37-019-22649

Well Details

Well ID: 37-019-22649
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Jackson Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: 153349
Farm/Lease Name: PER B34
License Status: Active
Spud Date: 2017-10-13
Permit Date: 2017-10-11
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.746408
Longitude: -80.1510

For data sources see[1][2][3]

Well History

Date Event
2017-10-11 New Permit Application
2017-10-12 Performed Spud Operation
2018-01-24 Drilling Completion
2018-06-14 Perforation
2018-06-14 Performed Stage 1 of Stimulation
2018-06-14 Performed Stage 2 of Stimulation
2018-06-14 Performed Stage 3 of Stimulation
2018-06-14 Performed Stage 4 of Stimulation
2018-06-15 Perforation
2018-06-15 Performed Stage 5 of Stimulation
2018-06-15 Performed Stage 6 of Stimulation
2018-06-15 Performed Stage 7 of Stimulation
2018-06-15 Performed Stage 8 of Stimulation
2018-06-15 Performed Stage 9 of Stimulation
2018-06-16 Perforation
2018-06-16 Performed Stage 10 of Stimulation
2018-06-16 Performed Stage 11 of Stimulation
2018-06-18 Perforation
2018-06-18 Performed Stage 12 of Stimulation
2018-06-18 Performed Stage 13 of Stimulation
2018-06-18 Performed Stage 14 of Stimulation
2018-06-18 Performed Stage 15 of Stimulation
2018-06-19 Perforation
2018-06-19 Performed Stage 16 of Stimulation
2018-06-19 Performed Stage 17 of Stimulation
2018-06-19 Performed Stage 18 of Stimulation
2018-06-19 Performed Stage 19 of Stimulation
2018-06-19 Performed Stage 20 of Stimulation
2018-06-19 Performed Stage 21 of Stimulation
2018-06-20 Perforation
2018-06-20 Performed Stage 22 of Stimulation
2018-06-20 Performed Stage 23 of Stimulation
2018-06-20 Performed Stage 24 of Stimulation
2018-06-20 Performed Stage 25 of Stimulation
2018-06-20 Performed Stage 26 of Stimulation
2018-06-20 Performed Stage 27 of Stimulation
2018-06-21 Perforation
2018-06-21 Performed Stage 28 of Stimulation
2018-06-21 Performed Stage 29 of Stimulation
2020-02-19 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-06-14 2018-06-21 5,504 11,788,400 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 BIOC12031A Nalco Biocide Listed Below Listed Below 0 0 0
TRS 805X Tight Rock Solutions Friction Reducer Listed Below Listed Below 0 0 0
Unihib G Geosafe Corrosion Inhibitor Listed Below Listed Below 0 0 0
TRS 3001 Tight Rock Solutions Scale Control Listed Below Listed Below 0 0 0
Hydrotreated Light Distillate Not Assigned 30 0.0107364 12175.2
Glutaraldehyde 111-30-8 30 0.00546708 6199.77
Oxyalkylated alcohol Not Assigned 5 0.00178939 2029.2
Sodium Phosphate, Tribasic 7601-54-9 5 0.000940575 1066.63
Inorganic Salt Not Assigned 10 0.00357879 4058.41
Ethylene Glycol 107-21-1 5 0.000940575 1066.63
Silica Substrate 14808-60-7 100 10.9827 12,454,600.0
Alcohol Alkoxylates Not Assigned 5 0.00360882 4092.46
Alcohols C10-16, ethoxylated 0068002-97-1 50 0.000475635 539.379
Methanol 0000067-56-1 5 0.00004756 53.938
Hydrochloric Acid 7647-01-0 7.5 0.159187 180521
Butyl digycol 0000112-34-5 75 0.000713453 809.069
Ammonium persulfate 7727-54-0 100 0.000511456 580
Amine Triphosphate Not Assigned 30 0.00564345 6399.77
Thiourea 0000062-56-6 1 0.00000951 10.788
Aliphatic Hydrocarbon Not Assigned 30 0.0216529 24554.8
Substituted alkylamine Not Assigned 1 0.000357879 405.841
Formaldehyde 0000050-00-0 1 0.00000951 10.788
AP Breaker Lubrizol Breaker Listed Below Listed Below 0 0 0
TRS 17888 Tight Rock Solutions Friction Reducer Listed Below Listed Below 0 0 0
Hydrochloric Acid (7.5%) PVS Acidizing Listed Below Listed Below 0 0 0
Sand (Proppant) Sargent/Momentive/Prefferred Proppant Listed Below Listed Below 0 0 0
Water PennEnergy Resources Carrier/Base Fluid Water 7732-18-5 100 86.7483 98,374,100.0
Other Chemical(s) Listed Above See Trade Name(s) List Water 7732-18-5 92.5 1.96331 2,226,430.0

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2018-06-14 1 Sand 5,000,000 6,809 4,870
2018-06-14 2 Sand 5,000,000 6,557 6,272
2018-06-14 3 Sand 5,000,000 6,863 6,587
2018-06-14 4 Sand 5,000,000 6,941 6,989
2018-06-15 5 Sand 5,000,000 6,527 6,792
2018-06-15 6 Sand 5,000,000 6,635 6,315
2018-06-15 7 Sand 5,000,000 6,138 5,863
2018-06-15 8 Sand 5,000,000 6,486 5,500
2018-06-15 9 Sand 5,000,000 6,569 5,710
2018-06-16 10 Sand 5,000,000 6,597 6,626
2018-06-16 11 Sand 5,000,000 6,151 5,529
2018-06-18 12 Sand 5,000,000 6,629 6,155
2018-06-18 13 Sand 5,000,000 6,406 6,238
2018-06-18 14 Sand 5,000,000 6,414 5,831
2018-06-18 15 Sand 5,000,000 8,098 4,498
2018-06-19 16 Sand 5,000,000 6,115 5,366
2018-06-19 17 Sand 5,000,000 6,180 6,708
2018-06-19 18 Sand 5,000,000 6,015 5,864
2018-06-19 19 Sand 5,000,000 6,031 6,114
2018-06-19 20 Sand 5,000,000 6,198 6,133
2018-06-19 21 Sand 5,000,000 6,025 5,054
2018-06-20 22 Sand 5,000,000 6,094 5,040
2018-06-20 23 Sand 5,000,000 5,933 6,159
2018-06-20 24 Sand 5,000,000 6,112 6,465
2018-06-20 25 Sand 5,000,000 5,797 5,589
2018-06-20 26 Sand 5,000,000 5,898 5,432
2018-06-20 27 Sand 5,000,000 6,072 5,950
2018-06-21 28 Sand 5,000,000 5,832 5,654
2018-06-21 29 Sand 5,000,000 8,745 6,937

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 PENNENERGY RESOURCES LLC 0.00 0 0.00 0 0.00 0
2018 PENNENERGY RESOURCES LLC 391,951.00 102 0.00 0 1,101.00 102
2019 PENNENERGY RESOURCES LLC 783,687.00 354 0.00 0 985.00 354

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 PENNENERGY RESOURCES LLC Drilling Fluid Waste 100.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2017 PENNENERGY RESOURCES LLC Drilling Fluid Waste 54.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2017 PENNENERGY RESOURCES LLC Produced Fluid 1,600.00 Bbl INJECTION DISPOSAL WELL 34-155-21893
2017 PENNENERGY RESOURCES LLC Produced Fluid 4,883.73 Bbl REUSE (AT WELL PAD)
2017 PENNENERGY RESOURCES LLC Produced Fluid 320.00 Bbl INJECTION DISPOSAL WELL 34-155-22403
2017 PENNENERGY RESOURCES LLC Drill Cuttings 221.18 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2017 PENNENERGY RESOURCES LLC Produced Fluid 640.00 Bbl INJECTION DISPOSAL WELL 34-155-23795
2018 PENNENERGY RESOURCES LLC Drill Cuttings 431.17 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Other Oil & Gas Wastes 13.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 PENNENERGY RESOURCES LLC Filter Socks 0.33 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2018 PENNENERGY RESOURCES LLC Produced Fluid 6,537.31 Bbl REUSE (AT WELL PAD)
2018 PENNENERGY RESOURCES LLC Produced Fluid 2.64 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste 108.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2018 PENNENERGY RESOURCES LLC Soil Contaminated by Oil & Gas Related Spills 28.71 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Produced Fluid 40.00 Bbl INJECTION DISPOSAL WELL 34-155-21893
2018 PENNENERGY RESOURCES LLC Produced Fluid 1,080.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste 275.83 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 PENNENERGY RESOURCES LLC Produced Fluid 29.95 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Produced Fluid 1,320.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 PENNENERGY RESOURCES LLC Other Oil & Gas Wastes 125.50 Bbl INJECTION DISPOSAL WELL 34-155-23223
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste 87.27 Bbl REUSE (AT WELL PAD)
2018 PENNENERGY RESOURCES LLC Servicing Fluid 12.22 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Soil Contaminated by Oil 28.71 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2019 PENNENERGY RESOURCES LLC Produced Fluid 162.06 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 PENNENERGY RESOURCES LLC Produced Fluid 49.67 Bbl INJECTION DISPOSAL WELL 34-155-21893
2019 PENNENERGY RESOURCES LLC Produced Fluid 1,327.48 Bbl INJECTION DISPOSAL WELL 34-155-23223
2019 PENNENERGY RESOURCES LLC Produced Fluid 14,565.16 Bbl REUSE (AT WELL PAD)
2019 PENNENERGY RESOURCES LLC Synthetic Liner Materials 2.42 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2019 PENNENERGY RESOURCES LLC Produced Fluid 1,679.05 Bbl INJECTION DISPOSAL WELL 34-155-23196
2019 PENNENERGY RESOURCES LLC Produced Fluid 130.34 Bbl INJECTION DISPOSAL WELL 34-155-23795
2019 PENNENERGY RESOURCES LLC Produced Fluid 31.00 Bbl INJECTION DISPOSAL WELL 34-155-22403
2019 PENNENERGY RESOURCES LLC Waste Water Treatment Sludge 5.32 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2653494 Primary Facility 2017-10-26 Drilling/Alteration No Violations Noted At the time of inspection, Highlands rig 9 was onsite tripping drill pipe out of the well. Surface casing (11 3/4") was cemented using 370 sxs Class H (81 bbls), 2% CaCk2, 2% Gypsum, 5% salt, 15.8 ppg, 1.22 yield. Plug landed, but did not get cement returns. DEP contacted. Top of cement at 37' down. Floats held, using a float collar and float shoe. 8 centralizers were used. Casing was topped off with 120 sxs (26 bbls) of the same cement. Chemicals all within double containment with berms. Fuel in high-berm containment. 8 5/8" intermediate casing on pipe racks. Drilling was done on mist. Water was encountered in this amount:

95 bbls/hr @ 1300' 131 bbls/hr @ 1500' 130 bbls/hr @ 1800' 90 bbls/hr @ 1950' 121 bbls/hr @ 2100' 145 bbls/hr @ 2250'

2658112 Primary Facility 2017-11-01 Routine/Partial Inspection No Violations Noted At the time of inspection, Highlands rig 9 has been skid to the 6H well. This well had intermediate casing cemented using 685 sxs Class H (146 bbls), 2% Gypsum, 5% salt, 15.8 ppg, 1.2 yield. Displacement was 155 bbls freshwater and plug was bumped. Floats held. 25 bbls cement returns. A float shoe and float collar were used, as well as 32 centralizers.
2666980 Primary Facility 2017-12-04 Routine/Partial Inspection No Violations Noted On site for a routine partial inspection.

Permitted wells spudded. Wells fenced with a cattle gate and steel plate covering holes. No production equipment set. Temporary storage tanks installed. Pad liner installed & intact.

Well pad is fenced. Site ID sign in place. Well and ESCGP2 permits on site. Well development impoundment completed, fenced, &liner installed. All E/S controls &BMPs installed, in place, intact, and functioning. Site has good vegetation growth.

2684493 Primary Facility 2018-01-22 Administrative/File Review No Violations Noted
2686274 Primary Facility 2018-01-25 Administrative/File Review No Violations Noted
2687370 Primary Facility 2018-01-25 Drilling/Alteration No Violations Noted At the time of inspection, Halliburton was onsite hooking up to cement. BOP was tested on 1/19. Production casing had a float shoe and float collar installed along with 276 centralizers. Containment appeared good and all chemicals within.

Cement info was sent and they had used a lead 1 of 260 sxs HalCem (52 bbls), 14.5 ppg, 1.132 yield, a lead 2 of 680 sxs ShaleCem (137 bbls), 14.5 ppg, 1.135 yield, and tail of 600 sxs SoluCem(194 bbls), 15.2 ppg, 1.819 yield. Displacement was 10 bbl KCl followed by 225 bbls freshwater. Plug was bumped to 3500 psi and floats held. Top of cement calculated to be at 4821'. A float shoe and collar were used along with 276 centralizers.

2703845 Primary Facility 2018-03-12 Administrative/File Review No Violations Noted
2721357 Primary Facility 2018-04-23 Administrative/File Review No Violations Noted
2740953 Primary Facility 2018-06-13 Administrative/File Review No Violations Noted
2786592 Primary Facility 2018-10-10 Administrative/File Review No Violations Noted
2814867 Primary Facility 2018-12-13 Routine/Partial Inspection No Violations Noted On 12/13/2018, WQS Brian MacQuarrie onsite. Contractors onsite filling cellars with gravel to surface. Site consists of six wells completed; 1H-019-22649, 2H-019-22511, 3H-019-22650, 4H-019-22651, 5H-019-22652 and 6H-019-22653. Tank battery consists of three 400 bbl tanks installed within stainless steel containment structure. Large AST onsite containing impaired water. Five 500 bbl frac tanks (empty) staged onsite. Freshwater impoundment lined and fenced in. Erosion and Sedimentation BMPs installed and maintained. Vegetative growth well established in previously disturbed areas.
2836140 Primary Facility 2019-02-05 Routine/Partial Inspection No Violations Noted On 2/5/2019, WQS Brian MacQuarrie onsite. Six wells in production, 1H (019-22649), 2H (019-22511), 3H (019-22650), 4H (019-22651), 5H (019-22652) and 6H (019-22653). Tank battery consists of three 400 bbl tanks installed within secondary containment structure. One large AST onsite. Five frac tanks staged onsite. Freshwater impoundment fenced in and locked. Erosion and Sedimentation BMPs installed and maintained. Previously disturbed areas vegetated.

For data sources see[9]