X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-019-22430

Well Details

Well ID: 37-019-22430
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Clay Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: 152443
Farm/Lease Name: FLEEGER 2 UNIT 4H
License Status:
Spud Date: 2015-07-07
Permit Date: 2015-04-22
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.976711
Longitude: -79.892775

For data sources see[1][2][3]

Well History

Date Event
2015-03-04 Performed Stage 11 of Stimulation
2015-03-05 Performed Stage 12 of Stimulation
2015-03-06 Performed Stage 13 of Stimulation
2015-03-06 Performed Stage 14 of Stimulation
2015-03-07 Performed Stage 15 of Stimulation
2015-04-22 New Permit Application
2015-07-03 Performed Spud Operation
2015-09-30 Drilling Completion
2016-02-22 Perforation
2016-02-22 Performed Stage 1 of Stimulation
2016-02-25 Performed Stage 2 of Stimulation
2016-02-25 Performed Stage 3 of Stimulation
2016-02-26 Performed Stage 4 of Stimulation
2016-02-27 Performed Stage 5 of Stimulation
2016-02-28 Performed Stage 6 of Stimulation
2016-03-01 Performed Stage 7 of Stimulation
2016-03-02 Performed Stage 8 of Stimulation
2016-03-03 Perforation
2016-03-03 Performed Stage 10 of Stimulation
2016-03-03 Performed Stage 9 of Stimulation
2016-03-08 Perforation
2016-03-08 Performed Stage 16 of Stimulation
2016-03-08 Performed Stage 17 of Stimulation
2016-03-09 Performed Stage 18 of Stimulation
2016-03-10 Performed Stage 19 of Stimulation
2016-03-10 Performed Stage 20 of Stimulation
2016-03-11 Performed Stage 21 of Stimulation
2016-03-12 Performed Stage 22 of Stimulation
2016-03-13 Performed Stage 23 of Stimulation
2016-03-13 Performed Stage 24 of Stimulation
2016-03-14 Perforation
2016-03-14 Performed Stage 25 of Stimulation
2016-03-15 Performed Stage 26 of Stimulation
2016-03-15 Performed Stage 27 of Stimulation
2016-03-16 Performed Stage 28 of Stimulation
2016-03-17 Performed Stage 29 of Stimulation
2016-03-18 Performed Stage 30 of Stimulation
2016-03-18 Performed Stage 31 of Stimulation
2016-03-20 Performed Stage 32 of Stimulation
2016-03-21 Performed Stage 33 of Stimulation
2016-03-21 Performed Stage 34 of Stimulation
2016-03-21 Performed Stage 35 of Stimulation
2016-03-22 Perforation
2016-03-30 Perforation
2018-01-23 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-02-22 2016-03-30 5,390 14,561,400 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Rex Energy Carrier/Base Fluid Water 7732-18-5 100 87.3187 121,515,000.0
Breaker, WBO-2 Keane Gel Breaker Sodium Persulfate 7775-27-1 100 0.00001408 19.6
Slurry Gel, WG-111L Keane Gel Mineral oil/ light hydrotreated pet. distillate 64742-47-8 60 0.00116622 1622.94
Scaletrol 720 Baker Hughes Scale Inhibitor Water 7732-18-5 0 0.0159985 19579.4
Sodium Chloride 7647-14-5 0 0.000319969 391.587
2-propenoic, polymer with sodium phosphinate, sodium salt 71050-62-9 0 0.00639939 7831.75
Ethylene Glycol 107-21-1 30 0.00959908 11747.6
Potassium Chloride 7447-40-7 0 0.000319969 391.587
Calcium Chloride 10043-52-4 5 0.00159985 1957.94
Hydrochloric Acid (7.5%) Keane Acidizing Hydrochloric Acid 7647-01-0 7.5 0.0683582 95129.1
Water 7732-18-5 92.5 0.843084 1,173,260.0
Chlorine Dioxide Baker Hughes Biocide Chlorine Dioxide 10049-04-4 0.3 0.00202 2471.77
Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 11.6869 16,263,800.0
Iron Control, FEAC-20 Keane Iron Control Acetic acid 64-19-7 45 0.00139945 1947.51
Citric acid 77-92-9 30 0.000932965 1298.34
Friction Reducer, FR PRO 200 ECM Friction Reducer Ethoxylated alcohols 68439-50-9 4 0.00308 4263.32
Water 7732-18-5 50 0.03855 53291.5
Hydrotreated Petroleum

Distillate

64742-47-8 35 0.02698 37304.1
2-Propenoic acid, ammonium

salt,
polymer with 2- propenamide, sodium salt.

910644-97-2 45 0.03469 47962.4
Ethoxylated alcohols 68002-97-1 4 0.00308 4263.32
Ammonium acetate 631-61-8 12 0.00925 12790
Ethoxylated alcohols 68551-12-2 4 0.00308 4263.32
Acid Inhibitor, AI-11 Keane Acid Inhibitor Propargyl alcohol derivative Proprietary 60 0.000790649 1100.29
Potassium iodide 7681-11-0 5 0.00006589 91.691
Prop-2-yn-1-ol 107-19-7 1 0.00001318 18.338

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2016-02-22 1 Sand 0 7,523 5,285
2016-02-25 2 Sand 0 7,753 5,010
2016-02-25 3 Sand 0 7,650 5,595
2016-02-26 4 Sand 0 7,600 5,785
2016-02-27 5 Sand 0 7,286 5,256
2016-02-28 6 Sand 0 7,098 5,061
2016-03-01 7 Sand 0 7,096 5,324
2016-03-02 8 Sand 0 7,513 5,613
2016-03-03 9 Sand 0 6,897 5,560
2016-03-03 10 Sand 0 7,310 5,727
2015-03-04 11 Sand 0 7,171 5,589
2015-03-05 12 Sand 0 7,827 5,493
2015-03-06 13 Sand 0 7,047 5,474
2015-03-06 14 Sand 0 6,828 4,946
2015-03-07 15 Sand 0 7,043 5,853
2016-03-08 16 Sand 0 7,021 5,340
2016-03-08 17 Sand 0 6,412 5,753
2016-03-09 18 Sand 0 6,341 5,411
2016-03-10 19 Sand 0 7,327 5,236
2016-03-10 20 Sand 0 6,319 5,658
2016-03-11 21 Sand 0 7,059 5,198
2016-03-12 22 Sand 0 7,048 5,372
2016-03-13 23 Sand 0 6,913 5,743
2016-03-13 24 Sand 0 6,487 5,816
2016-03-14 25 Sand 0 6,819 5,345
2016-03-15 26 Sand 0 6,386 4,826
2016-03-15 27 Sand 0 6,140 5,516
2016-03-16 28 Sand 0 6,674 5,297
2016-03-17 29 Sand 0 6,640 5,842
2016-03-18 30 Sand 0 6,135 5,409
2016-03-18 31 Sand 0 6,301 5,360
2016-03-20 32 Sand 0 6,521 5,889
2016-03-21 33 Sand 0 6,639 4,815
2016-03-21 34 Sand 0 6,628 4,768
2016-03-21 35 Sand 0 6,603 5,175

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 RE GAS DEV LLC 0.00 0 0.00 0 0.00 0
2016 RE GAS DEV LLC 333,120.24 83 0.00 0 4,688.32 85
2017 RE GAS DEV LLC 1,002,253.50 357 0.00 0 9,705.24 357
2018 PENNENERGY RESOURCES LLC 737,159.42 357 0.00 0 7,826.88 357
2019 PENNENERGY RESOURCES LLC 635,242.00 357 0.00 0 6,661.00 357

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 RE GAS DEV LLC Drill Cuttings 842.74 Tons LANDFILL 100585
2015 RE GAS DEV LLC Produced Fluid 161.00 Bbl INJECTION DISPOSAL WELL 34-157-25506
2016 RE GAS DEV LLC Produced Fluid 90.00 Bbl INJECTION DISPOSAL WELL 34-133-24462
2016 RE GAS DEV LLC Produced Fluid 6,776.50 Bbl REUSE OTHER THAN ROAD SPREADING
2016 RE GAS DEV LLC Produced Fluid 1,060.48 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 RE GAS DEV LLC Produced Fluid 2,086.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2016 RE GAS DEV LLC Produced Fluid 105.00 Bbl INJECTION DISPOSAL WELL 34-157-25506
2016 RE GAS DEV LLC Produced Fluid 837.00 Bbl INJECTION DISPOSAL WELL 34-007-21847
2017 RE GAS DEV LLC Produced Fluid 4,708.16 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 RE GAS DEV LLC Produced Fluid 270.00 Bbl INJECTION DISPOSAL WELL 34-007-21847
2017 RE GAS DEV LLC Produced Fluid 180.00 Bbl INJECTION DISPOSAL WELL 34-133-24462
2017 RE GAS DEV LLC Produced Fluid 6,815.00 Bbl REUSE (AT WELL PAD)
2017 RE GAS DEV LLC Produced Fluid 6,947.00 Bbl INJECTION DISPOSAL WELL 34-155-24079
2018 RE GAS DEV LLC Produced Fluid 2,020.00 Bbl REUSE (AT WELL PAD)
2018 RE GAS DEV LLC Produced Fluid 325.00 Bbl INJECTION DISPOSAL WELL 34-007-21847
2018 RE GAS DEV LLC Produced Fluid 6,167.00 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 PENNENERGY RESOURCES LLC Produced Fluid 2,509.83 Bbl REUSE (AT WELL PAD)
2019 PENNENERGY RESOURCES LLC Produced Fluid 2,132.25 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 PENNENERGY RESOURCES LLC Waste Water Treatment Sludge 0.33 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2385366 Primary Facility 2015-07-06 Drilling/Alteration No Violations Noted
2390569 Primary Facility 2015-07-16 Drilling/Alteration No Violations Noted
2392602 Primary Facility 2015-07-21 Routine/Partial Inspection No Violations Noted
2412348 Primary Facility 2015-10-01 Drilling/Alteration No Violations Noted
2496026 Primary Facility 2016-06-27 Administrative/File Review No Violations Noted
2539618 Primary Facility 2016-11-29 Administrative/File Review No Violations Noted
2840120 Primary Facility 2019-02-05 Routine/Partial Inspection No Violations Noted On site for a routine partial inspection.

Well is drilled, completed, and in production. Well tag in place. Production equipment in place (tanks, GPU) and on containment. Gathering pipeline header on site.

BMPs in place, maintained, and functioning. Site stabilized with vegetation. Snow cover at time of inspection.

For data sources see[9]

References