If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-051-24536 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.929283,"lon":-79.908733,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Fayette | |
Municipality: Luzerne Township | |
Operator Name: CHEVRON APPALACHIA LLC | |
Well Pad ID: 145470 | |
Farm/Lease Name: HALL-HOGSETT UNIT 15H | |
License Status: | |
Spud Date: | |
Permit Date: 2013-01-16 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 39.929283 | |
Longitude: -79.908733 |
Date | Event |
---|---|
2013-01-16 | New Permit Application |
2013-05-15 | Performed Spud Operation |
2013-12-31 | Drilling Completion |
2014-10-03 | Perforation |
2014-10-03 | Performed Stimulation |
2016-04-12 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-10-03 | 2014-10-09 | 8,134 | 4,438,980 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | B466 | Schlumberger | Friction Reducer | Distillates (petroleum), hydrotreated light | 64742-47-8 | 30 | 0.00354238 | 0 |
Ammonium Acetate | 631-61-8 | 6 | 0.00070848 | 0 | ||||
Alcohol Ethoxylates | Proprietary | 5 | 0.0005904 | 0 | ||||
A264 | Schlumberger | Corrosion Inhibitor | Aliphatic alcohols, ethoxylayed #1 | Proprietary | 30 | 0.00003307 | 0 | |
Aliphatic acids | Proprietary | 30 | 0.00003307 | 0 | ||||
Prop-2-yn-1-ol | 107-19-7 | 10 | 0.00001102 | 0 | ||||
Methanol | 67-56-1 | 40 | 0.00004410 | 0 | ||||
Base Fluid | Chevron | Carrier/Base Fluid | Water (Including Mix Water Supplied by Client) | 7732-18-5 | 100 | 90.5433 | 0 | |
L058 | Schlumberger | Iron Stabilizer | Sodium erythorbate | 6381-77-7 | 100 | 0.00035145 | 0 | |
J134 | Schlumberger | Gel Breaker | Hemicellulase enzyme | 9012-54-8 | 100 | 0.00099298 | 0 | |
Proppant | Schlumberger | Proppant | Crystalline Silica | 14808-60-7 | 100 | 9.29064 | 0 | |
EC6116A | Nalco | Biocide | 2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30 | 0.00075611 | 0 | |
Polyethylene Glycol | 25322-68-3 | 60 | 0.00151223 | 0 | ||||
Dibromoacetonitrile | 3252-43-5 | 5 | 0.00012602 | 0 | ||||
EC6673W | Nalco | Iron Control | Ethylene Glycol | 107-21-1 | 30 | 0.00076264 | 0 | |
EC6486A | Nalco | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 30 | 0.00080438 | 0 | |
15% Acid | Schlumberger | Perf Cleanup | Hydrocloric Acid | 7647-01-0 | 15 | 0.0097367 | 0 | |
J580 | Schlumberger | Gelling Agent, Water | Carbohydrate Polymer | Proprietary | 100 | 0.0224187 | 0 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2014-10-03 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2013 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | CHEVRON APPALACHIA LLC | 1,441,412.00 | 343 | 0.00 | 0 | 0.00 | 0 |
2016 | CHEVRON APPALACHIA LLC | 935,742.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CHEVRON APPALACHIA LLC | 714,071.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CHEVRON APPALACHIA LLC | 581,089.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CHEVRON APPALACHIA LLC | 492,291.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 790.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHEVRON APPALACHIA LLC | Drill Cuttings | 901.24 Tons | LANDFILL | 100172 |
2013 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 1,170.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2014 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 1,238.75 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2014 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 35.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 3,355.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHEVRON APPALACHIA LLC | Drill Cuttings | 5.55 Tons | LANDFILL | 100172 |
2014 | CHEVRON APPALACHIA LLC | Drill Cuttings | 20.10 Tons | LANDFILL | 100592 |
2015 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 37.41 Tons | LANDFILL | 100172 |
2015 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 150.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHEVRON APPALACHIA LLC | Produced Fluid | 15.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2015 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 4.37 Tons | LANDFILL | 100592 |
2015 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 4,570.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2015 | CHEVRON APPALACHIA LLC | Produced Fluid | 4,897.50 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHEVRON APPALACHIA LLC | Produced Fluid | 793.29 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,254.76 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 4,973.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 193.99 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 515.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 480.66 Bbl | REUSE (AT WELL PAD) | |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 38.33 Bbl | INJECTION DISPOSAL WELL | 34-119-28776 |
2017 | CHEVRON APPALACHIA LLC | Produced Fluid | 5.57 Bbl | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 389.00 Bbl | REUSE (AT WELL PAD) | |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 36.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 508.34 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | CHEVRON APPALACHIA LLC | Produced Fluid | 38.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | CHEVRON APPALACHIA LLC | Other Oil & Gas Wastes | 310.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | CHEVRON APPALACHIA LLC | Produced Fluid | 40.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | CHEVRON APPALACHIA LLC | Produced Fluid | 2.56 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2019 | CHEVRON APPALACHIA LLC | Other Oil & Gas Wastes | 59.05 Bbl | REUSE (AT WELL PAD) | |
2019 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,030.00 Bbl | REUSE (AT WELL PAD) | |
2019 | CHEVRON APPALACHIA LLC | Produced Fluid | 40.00 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2156747 | Primary Facility | 2013-04-10 | Routine/Complete Inspection | No Violations Noted | Pre-op inspection of 12, 14, 15H sites. All permiter E&S in place. |
2157172 | Primary Facility | 2013-04-16 | Administrative/File Review | No Violations Noted | OG-71 approval review. |
2170012 | Primary Facility | 2013-05-20 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, ROCKY MOUNTAIN DRILLING 24" CONDUCTOR PIPE ENCOUNTERING F/W CAUSING SIDES TO START CAVING IN ON THE DRILL. PLANNING TO REMOVE WATER BY DISPACING OF CEMENT FROM BOTTOM TO SURFACE, |
2170019 | Primary Facility | 2013-05-20 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, ROCKY MOUNTAIN MOVED BACK ON 15 - H TO DRILL OUT CEMENT .STILL DEALING WITH F/W ISSUES ABOUT 20' DOWN. PLANNING ANOTHER CEMENT JOB WITH HOTTER CEMENT TODAY. |
2189817 | Primary Facility | 2013-08-07 | Drilling/Alteration | No Violations Noted | Drilling ongoing, site stable, fair vegetative growth, Act 9 sign up. |
2205038 | Primary Facility | 2013-08-05 | Drilling/Alteration | No Violations Noted | Horizontal Marcellus, Highlands # 14 drilling on air @ 383' (TD). Running water protection casing and cementing tonight. |
2205040 | Primary Facility | 2013-08-07 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, HIGHLANDS # 14 DRILLING ON AIR @ 488' (TD). SETTING UP TO INSTALL COAL PROTECTION CASING AND CEMENT TONIGHT. |
2205042 | Primary Facility | 2013-08-12 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, HIGHLANDS # 14 DRILLING ON AIR @ 2188'(TD). RUNNING INTERMEDIATE CASING AND CEMENTING TODAY (8/10/2013). REVIEWING COAL PROTECTION CASING CEMENTING PROCEDURES FOR VIOLATIONS. |
2205044 | Primary Facility | 2013-08-15 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, HIGHLANDS # 14 DRILLING ON AIR @ 7015' TODAY.EXSPECTING (TD) TONIGHT @ 7200'. RUNNING BRIDGE PLUG AND LOADING WELL BORE WITH OIL BASE MUD. CAPPING AND MOVING TO NEXT WELL ON SAME PAD. |
2205055 | Primary Facility | 2013-08-20 | Drilling/Alteration | Pending | HORIZONTAL MARCELLUS, DURING CEMENTING COAL PROTECTION CASING BY DISPLACEMENT. THE OPERATOR FAILED TO CIRCULATED CEMENT TO SURFACE.AS REQUIRED UNDER LOST CIRCULATION 78.83 (LOST CIRCULATION :(a) If cement used to permanently cement the surface or coal protective casing is not circulated to the surface despite pumping a volume of cement equal to or greater than 120% of the calculated annular space, the operator shall determine the top of the cement, notify the Department, and meet one of the following requirements as approved by the Department: |
2218022 | Primary Facility | 2013-10-31 | Routine/Complete Inspection | No Violations Noted | On 10/31/13, I conducted an inspection at the Chevron Appalachia’s Hall-Hogsett 12, 14, 15H Unit OG Wells site in Luzerne Twp., Fayette County. |
2240935 | Primary Facility | 2013-12-24 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | HORIZONTAL MARCELLUS, NEIGHBORS MOVING ON TO WELL TODAY (12/21/2013). |
2240944 | Primary Facility | 2013-12-30 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | HORIZONTAL MARCELLUS, NEIGHBORS DRILLING ON FLUID @ 15129' (TD). RUNNING 51/2" PROD. CASING AND CEMENTING TODAY (12/29/2013). |
2259214 | Primary Facility | 2014-03-06 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, E&S LOOKS GOOD. WAITING ON FRAC CREW TO ARRIVE. CELLARS NEED PUMPED OUT. |
2292182 | Primary Facility | 2014-07-30 | Routine/Complete Inspection | No Violations Noted | On 7/30/2014, the Department performed an inspection of Chevron Appalachia's Hall Hogsett Unit 12H, 13H, 14H, 15H well site in Luzerne Twp., Fayette County. The reason for the inspection was that the operator is requesting an extension to the restoration date for the site. |
2362054 | Primary Facility | 2015-04-13 | Routine/Complete Inspection | No Violations Noted | |
2512968 | Primary Facility | 2016-06-07 | Routine/Complete Inspection | No Violations Noted |
On 06/17/16 at approximately 1000 hours I met with Curtis Small and Nathan Isler at the Hoehn, Howe, Hall Hogsett Unit to discuss third party impacts to their restoration work. Chevron has documented on multiple occasions third party impacts to the site restoration efforts. The purpose of the meeting was to meet with Chevron representatives to witness the damage done to their most recent restoration attempt. Previous damage had been repaired and hydroseeded and the following day a third party that is not the land owner nor had permission to access the land owner’s property impacted the repaired area with an all-terrain/off road type vehicle. After discussions it was decided that Chevron is going to compile and submit a document for the Department’s review demonstrating the multiple attempts to restore and repair the third party impacts that have prevented them from submitting for an NOT. |
2839338 | Primary Facility | 2019-02-13 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production. The well head casing, piping, production set equipment, containment dike and tank battery look ok. |
For data sources see[9]