Well Details

Well ID: 37-033-25449
Loading map...
Country: United States
State: Pennsylvania
County: Clearfield
Municipality: Chest Township
Operator Name: DORSO LP
Well Pad ID:
Farm/Lease Name: K&J H PAGE 2
License Status: ACTIVE
Spud Date:
Permit Date: 2003-10-02
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.730381
Longitude: -78.636153

For data sources see[1][2][3]

Well History

Date Event
2003-10-02 New Permit Application
2003-11-05 Performed Spud Operation
2003-11-21 Perforation
2003-11-24 Drilling Completion
2004-03-16 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2004 DORSO LLC 1428 306 0.00 0 0.00 0
2005 DORSO LLC 56 59 0.00 0 0.00 0
2010 DORSO LP 0.00 0 0.00 0 0.00 0
2011 DORSO LP 318.00 306 0.00 0 0.00 0
2012 DORSO LP 458.00 365 0.00 0 0.00 0
2013 DORSO LP 433.00 365 0.00 0 0.00 0
2014 DORSO LP 423.00 365 0.00 0 0.00 0
2015 DORSO LP 348.00 303 0.00 0 0.00 0
2016 DORSO LP 471.00 304 0.00 0 0.00 0
2017 DORSO LP 153.00 273 0.00 0 0.00 0
2018 DORSO LP 298.00 334 0.00 0 0.00 0
2019 DORSO LP 486.00 335 0.00 0 0.00 0

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1885778 Primary Facility 2010-05-19 Routine/Complete Inspection No Violations Noted According to records, well completed on 11/24/03 to a depth of 3,791 ft. Active permit since 10/2/03. WRAC submitted and approved on 12/5/03. Well head completed with 8¿ pipe reduced to 4¿ and reduced to 2¿ production line with 53shut off valves. Production equipment has been removed from site and well is currently not producing. According to Chad Wagner, the well was shut in during the fall of 2009. No well tag was present. No IW issues during inspection surrounding the site. Slight E&S issues at the site. Site has needs additional restoration activity. Took pictures of the site. Request WQ personnel perform inspection of the site. Talked to Chad Wagner (Dorso) field supervisor about issues and Dorso is planning to plug well this fall of 2010.