X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-019-22656

Well Details

Well ID: 37-019-22656
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Jefferson Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: 154359
Farm/Lease Name: PER W71 2H
License Status:
Spud Date: 2018-02-07
Permit Date: 2017-10-24
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.747342
Longitude: -79.837528

For data sources see[1][2][3]

Well History

Date Event
Deviated
2017-10-24 New Permit Application
2018-02-07 Performed Spud Operation
2018-11-15 MOD
2019-04-25 Drilling Completion

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 PENNENERGY RESOURCES LLC 489,409.00 98 0.00 0 0.00 31

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 PENNENERGY RESOURCES LLC Produced Fluid 492.70 Bbl REUSE (AT WELL PAD)
2018 PENNENERGY RESOURCES LLC Drill Cuttings 317.29 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste 51.67 Bbl REUSE (AT WELL PAD)
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste 20.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste 26.67 Bbl INJECTION DISPOSAL WELL 34-155-23223
2019 PENNENERGY RESOURCES LLC Drilling Fluid Waste 693.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2019 PENNENERGY RESOURCES LLC Drill Cuttings 765.46 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2019 PENNENERGY RESOURCES LLC Filter Socks 1.86 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 PENNENERGY RESOURCES LLC Produced Fluid 219.18 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 PENNENERGY RESOURCES LLC Produced Fluid 79.17 Bbl INJECTION DISPOSAL WELL 34-155-22403
2019 PENNENERGY RESOURCES LLC Produced Fluid 516.65 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 PENNENERGY RESOURCES LLC Produced Fluid 16,648.17 Bbl REUSE (AT WELL PAD)
2019 PENNENERGY RESOURCES LLC Produced Fluid 20.00 Bbl INJECTION DISPOSAL WELL 34-155-23795
2019 PENNENERGY RESOURCES LLC Produced Fluid 9,804.03 Bbl INJECTION DISPOSAL WELL 34-099-23158
2019 PENNENERGY RESOURCES LLC Produced Fluid 49.99 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 PENNENERGY RESOURCES LLC Servicing Fluid 15.53 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2019 PENNENERGY RESOURCES LLC Drilling Fluid Waste 480.00 Bbl INJECTION DISPOSAL WELL 34-155-23223

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2691830 Primary Facility 2018-02-07 Administrative/File Review No Violations Noted
2695478 Primary Facility 2018-02-12 Routine/Partial Inspection No Violations Noted At the time of inspection, a welder was onsite welding well plates with well numbers on to each well. 16" conductor pipe has been cemented in and are 40' in depth. Cellar is also cemented in. Pad was snow covered. Well was covered with a steel plate and a cattle fence was surrounding. There is still construction activity just off of the pad, along the lease road.
2706902 Primary Facility 2018-03-19 Routine/Partial Inspection No Violations Noted On 3/19/2018, WQS Brian MacQuarrie onsite. Site sign installed and maintained at entrance. Site constructed with exception to freshwater impoundment. Erosion and Sedimentation best management practices installed. Site temporarily stabilized with seed and mulch. Drilling commenced at six locations on the well pad ( 1H-Permit No. 37-019-22632, 2H- Permit No. 37-019-22656, 3H- Permit No. 37-019-22657, 4H- Permit No. 37-019-22658, 5H- Permit No. 37-019-22659 and 6H-Permit No. 37-019-22660. Steel plates and cages installed at each location.
2734681 Primary Facility 2018-05-29 Administrative/File Review No Violations Noted
2736002 Primary Facility 2018-05-30 Drilling/Alteration No Violations Noted At the time of inspection, C & J was onsite cementing intermediate string for well. Surface casing was cemented using 315 sxs Class A (67 bbls), 1% CaCl2, 1% Gypsum, 15.8 ppg, 1.2 yield. This was displaced with 64 bbls water. Plug was bumped and floats held. 12 bbls cement returned to surface. The intermediate casing was cemented using 770 sxs Class A (163 bbls), 0.5% CaCl2, 1% Gypsum, 15.8 ppg, 1.19 yield. This was displaced with 169 bbls water. Plug was bumped and floats held. 40 bbls cement returned to surface.

Job went well and containment was in good condition.

2763609 Primary Facility 2018-08-14 Routine/Partial Inspection No Violations Noted On 8/14/2018, WQS Brian MacQuarrie onsite. Site sign installed at entrance . Erosion and Sedimentation plan onsite. Freshwater impoundment excavated and fenced in not lined. Two infiltration basins installed. The well pad consists of six wells partially drilled Permit Nos. 019-22632, 019-22656, 019-22657, 019-22658, 019-22659 and 019-22660. Containment liner setup around wells. Five frac tanks staged within containment. No activity onsite.