37-019-22614

Well Details

Well ID: 37-019-22614
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Winfield Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: 154148
Farm/Lease Name: PER W34
License Status:
Spud Date:
Permit Date: 2017-06-12
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.797874
Longitude: -79.735786

For data sources see[1][2][3]

Well History

Date Event
2017-06-12 New Permit Application
2017-09-13 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-11-16 2018-11-30 6,218 17,115,000 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 AP Breaker Lubrizol Breaker Ammonium persulfate 7727-54-0 100 0.000499846 840
TRS 805X Tight Rock Solutions Friction Reducer Alcohol Alkoxylates Proprietary 5 0.00276106 4640.01
Aliphatic Hydrocarbon Proprietary 30 0.0165664 27840.1
Sand (Proppant) Sargent/Momentive/Prefferred Proppant Silica Substrate 14808-60-7 100 12.7204 21,376,900.0
Unihib G Geosafe Corrosion Inhibitor Thiourea 0000062-56-6 1 0.00000970 16.298
Methanol 0000067-56-1 5 0.00004849 81.489
Formaldehyde 0000050-00-0 1 0.00000970 16.298
Alcohols C10-16, ethoxylated 0068002-97-1 50 0.000484903 814.889
Butyl digycol 0000112-34-5 75 0.000727355 1222.33
TRS 3001 Tight Rock Solutions Scale Control Amine Triphosphate Proprietary 30 0.00540227 9078.62
Ethylene Glycol 107-21-1 5 0.000900378 1513.1
Sodium Phosphate, Tribasic 7601-54-9 5 0.000900378 1513.1
Water PennEnergy Resources Carrier/Base Fluid Water 7732-18-5 100 84.9886 142,825,000.0
Other Chemical(s) Listed Above See Trade Name(s) List Water 7732-18-5 92.5 2.00128 3,363,190.0
Formaldehyde 0000050-00-0 1 0.00000970 16.298
Methanol 0000067-56-1 5 0.00004849 81.489
Alcohols C10-16, ethoxylated 0068002-97-1 50 0.000484903 814.889
Thiourea 0000062-56-6 1 0.00000970 16.298
Ethylene Glycol 107-21-1 5 0.000900378 1513.1
Inorganic Salt Proprietary 10 0.00308714 5188
Sodium Phosphate, Tribasic 7601-54-9 5 0.000900378 1513.1
Oxyalkylated alcohol Proprietary 5 0.00154357 2594
Substituted alkylamine Proprietary 1 0.000308714 518.8
Alcohol Alkoxylates Proprietary 5 0.00276106 4640.01
BIOC12031A Nalco Biocide Glutaraldehyde 111-30-8 30 0.00654499 10999
Hydrochloric Acid (7.5%) PVS Acidizing Water 7732-18-5 92.5 2.00128 3,363,190.0
Hydrochloric Acid 7647-01-0 7.5 0.162266 272691
TRS 17888 Tight Rock Solutions Friction Reducer Oxyalkylated alcohol Proprietary 5 0.00154357 2594
Hydrotreated Light Distillate 64742-47-8 30 0.00926143 15564
Substituted alkylamine Proprietary 1 0.000308714 518.8
Inorganic Salt Proprietary 10 0.00308714 5188

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 PENNENERGY RESOURCES LLC 0.00 0 0.00 0 0.00 0
2019 PENNENERGY RESOURCES LLC 1,511,092.00 336 0.00 0 0.00 31

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 PENNENERGY RESOURCES LLC Other Oil & Gas Wastes 18.33 Bbl INJECTION DISPOSAL WELL 34-155-23223
2017 PENNENERGY RESOURCES LLC Produced Fluid 24.67 Bbl INJECTION DISPOSAL WELL 34-155-23223
2017 PENNENERGY RESOURCES LLC Produced Fluid 328.33 Bbl REUSE (AT WELL PAD)
2017 PENNENERGY RESOURCES LLC Produced Fluid 16.67 Bbl INJECTION DISPOSAL WELL 34-155-23196
2017 PENNENERGY RESOURCES LLC Drill Cuttings 326.05 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Drill Cuttings 728.76 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Produced Fluid 1,314.37 Bbl REUSE (AT WELL PAD)
2018 PENNENERGY RESOURCES LLC Produced Fluid 4.65 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste 974.17 Bbl INJECTION DISPOSAL WELL 34-155-23223
2018 PENNENERGY RESOURCES LLC Soil Contaminated by Oil & Gas Related Spills 3.73 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Produced Fluid 10.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste 1,213.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 PENNENERGY RESOURCES LLC Produced Fluid 20.40 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste 389.97 Bbl REUSE (AT WELL PAD)
2018 PENNENERGY RESOURCES LLC Soil Contaminated by Oil 3.73 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2019 PENNENERGY RESOURCES LLC Soil Contaminated by Oil 2.50 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2019 PENNENERGY RESOURCES LLC Produced Fluid 33,966.90 Bbl REUSE (AT WELL PAD)
2019 PENNENERGY RESOURCES LLC Soil Contaminated by Oil & Gas Related Spills 2.50 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2019 PENNENERGY RESOURCES LLC Produced Fluid 18.33 Bbl INJECTION DISPOSAL WELL 34-155-23795
2019 PENNENERGY RESOURCES LLC Filter Socks 0.71 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 PENNENERGY RESOURCES LLC Produced Fluid 7.67 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 PENNENERGY RESOURCES LLC Servicing Fluid 13.36 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2019 PENNENERGY RESOURCES LLC Waste Water Treatment Sludge 1.91 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 PENNENERGY RESOURCES LLC Produced Fluid 29.88 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2638063 Primary Facility 2017-09-14 Drilling/Alteration No Violations Noted At the time of inspection, Soilmec was onsite using an auger. Will be setting 40' of 20" conductor. Cellar is set on the well. Cuttings are being moved to the side of the pad for land application. Location is stoned. Permit (paper form) and Emergency Response sign is posted at the lease entrance.
2644843 Primary Facility 2017-09-28 Routine/Partial Inspection No Violations Noted At the time of inspection, O-Tex is leaving the site after cementing surface casing. Surface casing was cemented using 615 sxs Class H, 2% CaCl2, 2% Gypsum, 15.8 ppg, 1.22 yield. Displaced with 109 bbls freshwater and had 34 bbls cement return to surface. Plug was bumped and floats held. A float shoe and float collar (top at 692') were used along with 9 centralizers. All activities took place on containment, which appeared to be in good condition during cement job.
2647380 Primary Facility 2017-10-03 Routine/Partial Inspection No Violations Noted At the time of inspection, Highlands rig 9 has been moved on to the #4H well. This well had intermediate casing cemented using 995 sxs Class H, 2% Gypsum (212 bbls), 15.8 ppg, 1.2 yield. Displaced with 170 bbls and had 55 bbls cement return to surface. A float shoe and float collar (top at 2711') were used along with 38 centralizers.
2706197 Primary Facility 2017-03-16 Administrative/File Review No Violations Noted
2709546 Primary Facility 2018-03-20 Routine/Partial Inspection No Violations Noted At the time of inspection, Patterson 259 was drilling 8 3/4" on the #3H well. Containment was being patched. Production casing for the #2H well was cemented using a lead 1 of 350 sxs HalCem (70 bbls), 14.5 ppg, 1.132 yield, a lead 2 of 1220 sxs Class H (246 bbls), 14.5 ppg, 1.135 yield, and tail of 1290 sxs SoluCem (418 bbls), 15.2 ppg, 1.819 yield.

Displacement was 346 bbls freshwater with KCl mixed in the first 20 bbls. Plug landed and floats held. 47 bbls cement returned to surface.

2709643 Primary Facility 2018-03-26 Administrative/File Review No Violations Noted
2722758 Primary Facility 2018-04-25 Routine/Partial Inspection No Violations Noted On 4/25/2018, WQS Brian MacQuarrie onsite for the purpose of conducting an site inspection. Sign maintained at entrance identifying site and individual signs for wells and permit Nos. . Site mailbox contains Erosion and Sedimentation Plan and E/S inspection reports with most recent conducted on 4/17/2018. Site access road maintained. Patterson Rig # 259 no longer onsite. Soundwall constructed around well pad. Six wells spudded including ; 1H-019-22613, 2H-019-22614, 3H-019-22615, 4H-019-22616, 5H-019-22661 and the 6H-019-22617.
2724329 Primary Facility 2018-04-30 Administrative/File Review No Violations Noted
2752874 Primary Facility 2018-07-16 Routine/Partial Inspection No Violations Noted On 7-16-2018, WQS Brian MacQuarrie onsite for the purpose of conducting an site inspection. Sign maintained at entrance identifying site and individual signs for wells and permit Nos.. Site access road maintained. Patterson Rig # 259 no longer onsite. Soundwall constructed around well pad. Six wells drilled including ; 1H-019-22613, 2H-019-22614, 3H-019-22615, 4H-019-22616, 5H-019-22661 and the 6H-019-22617.
2794380 Primary Facility 2018-10-24 Routine/Partial Inspection No Violations Noted On 11/24/2018, WQS Brian MacQuarrie onsite meet with Frank Kocher (PennEnergy). Universal and Renegade onsite. Well stimulation activities underway. Wells 6H-019-22617 and 4H-019-22616 fraced. Four wells left to be fraced, 1H-019-22613, 2H-019-22614, 3H-019-22615 and 5H-019-22661. Secondary containment setup. Large AST onsite to aid in frac. Erosion and Sedimentation BMPs maintained. Vegetative growth well established.
2813978 Primary Facility 2018-12-12 Routine/Partial Inspection No Violations Noted On 12/12/2018, WQS Brian MacQuarrie onsite. Meet with Heath Cunningham-PennEnergy. Deep well services onsite. Snubbing unit #3 is onsite. Currently plugs are being drilled out and production tubing installed in six wells; 1H-019-22613, 2H-019-22614, 3H-019-22615, 4H-019-22616, 5H-019-22617 and 6H-019-22617. Well site secondary containment setup. Large AST onsite and contains approximately 8 inches of impaired water. Erosion and Sedimentation BMPs installed and maintained.
2832624 Primary Facility 2019-01-28 Routine/Partial Inspection No Violations Noted On 1/28/2019, WQS Brian MacQuarrie onsite. Six wells fraced; 1H-019-22613, 2H-019-22614, 3H-019-22615, 4H-019-22616, 5H-019-22661 and 6H-019-22617. Crew onsite flowing back the 2H . The last of six wells. Three 400 bbl production fluid tanks installed within stainless steel containment structure. Large AST onsite containing impaired water. Water from AST is currently being hauled to the B17 well pad in Beaver County. Frac tanks installed within secondary containment. Snow on ground during inspection.

For data sources see[8]

References