X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-007-20536

Well Details

Well ID: 37-007-20536
Loading map...
Country: United States
State: Pennsylvania
County: Beaver
Municipality: Marion Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: 154521
Farm/Lease Name: PER B9 2H
License Status:
Spud Date:
Permit Date: 2017-11-28
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.790972
Longitude: -80.172161

For data sources see[1][2][3]

Well History

Date Event
2017-11-28 New Permit Application
2018-03-03 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-08-08 2018-08-18 5,139 17,087,300 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand (Proppant) Sargent/Momentive/Prefferred Proppant Listed Below Listed Below 0 0 0
Unihib G Geosafe Corrosion Inhibitor Listed Below Listed Below 0 0 0
Aliphatic Hydrocarbon Not Assigned 30 0.0197674 32598.2
Amine Triphosphate Not Assigned 30 0.00542773 8950.79
Ethylene Glycol 107-21-1 5 0.000904622 1491.8
Substituted alkylamine Not Assigned 1 0.000194338 320.48
Methanol 0000067-56-1 5 0.00005436 89.638
Oxyalkylated alcohol Not Assigned 5 0.00097169 1602.4
Thiourea 0000062-56-6 1 0.00001087 17.928
Inorganic Salt Not Assigned 10 0.00194338 3204.8
Glutaraldehyde 111-30-8 30 0.00529087 8725.1
Alcohol Alkoxylates Not Assigned 5 0.00329457 5433.03
Butyl digycol 0000112-34-5 75 0.000815342 1344.57
Hydrotreated Light Distillate Not Assigned 30 0.00583014 9614.39
Formaldehyde 0000050-00-0 1 0.00001087 17.928
Silica Substrate 14808-60-7 100 10.9925 18,127,600.0
Ammonium persulfate 7727-54-0 100 0.000460862 760
Alcohols C10-16, ethoxylated 0068002-97-1 50 0.000543561 896.378
Hydrochloric Acid 7647-01-0 7.5 0.18125 298896
Sodium Phosphate, Tribasic 7601-54-9 5 0.000904622 1491.8
Other Chemical(s) Listed Above See Trade Name(s) List Water 7732-18-5 92.5 2.23541 3,686,390.0
Hydrochloric Acid (7.5%) PVS Acidizing Listed Below Listed Below 0 0 0
AP Breaker Lubrizol Breaker Listed Below Listed Below 0 0 0
TRS 3001 Tight Rock Solutions Scale Control Listed Below Listed Below 0 0 0
TRS 17888 Tight Rock Solutions Friction Reducer Listed Below Listed Below 0 0 0
BIOC12031A Nalco Biocide Listed Below Listed Below 0 0 0
TRS 805X Tight Rock Solutions Friction Reducer Listed Below Listed Below 0 0 0
Water PennEnergy Resources Carrier/Base Fluid Water 7732-18-5 100 86.4682 142,593,000.0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2018 PENNENERGY RESOURCES LLC 122,122.00 37 0.00 0 1,864.00 37
2019 PENNENERGY RESOURCES LLC 994,380.00 355 0.00 0 8,485.00 355

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 PENNENERGY RESOURCES LLC Drill Cuttings 825.83 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste 1,127.61 Bbl REUSE (AT WELL PAD)
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste 563.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 PENNENERGY RESOURCES LLC Produced Fluid 133.65 Bbl REUSE (AT WELL PAD)
2018 PENNENERGY RESOURCES LLC Produced Fluid 32.16 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Produced Fluid 10.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2018 PENNENERGY RESOURCES LLC Produced Fluid 1.80 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste 840.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2018 PENNENERGY RESOURCES LLC Produced Fluid 215.88 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 PENNENERGY RESOURCES LLC Produced Fluid 19.43 Bbl INJECTION DISPOSAL WELL 34-155-23196
2019 PENNENERGY RESOURCES LLC Filter Socks 0.49 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 PENNENERGY RESOURCES LLC Produced Fluid 21.76 Bbl INJECTION DISPOSAL WELL 34-155-23196
2019 PENNENERGY RESOURCES LLC Produced Fluid 29,557.70 Bbl REUSE (AT WELL PAD)
2019 PENNENERGY RESOURCES LLC Servicing Fluid 11.50 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2701357 Primary Facility 2018-03-06 Drilling/Alteration No Violations Noted A 16" conductor has been installed to a depth of 40", and was cemented up into the cellar. The site is being prepared for Highlands rig 9.
2707984 Primary Facility 2018-03-21 Drilling/Alteration No Violations Noted Highlands rig 9 is setting up over the conductor to drill the top hole section of the 2H well.
2708860 Primary Facility 2018-03-22 Drilling/Alteration No Violations Noted Rig drilled 15" hole to 780', ran 760.93' of 11 3/4" casing. Cement trucks are currently rigging up to cement. No violations noted. NOVIO
2730962 Primary Facility 2018-05-17 Drilling/Alteration No Violations Noted Patterson 261 set and cemented 13,313' of 5.5" production casing. The 5.5" casing is cemented to the surface.
2742060 Primary Facility 2018-06-15 Routine/Partial Inspection No Violations Noted At time of inspection, there are 6 wells on this site that have been spudded, not yet frac'd. The rig and associated drilling equipment are actively being removed from the location. As a result of this heavy truck traffic and transportation of equipment, the Department is unable to inspect the entire location during today's inspection.
2849943 Primary Facility 2019-03-07 Routine/Complete Inspection No Violations Noted At the time of inspection well equipped for production. Three brine tanks within secondary containment and appear structurally sound. GPUs on secondary containment. One AST on-site with signage identifying contents. AST inflow/outflow valve did not have additional spill containment structures. Department recommends Operator install spill containment structures beneath inflow/outflow valves. No E&S issues.

For data sources see[8]

References