapter 78a.55(i). Drilling for 007-20514 Per B22 2H was ongoing at the time of the inspection. Secondary containment was located onsite and in use. 11 wheeled storage tanks were located onsite, 9 of which were located within tertiary containment. Additionally the vast majority of other containers located onsite were also within tertiary containment.
2694491 Primary Facility 2018-02-14 Drilling/Alteration No Violations Noted Top hole drilling is complete at 2550'. All casings are cemented to the surface.
2722678 Primary Facility 2018-04-25 Drilling/Alteration No Violations Noted Patterson 259 is drilling the bottom section of this well. The rig is drilling at 3,733' with a 8 3/4" bit.
2725980 Primary Facility 2018-05-03 Drilling/Alteration No Violations Noted Patterson 261 is drilling the horizontal portion of this well at 7,210'.

KOP was at 4,557', and the LP was at 5,701'.

2727840 Primary Facility 2018-05-09 Drilling/Alteration No Violations Noted Patterson 259 drilled to 15,800' and set 15,780' of production casing. There was 60 bbl's of cement returns.
2750719 Primary Facility 2018-07-11 Drilling/Alteration No Violations Noted The bottom hole section of this well is complete. The well is not fraced. The rig has moved. The site is in good condition.
2757788 Primary Facility 2018-07-23 Routine/Complete Inspection No Violations Noted At time of inspection, drilling equipment on-site. Wells 1H, 2H, 3H, 4H, 5H, 10H have been drilled, not yet frac'd.
2772822 Primary Facility 2018-09-07 Routine/Complete Inspection No Violations Noted Well currently being stimulated.
2778245 Primary Facility 2018-09-21 Routine/Complete Inspection No Violations Noted At the time of inspection the Operator was actively stimulating wells. ER plan, PPC plan, WCD Plan onsite, equipment placed on secondary containment. Act 9 site ID sign installed.
2852078 Primary Facility 2019-03-12 Routine/Complete Inspection No Violations Noted At the time of inspection well equipped for production. Three brine tanks within secondary containment and appear structurally sound. GPUs within secondary containment. No E&S issues.

For data sources see[8]

References