X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-035-21253

Well Details

Well ID: 37-035-21253
Loading map...
Country: United States
State: Pennsylvania
County: Clinton
Municipality: Grugan Township
Operator Name: ARD OPR LLC
Well Pad ID: 148058
Farm/Lease Name: COP TRACT 285 G-1040H
License Status:
Spud Date: 2011-05-28
Permit Date: 2011-04-28
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.370267
Longitude: -77.580703

For data sources see[1][2][3]

Well History

Date Event
2011-04-28 New Permit Application
2011-05-24 Performed Spud Operation
2011-09-14 Drilling Completion
2011-11-09 Perforation
2012-10-19 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2011-11-28 2011-11-28 8,016 5,742,804

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Anadarko Carrier/Base Fluid Water 7732-18-5 100.00 88.74
WMTI Poly SI40 AMPA Scale Inhibitor Water 7732-18-5 70.00 0.00
Sand (Proppant) Halliburton Energy Services Proppant Quartz 14808-60-7 100.00 10.43
WG-36 GELLING AGENT Halliburton Energy Services Gelling Agent Guar gum 9000-30-0 100.00 0.00596000
HAI-OS ACID INHIBITOR Halliburton Energy Services Corrosion Inhibitor Methanol 67-56-1 60.00 0.00028000
Propargyl alcohol 107-19-7 10.00 0.00005000
Acid, Hydrochloric (7.5) Halliburton Energy Services Solvent Hydrochloric acid 7647-01-0 7.50 0.04
WMTI Poly CFR40G 1020 Halliburton Energy Services Friction Reducer Cationic water-soluble polymer emulsion 100.00 0.00
SP Halliburton Energy Services Gel Breaker Sodium persulfate 7775-27-1 100.00 0.00038000
WMTI Poly SI40 AMPA Halliburton Energy Services Scale Inhibitor Phosphonic acid 13598-36-2 3.00 0.00
Poly Phosphonate 40.00 0.00
Water 7732-18-5 70.00 0.00
Hydrochloric acid 7647-01-0 17.00 0.00
FDP-S944-09 Halliburton Energy Services Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.01
GBW-30 BREAKER Halliburton Energy Services Gel Breaker Carbohydrates 95.00 0.00
Hemicellulase enzyme 9012-54-8 15.00 0.00
BE-9W Halliburton Energy Services Biocide Tri-n-butyl tetradecyl phosphonium chloride 81741-28-8 10.00 0.00014000
BE-9M Halliburton Energy Services Biocide Methanol 67-56-1 30.00 0.00603000
Tri-n-butyl tetradecyl phosphonium chloride 81741-28-8 10.00 0.00201000
WMTI Poly CS39 Halliburton Energy Services Clay Stabilizer Chloride 16887-00-6 30.00 0.04
Proprietary inorganic chemical 20.00 0.02
Proprietary poly electrolyte 40.00 0.05
Water 7732-18-5 60.00 0.08
LP-65 Halliburton Energy Services Scale Inhibitor Ammonium chloride 12125-02-9 10.00 0.00161000
LGC-36 UC Halliburton Energy Services Liquid Gel Concentrate Naphtha, petroleum, hydrotreated heavy 64742-48-9 60.00 0.00
Guar gum 9000-30-0 60.00 0.00
Acid, Hydrochloric (15) Halliburton Energy Services Solvent Hydrochloric acid 7647-01-0 15.00 0.00
LCA-1 Solvent Halliburton Energy Services Solvent Paraffinic solvent 100.00 0.00

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 ANADARKO E&P ONSHORE LLC 0.00 0 0.00 0 0.00 0
2012 ANADARKO E&P ONSHORE LLC 1,444,142.00 339 0.00 0 0.00 0
2013 ANADARKO E&P ONSHORE LLC 792,877.00 329 0.00 0 0.00 0
2014 ANADARKO E&P ONSHORE LLC 686,294.00 294 0.00 0 0.00 0
2015 ANADARKO E&P ONSHORE LLC 654,089.00 362 0.00 0 0.00 0
2016 ANADARKO E&P ONSHORE LLC 510,861.00 366 0.00 0 0.00 0
2017 ARD OPR LLC 426,267.66 365 0.00 0 0.00 0
2018 ARD OPR LLC 372,936.07 365 0.00 0 0.00 0
2019 ARD OPR LLC 330,010.66 338 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 ANADARKO E&P ONSHORE LLC Drill Cuttings 157.45 Tons LANDFILL 100955
2011 ANADARKO E&P ONSHORE LLC Drill Cuttings 1,066.22 Tons LANDFILL 06-08438
2012 ANADARKO E&P ONSHORE LLC Produced Fluid 2,195.12 Bbl REUSE OTHER THAN ROAD SPREADING
2013 ANADARKO E&P ONSHORE LLC Produced Fluid 1,678.69 Bbl REUSE OTHER THAN ROAD SPREADING
2014 ANADARKO E&P ONSHORE LLC Produced Fluid 989.24 Bbl REUSE OTHER THAN ROAD SPREADING
2015 ANADARKO E&P ONSHORE LLC Produced Fluid 124.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 ANADARKO E&P ONSHORE LLC Produced Fluid 250.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2015 ANADARKO E&P ONSHORE LLC Produced Fluid 368.76 Bbl REUSE OTHER THAN ROAD SPREADING
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 53.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 222.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW005
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 56.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 169.30 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2016 ANADARKO E&P ONSHORE LLC Produced Fluid 64.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2017 ANADARKO E&P ONSHORE LLC Produced Fluid 216.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 ANADARKO E&P ONSHORE LLC Produced Fluid 104.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 ARD OPR LLC Produced Fluid 36.56 Bbl REUSE (AT WELL PAD)
2018 ARD OPR LLC Produced Fluid 158.97 Bbl REUSE (AT WELL PAD)
2019 ARD OPR LLC Produced Fluid 35.52 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 ARD OPR LLC Produced Fluid 166.75 Bbl REUSE (AT WELL PAD)
2019 ARD OPR LLC Other Oil & Gas Wastes 56.95 Bbl REUSE (AT WELL PAD)
2019 ARD OPR LLC Other Oil & Gas Wastes 18.84 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1998193 Primary Facility 2011-08-24 Routine/Partial Inspection No Violations Noted
2037998 Primary Facility 2012-01-03 Routine/Complete Inspection No Violations Noted
2040581 Primary Facility 2012-01-06 Routine/Complete Inspection No Violations Noted
2045938 Primary Facility 2012-02-28 Routine/Complete Inspection No Violations Noted
2046384 Primary Facility 2012-02-01 Routine/Complete Inspection No Violations Noted
2062117 Primary Facility 2012-03-15 Routine/Complete Inspection No Violations Noted
2075736 Primary Facility 2012-06-11 Drilling/Alteration No Violations Noted
2105484 Primary Facility 2012-09-19 Routine/Complete Inspection No Violations Noted
2190508 Primary Facility 2013-08-08 Routine/Complete Inspection No Violations Noted
2549272 Primary Facility 2016-12-29 Routine/Complete Inspection No Violations Noted
2696798 Primary Facility 2018-02-13 Routine/Complete Inspection No Violations Noted The weather is 36 Deg. F and sunny at time of inspection. Routine inspection of Alta Resources, LLC., C.O.P. TRACT 285G Pad, Well #1040H, on February 13, 2018.

There are 4 producing wells on this pad. Both annulus vents are closed and not vented at time of inspection. Production by intermediate (5-1/2¿ X 9-5/8¿) annulus vent is shut in to pressure monitor, with pressure reading ¿ 0 PSI, production casing annulus vent is also shut in to pressure monitor, with pressure reading - 273 PSI. The production xmas tree top pressure on the 2-3/8¿ tubing is 166 PSI. 0% combustible gas was detected at the annulus or in the area immediately surrounding the well. No obvious concerns or violations are noted at time of inspection. Wellsite looks neat and well organized. DEP Representative - Ulyana Trynovich, Oil and Gas Inspector.

2807842 Primary Facility 2018-11-28 Routine/Complete Inspection No Violations Noted On November 28, 2018, Department representative Brad Kline conducted a routine site inspection at ARD Operating , LLC. COP Tract 285 Pad G. The site could not be evaluated due to the snow cover.

There are a total of 4 producing wells located on this well pad. All wells are tagged with API/well permit numbers. No bubbling within the cellars was observed. There are 4 GPU’s and 4 steel vertical production fluids tanks onsite. Both GPUs and production fluid tanks were stationed in secondary containment. The secondary containment for the GPU units water level was almost over topping(Photo 3). The Department recommends vacuuming the containment out when weather permits. The liner in the secondary containment for the production fluid tanks had holes in it (Photo 4). The Department recommends replacing the liner.

No violations noted.

For data sources see[8]

References