If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-019-22659 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.747344,"lon":-79.837311,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Butler | |
Municipality: Jefferson Township | |
Operator Name: PENNENERGY RESOURCES LLC | |
Well Pad ID: 154359 | |
Farm/Lease Name: PER W71 5H | |
License Status: | |
Spud Date: 2018-02-08 | |
Permit Date: 2017-10-24 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.747344 | |
Longitude: -79.837311 |
Date | Event |
---|---|
Deviated | |
2017-10-24 | New Permit Application |
2018-02-08 | Performed Spud Operation |
2018-11-30 | MOD |
2019-03-30 | Drilling Completion |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2019 | PENNENERGY RESOURCES LLC | 463,949.00 | 97 | 0.00 | 0 | 0.00 | 31 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2018 | PENNENERGY RESOURCES LLC | Produced Fluid | 492.70 Bbl | REUSE (AT WELL PAD) | |
2018 | PENNENERGY RESOURCES LLC | Drill Cuttings | 329.72 Tons | RESIDUAL WASTE PROCESSING FACILITY | PAD085690592 |
2018 | PENNENERGY RESOURCES LLC | Drilling Fluid Waste | 51.67 Bbl | REUSE (AT WELL PAD) | |
2018 | PENNENERGY RESOURCES LLC | Drilling Fluid Waste | 20.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2018 | PENNENERGY RESOURCES LLC | Drilling Fluid Waste | 26.67 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2019 | PENNENERGY RESOURCES LLC | Drilling Fluid Waste | 747.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2019 | PENNENERGY RESOURCES LLC | Drill Cuttings | 433.73 Tons | RESIDUAL WASTE PROCESSING FACILITY | PAD085690592 |
2019 | PENNENERGY RESOURCES LLC | Filter Socks | 1.86 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 232.03 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 79.17 Bbl | INJECTION DISPOSAL WELL | 34-155-22403 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 546.93 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 19,257.88 Bbl | REUSE (AT WELL PAD) | |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 20.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23795 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 9,796.99 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 50.17 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 180.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2019 | PENNENERGY RESOURCES LLC | Servicing Fluid | 15.26 Tons | RESIDUAL WASTE PROCESSING FACILITY | PAD085690592 |
2019 | PENNENERGY RESOURCES LLC | Drilling Fluid Waste | 360.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2691833 | Primary Facility | 2018-02-07 | Administrative/File Review | No Violations Noted | |
2695481 | Primary Facility | 2018-02-12 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, a welder was onsite welding well plates with well numbers on to each well. 16" conductor pipe has not been cemented in yet, but pipe is at 40' in depth. Cellar was set. Pad was snow covered. Well was open and awaiting cementers and will be covered afterwards. There is still construction activity just off of the pad, along the lease road. |
2706915 | Primary Facility | 2018-03-19 | Routine/Partial Inspection | No Violations Noted | On 3/19/2018, WQS Brian MacQuarrie onsite. Site sign installed and maintained at entrance. Site constructed with exception to freshwater impoundment. Erosion and Sedimentation best management practices installed. Site temporarily stabilized with seed and mulch. Drilling commenced at six locations on the well pad ( 1H-Permit No. 37-019-22632, 2H- Permit No. 37-019-22656, 3H- Permit No. 37-019-22657, 4H- Permit No. 37-019-22658, 5H- Permit No. 37-019-22659 and 6H-Permit No. 37-019-22660. Steel plates and cages installed at each location. |
2739429 | Primary Facility | 2018-06-11 | Administrative/File Review | No Violations Noted | |
2742036 | Primary Facility | 2018-06-15 | Drilling/Alteration | No Violations Noted | Rig currently running casing. O-Tex onsite for cement job. Plan to suspend drilling activities around 3:00PM due to local high school graduation ceremony. |
2742099 | Primary Facility | 2018-06-12 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, C & J was onsite preparing to cement he surface casing for the well. However, lightning strikes were seen in the distance so operations were shut down for 30 minutes to see what weather was going to do. An email was sent later in the day for the cement job. It was cemented using 315 sxs Class A (67 bbls), 1% CaCl2, 1% Gypsum, 15.8 ppg, 1.2 yield. This was displaced with 64 bbls freshwater and plug was bumped. Floats held. 12 bbls of cement returned to surface. Containment was in good condition before I left the pad and chemicals were all within it. |
2744718 | Primary Facility | 2018-06-20 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, C & J had trucks lined up along the lease road, but operations are shut down. A thunderstorm was going through the area. Intermediate casing had been cemented for the 5H using 770 sxs Class A (163 bbls), 0.5% CaCl2, 1% Gypsum, 15.8 ppg, 1.19 yield. This was displaced with 175 bbls freshwater and plug was bumped. Floats held. 53 bbls of cement returned to surface. |
2763620 | Primary Facility | 2018-08-14 | Routine/Partial Inspection | No Violations Noted | On 8/14/2018, WQS Brian MacQuarrie onsite. Site sign installed at entrance . Erosion and Sedimentation plan onsite. Freshwater impoundment excavated and fenced in not lined. Two infiltration basins installed. The well pad consists of six wells partially drilled Permit Nos. 019-22632, 019-22656, 019-22657, 019-22658, 019-22659 and 019-22660. Containment liner setup around wells. Five frac tanks staged within containment. No activity onsite. |
For data sources see[7]