If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-033-26201 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.03515,"lon":-78.6547,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Clearfield | |
Municipality: Bloom Township | |
Operator Name: VEC ENERGY LLC | |
Well Pad ID: | |
Farm/Lease Name: LANAGER 5 | |
License Status: ACTIVE | |
Spud Date: | |
Permit Date: 2006-12-13 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.035150 | |
Longitude: -78.6547 |
Date | Event |
---|---|
2006-12-13 | New Permit Application |
2007-01-23 | Performed Spud Operation |
2007-01-25 | Drilling Completion |
2007-02-08 | Perforation |
2007-08-31 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2006 | VICTORY ENERGY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2007 | VICTORY ENERGY CORP | 1420.47 | 262 | 0.00 | 0 | 0.00 | 0 |
2008 | VICTORY ENERGY CORP | 1608.85 | 355 | 0.00 | 0 | 0.00 | 0 |
2009 | VICTORY ENERGY CORP | 1781.48 | 353 | 0.00 | 0 | 0.00 | 0 |
2010 | VICTORY ENERGY CORP | 1,800.42 | 350 | 0.00 | 0 | 0.00 | 0 |
2011 | VICTORY ENERGY CORP | 1,568.11 | 360 | 0.00 | 0 | 0.00 | 0 |
2012 | VICTORY ENERGY CORP | 909.25 | 286 | 0.00 | 0 | 0.00 | 0 |
2013 | VICTORY ENERGY CORP | 1,097.70 | 355 | 0.00 | 0 | 0.00 | 0 |
2014 | VICTORY ENERGY CORP | 914.72 | 354 | 0.00 | 0 | 0.00 | 0 |
2015 | VICTORY ENERGY CORP | 739.38 | 242 | 0.00 | 0 | 0.00 | 0 |
2016 | VICTORY ENERGY CORP | 1,593.84 | 357 | 0.00 | 0 | 0.00 | 0 |
2017 | VICTORY ENERGY CORP | 252.00 | 143 | 0.00 | 0 | 0.00 | 0 |
2018 | VEC ENERGY LLC | 289.00 | 322 | 0.00 | 0 | 0.00 | 0 |
2019 | VEC ENERGY LLC | 370.00 | 363 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2008 | VICTORY ENERGY CORP | Brine | 160.00 Bbl | Road Spreading | |
2008 | VICTORY ENERGY CORP | Brine | 200.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0095273 |
2008 | VICTORY ENERGY CORP | Brine | 100.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0095443 |
2009 | VICTORY ENERGY CORP | Brine | 310.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0095443 |
2009 | VICTORY ENERGY CORP | Brine | 500.00 Bbl | Road Spreading | |
2010 | VICTORY ENERGY CORP | Produced Fluid | 400.00 Bbl | Road Spreading | |
2012 | VICTORY ENERGY CORP | Produced Fluid | 200.00 Bbl | Road Spreading |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2571716 | Primary Facility | 2017-03-15 | Routine/Complete Inspection | No Violations Noted | Site inspection of a conventional gas well that is identified in the Department's EFACTS database as having been spudded but not previously inspected by the Department. The Lanager #5 well was spudded on 1/23/2007. The wellhead plumbing and production configuration is essentially identical for the (3) wells on the Lanager lease inspected today.
Well API/Permit # posted on wellhead tag. Production gas is directed via a 2" line off the 4 1/2" production casing string and then sequentially through a standard production fluids separator unit, line drip, and orifice meter/chart recorder to the 2" gathering pipeline riser. A tubing string (~1") is hung inside the production casing string, and a gasoline powered pump jack is rigged to the tubing head for removal of excess downhole fluids. Pump jack unit is mounted on concrete base pads, and spotted inside a cyclone fence enclosure. Tubing fluids discharge is plumbed via 2" piping directly off the tubing head to (2) 100 bbl. poly fluids tanks, that are manif |
For data sources see[7]