X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-015-22291

Well Details

Well ID: 37-015-22291
Loading map...
Country: United States
State: Pennsylvania
County: Bradford
Municipality: Smithfield Township
Operator Name: CHIEF OIL & GAS LLC
Well Pad ID: 146323
Farm/Lease Name: TEETER UNIT 1H
License Status:
Spud Date:
Permit Date: 2012-10-25
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.862089
Longitude: -76.560553

For data sources see[1][2][3]

Well History

Date Event
2012-10-25 New Permit Application
2013-01-28 Performed Spud Operation
2013-04-04 Perforation
2014-08-27 NEWLY DRILLED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-05-01 2013-05-04 5,797 5,803,390

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 BA-40L Halliburton Buffering Agent Potassium Carbonate 584-08-7 60 0.00054 0
FR-66 Halliburton Friction Reducer Hydrotreated Light Petroleum Distillate 64742-47-8 30 0.022 0
Bactron K-139 Champion Technologies Biocide Quaternary ammonium compounds,
benzyl-C-12-16 alkyldimethyl, chlorides
68424-85-1 10 0.0035 0
Glutaraldehyde 111-30-8 5 0.0017 0
Ethanol 64-17-5 5 0.0017 0
Hydrochloric Acid 10-30% Halliburton Acid Hydrochloric Acid 7647-01-0 30 0.17 0
Water Provided by Customer Base Fluid Fresh Water 0000-00-0 100 99.79 0
Gyptron T-390 Champion Technologies Scale Inhibitor Methanol 67-56-1 10 0.00096 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2014 CHIEF OIL & GAS LLC 561,620.00 142 0.00 0 0.00 0
2015 CHIEF OIL & GAS LLC 801,129.64 362 0.00 0 0.00 0
2016 CHIEF OIL & GAS LLC 631,421.27 365 0.00 0 0.00 0
2017 CHIEF OIL & GAS LLC 532,941.87 359 0.00 0 0.00 0
2018 CHIEF OIL & GAS LLC 439,210.77 365 0.00 0 0.00 0
2019 CHIEF OIL & GAS LLC 365,029.13 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 CHIEF OIL & GAS LLC Fracing Fluid Waste 2,838.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHIEF OIL & GAS LLC Drilling Fluid Waste 330.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NC006
2013 CHIEF OIL & GAS LLC Drilling Fluid Waste 2,304.64 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2013 CHIEF OIL & GAS LLC Drill Cuttings 788.79 Tons LANDFILL 301358
2013 CHIEF OIL & GAS LLC Fracing Fluid Waste 55.81 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NC006
2013 CHIEF OIL & GAS LLC Drill Cuttings 73.98 Tons LANDFILL 100933
2014 CHIEF OIL & GAS LLC Produced Fluid 13,299.66 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHIEF OIL & GAS LLC Produced Fluid 9,050.15 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHIEF OIL & GAS LLC Produced Fluid 4,156.13 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CHIEF OIL & GAS LLC Produced Fluid 1,368.53 Bbl REUSE (AT WELL PAD)
2017 CHIEF OIL & GAS LLC Produced Fluid 260.21 Bbl REUSE OTHER THAN ROAD SPREADING
2018 CHIEF OIL & GAS LLC Produced Fluid 966.67 Bbl REUSE (AT WELL PAD)
2019 CHIEF OIL & GAS LLC Produced Fluid 1,127.39 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2104776 Primary Facility 2012-10-03 Routine/Complete Inspection No Violations Noted
2115595 Primary Facility 2012-11-14 Routine/Complete Inspection No Violations Noted
2147349 Primary Facility 2013-03-12 Routine/Complete Inspection No Violations Noted
2164903 Primary Facility 2013-05-06 Routine/Complete Inspection No Violations Noted
2168296 Primary Facility 2013-05-21 Routine/Complete Inspection No Violations Noted
2591226 Primary Facility 2017-05-08 Routine/Complete Inspection No Violations Noted Inspection to assess overall site conditions. I arrived on site at 12:46 hrs. No violations cited.
2804902 Primary Facility 2018-11-19 Routine/Partial Inspection No Violations Noted Electrical conductivity readings taken from pooled water with an Oakton PCSTestr 35. A puddle on the pad surface returned a 0.11 mS/cm reading. JLP

For data sources see[8]

References