X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-059-26462

Well Details

Well ID: 37-059-26462
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Richhill Township
Operator Name: CNX GAS CO LLC
Well Pad ID: 151011
Farm/Lease Name: RHL23
License Status: Active
Spud Date: 2014-08-07
Permit Date: 2014-05-01
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 39.891092
Longitude: -80.501847

For data sources see[1][2][3]

Well History

Date Event
2014-05-01 New Permit Application
2014-07-29 Performed Spud Operation
2014-12-09 Drilling Completion
2015-07-01 Perforation
2015-07-01 Performed Stimulation
2015-07-03 Performed Stage 1 of Stimulation
2015-07-04 Perforation
2015-07-04 Performed Stage 2 of Stimulation
2015-07-05 Perforation
2015-07-05 Performed Stage 3 of Stimulation
2015-07-05 Performed Stage 4 of Stimulation
2015-07-06 Perforation
2015-07-06 Performed Stage 5 of Stimulation
2015-07-06 Performed Stage 6 of Stimulation
2015-07-06 Performed Stage 7 of Stimulation
2015-07-07 Perforation
2015-07-07 Performed Stage 8 of Stimulation
2015-07-07 Performed Stage 9 of Stimulation
2015-07-08 Perforation
2015-07-08 Performed Stage 10 of Stimulation
2015-07-08 Performed Stage 11 of Stimulation
2015-07-09 Perforation
2015-07-09 Performed Stage 12 of Stimulation
2015-07-09 Performed Stage 13 of Stimulation
2015-07-10 Perforation
2015-07-10 Performed Stage 14 of Stimulation
2015-07-10 Performed Stage 15 of Stimulation
2015-07-11 Perforation
2015-07-11 Performed Stage 16 of Stimulation
2015-07-11 Performed Stage 17 of Stimulation
2015-07-12 Perforation
2015-07-12 Performed Stage 18 of Stimulation
2015-07-12 Performed Stage 19 of Stimulation
2015-07-13 Perforation
2015-07-13 Performed Stage 20 of Stimulation
2015-07-13 Performed Stage 21 of Stimulation
2015-07-14 Perforation
2015-07-14 Performed Stage 22 of Stimulation
2015-07-14 Performed Stage 23 of Stimulation
2015-07-14 Performed Stage 24 of Stimulation
2015-07-15 Perforation
2015-07-15 Performed Stage 25 of Stimulation
2015-07-15 Performed Stage 26 of Stimulation
2015-07-15 Performed Stage 27 of Stimulation
2015-07-16 Perforation
2015-07-16 Performed Stage 27 of Stimulation
2015-07-16 Performed Stage 28 of Stimulation
2015-07-16 Performed Stage 29 of Stimulation
2015-07-17 Perforation
2015-07-17 Performed Stage 30 of Stimulation
2015-07-17 Performed Stage 31 of Stimulation
2015-07-18 Perforation
2015-07-18 Performed Stage 32 of Stimulation
2015-07-18 Performed Stage 33 of Stimulation
2015-07-19 Performed Stage 33 of Stimulation
2015-07-20 Performed Stage 33 of Stimulation
2015-07-27 Perforation
2015-07-27 Performed Stage 34 of Stimulation
2015-07-27 Performed Stage 35 of Stimulation
2015-07-27 Performed Stage 36 of Stimulation
2015-07-28 Perforation
2015-07-28 Performed Stage 37 of Stimulation
2015-07-28 Performed Stage 38 of Stimulation
2015-07-28 Performed Stage 39 of Stimulation
2015-07-29 Perforation
2015-07-29 Performed Stage 40 of Stimulation
2015-07-30 Perforation
2015-07-30 Performed Stage 40 of Stimulation
2015-07-31 Perforation
2015-07-31 Performed Stage 41 of Stimulation
2015-07-31 Performed Stage 42 of Stimulation
2015-07-31 Performed Stage 43 of Stimulation
2015-08-01 Perforation
2015-08-01 Performed Stage 44 of Stimulation
2015-08-01 Performed Stage 45 of Stimulation
2015-08-01 Performed Stage 46 of Stimulation
2015-08-02 Perforation
2015-08-02 Performed Stage 47 of Stimulation
2015-08-02 Performed Stage 48 of Stimulation
2015-08-02 Performed Stage 49 of Stimulation
2015-08-03 Perforation
2015-08-03 Performed Stage 50 of Stimulation
2015-08-03 Performed Stage 51 of Stimulation
2016-07-11 Perforation
2018-09-18 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-07-03 2015-08-03 7,202 25,678,900 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1
FE-1A ACIDIZING COMPOSITION, FR-66,
HAI-OS ACID INHIBITOR,
LOSURF-300D, SAND-COMMON
WHITE-100 MESH, SSA-2,
100 LB SACK (100002158),
SAND-PREMIUM WHITE-40/70, BULK, SP BREAKER, WG-36 GELLING AGENT
Halliburton Additive, Breaker, Corrosion Inhibitor, Friction Reducer, Gelling Agent, Non-ionic Surfactant, Proppant NA NA 0 0 0
Fresh Water Operator Base Fluid Fresh Water 7732-18-5 100 88.7067 213,905,000.0
3rd Party Biocide, 3rd Party Scale Inh XCHEM Biocide, Scale Inhibitor NA NA 0 0 0
HYDROCHLORIC ACID Halliburton Base Fluid NA 7647-01-0 15 0.0902896 217722
Hazardous and Non-Hazardous Ingredients 1,2,4 Trimethylbenzene 95-63-6 1 0.00001057 26
Sodium persulfate 7775-27-1 100 0.00007838 189
Oxyalkylated phenolic resin Confidential 30 0.000422876 1020
Poly(oxy-1,2-ethanediyl), alpha-(4-nonylphenyl)-omega-hydroxy-,
branched
127087-87-0 5 0.00005286 128
Silica gel 112926-00-8 1 0.00006255 151
Propargyl alcohol 107-19-7 10 0.00005224 126
Olefins Confidential 5 0.00006269 152
Surfactant mixture Confidential 1 0.000125107 302
Sorbitan monooleate polyoxyethylene derivative 9005-65-6 1 0.000533673 1287
Water 7732-18-5 100 0.633951 1,528,690.0
Sodium sulfate 7757-82-6 0.1 0.00000008 1
Guar gum 9000-30-0 100 0.00625536 15084
Acetic anhydride 108-24-7 100 0.00315094 7599
Alcohols ethoxylated Confidential 5 0.00266837 6435
Naphthalene 91-20-3 5 0.00005286 128
n-Alkyl dimethyl benzyl ammonium chloride 68424-85-1 5.5 0.00196742 4745
Crystalline Silica, Quartz 14808-60-7 0.1 0.00000626 16
Polyphosphonate, ammonium salt Confidential 35 0.00310901 7497
Ethanol 64-17-5 60 0.00206516 4981
Hydrochloric acid 7647-01-0 15 0.0902896 217722
Alcohols, C14-C15, ethoxylated 68951-67-7 30 0.00015672 378
Reaction product of acetophenone,
formaldehyde, thiourea
and oleic acid in dimethyl formamide
68527-49-1 30 0.00015672 378
Polyacrylamide copolymer Confidential 30 0.0160102 38607
Heavy aromatic petroleum naphtha 64742-94-5 30 0.000317157 765
Sorbitan, mono-9-octadecenoate, (Z) 1338-43-8 1 0.000533673 1287
Glutaraldehyde 111-30-8 27 0.00965823 23290
Sodium chloride 7647-14-5 5 0.00266837 6435
Didecyl dimethyl ammonium chloride 7173-51-5 8 0.0028617 6901
Fatty acids, tall oil Confidential 30 0.00015672 378
Amide Confidential 5 0.00266837 6435
Methanol 67-56-1 60 0.00164587 3969
Acetic acid 64-19-7 60 0.00189056 4559
Bentonite, benzyl(hydrogenated
tallow alkyl) dimethylammonium stearate complex
121888-68-4 5 0.000312768 755
Hydrotreated light petroleum distillate 64742-47-8 30 0.0160102 38607
Crystalline silica, quartz 14808-60-7 100 10.5823 25,517,800.0
Ammonium chloride 12125-02-9 5 0.00266837 6435

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2015-07-03 1 25,678,924 8,579 5,929
2015-07-04 2 25,678,924 8,790 6,043
2015-07-05 3 25,678,924 9,430 5,345
2015-07-05 4 25,678,924 8,893 5,656
2015-07-06 5 25,678,924 8,503 5,668
2015-07-06 6 25,678,924 8,465 6,344
2015-07-06 7 25,678,924 8,439 5,945
2015-07-07 8 25,678,924 8,404 5,798
2015-07-07 9 25,678,924 8,652 5,909
2015-07-08 10 25,678,924 8,361 6,388
2015-07-08 11 25,678,924 8,545 5,943
2015-07-09 12 25,678,924 8,156 5,681
2015-07-09 13 25,678,924 8,170 5,902
2015-07-10 14 25,678,924 8,136 5,748
2015-07-10 15 25,678,924 8,051 5,802
2015-07-11 16 25,678,924 8,079 5,438
2015-07-11 17 25,678,924 8,188 5,373
2015-07-12 18 25,678,924 8,303 5,545
2015-07-12 19 25,678,924 8,473 5,485
2015-07-13 20 25,678,924 8,447 5,613
2015-07-13 21 25,678,924 7,808 5,437
2015-07-14 22 25,678,924 7,938 5,555
2015-07-14 23 25,678,924 7,713 5,457
2015-07-14 24 25,678,924 7,769 5,572
2015-07-15 25 25,678,924 8,377 5,460
2015-07-15 26 25,678,924 7,771 6,112
2015-07-15 27 25,678,924 8,323 5,760
2015-07-16 28 25,678,924 7,613 5,569
2015-07-16 29 25,678,924 7,553 5,642
2015-07-17 30 25,678,924 7,602 6,047
2015-07-17 31 25,678,924 7,485 6,047
2015-07-18 32 25,678,924 7,427 6,016
2015-07-18 33 25,678,924 7,607 6,159
2015-07-27 34 25,678,924 7,710 5,890
2015-07-27 35 25,678,924 7,674 6,132
2015-07-27 36 25,678,924 7,995 5,997
2015-07-28 37 25,678,924 7,639 5,805
2015-07-28 38 25,678,924 7,670 5,876
2015-07-28 39 25,678,924 7,463 5,613
2015-07-29 40 25,678,924 8,816 5,513
2015-07-31 41 25,678,924 7,422 5,784
2015-07-31 42 25,678,924 7,575 6,563
2015-07-31 43 25,678,924 7,525 6,168
2015-08-01 44 25,678,924 7,407 5,923
2015-08-01 45 25,678,924 7,401 6,518
2015-08-01 46 25,678,924 7,395 5,752
2015-08-02 47 25,678,924 7,728 6,398
2015-08-02 48 25,678,924 7,262 5,674
2015-08-02 49 25,678,924 7,202 6,327
2015-08-03 50 25,678,924 7,352 6,262
2015-08-03 51 25,678,924 7,352 7,370

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 NOBLE ENERGY INC 0.00 0 0.00 0 0.00 0
2015 NOBLE ENERGY INC 0.00 0 0.00 0 0.00 0
2016 CNX GAS CO LLC 4,379,950.68 366 1.00 31 13.00 153
2017 CNX GAS CO LLC 3,081,877.07 365 0.00 0 14.70 91
2018 CNX GAS CO LLC 2,061,773.38 359 0.00 0 0.11 31
2019 CNX GAS CO LLC 1,324,844.18 361 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 NOBLE ENERGY INC Drill Cuttings 498.57 Tons LANDFILL PAD059087072
2014 NOBLE ENERGY INC Drill Cuttings 23.08 Tons LANDFILL 100172
2014 NOBLE ENERGY INC Drilling Fluid Waste 113.70 Bbl LANDFILL PAD059087072
2014 NOBLE ENERGY INC Drill Cuttings 379.47 Tons LANDFILL 06-08438
2014 NOBLE ENERGY INC Drilling Fluid Waste 709.60 Bbl LANDFILL 301071
2014 NOBLE ENERGY INC Drill Cuttings 554.40 Tons LANDFILL 301071
2015 NOBLE ENERGY INC Fracturing Fluid Waste 49.46 Tons LANDFILL 100172
2015 NOBLE ENERGY INC Fracturing Fluid Waste 183.30 Tons LANDFILL 301071
2015 NOBLE ENERGY INC Fracturing Fluid Waste 4.55 Tons RESIDUAL WASTE TRANSFER FACILITY 301071
2015 NOBLE ENERGY INC Fracturing Fluid Waste 2.40 Tons LANDFILL 100594
2016 NOBLE ENERGY INC Produced Fluid 62,165.13 Bbl REUSE OTHER THAN ROAD SPREADING
2016 NOBLE ENERGY INC Synthetic Liner Materials 2.74 Tons RESIDUAL WASTE TRANSFER FACILITY 301071
2017 CNX GAS CO LLC Produced Fluid 137.18 Bbl INJECTION DISPOSAL WELL 34-119-28780
2017 CNX GAS CO LLC Produced Fluid 1,253.74 Bbl INJECTION DISPOSAL WELL 34-119-28803
2017 CNX GAS CO LLC Produced Fluid 1,792.97 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2017 CNX GAS CO LLC Produced Fluid 10.00 Bbl INJECTION DISPOSAL WELL 34-157-25511
2017 CNX GAS CO LLC Produced Fluid 3,758.90 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017 CNX GAS CO LLC Produced Fluid 15.00 Bbl RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2017 CNX GAS CO LLC Produced Fluid 2,722.65 Bbl REUSE (AT WELL PAD)
2017 CNX GAS CO LLC Waste Water Treatment Sludge 1.15 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2017 CNX GAS CO LLC Produced Fluid 5,979.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-10
2017 CNX GAS CO LLC Produced Fluid 1,562.68 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2017 CNX GAS CO LLC Produced Fluid 1,963.57 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2017 CNX GAS CO LLC Produced Fluid 1,086.40 Bbl SURFACE IMPOUNDMENT 95-7-37312-16
2017 CNX GAS CO LLC Produced Fluid 151.40 Bbl INJECTION DISPOSAL WELL 34-013-20609
2018 CNX GAS CO LLC Other Oil & Gas Wastes 11.10 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-29
2018 CNX GAS CO LLC Produced Fluid 13.50 Bbl RESIDUAL WASTE PROCESSING FACILITY
2018 CNX GAS CO LLC Produced Fluid 0.48 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2018 CNX GAS CO LLC Produced Fluid 771.40 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2018 CNX GAS CO LLC Produced Fluid 1,511.71 Bbl INJECTION DISPOSAL WELL 34-119-28803
2018 CNX GAS CO LLC Other Oil & Gas Wastes 16.00 Bbl RESIDUAL WASTE PROCESSING FACILITY
2018 CNX GAS CO LLC Other Oil & Gas Wastes 4.70 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2018 CNX GAS CO LLC Other Oil & Gas Wastes 9.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2018 CNX GAS CO LLC Produced Fluid 182.46 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 CNX GAS CO LLC Other Oil & Gas Wastes 82.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018 CNX GAS CO LLC Produced Fluid 781.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2018 CNX GAS CO LLC Drilling Fluid Waste 2.30 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018 CNX GAS CO LLC Produced Fluid 8,222.75 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018 CNX GAS CO LLC Produced Fluid 96.60 Bbl INJECTION DISPOSAL WELL 34-119-28780
2018 CNX GAS CO LLC Produced Fluid 525.70 Bbl REUSE (AT WELL PAD)
2018 CNX GAS CO LLC Produced Fluid 2.00 Bbl RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2019 CNX GAS CO LLC Other Oil & Gas Wastes 1.00 Bbl RESIDUAL WASTE PROCESSING FACILITY
2019 CNX GAS CO LLC Produced Fluid 468.90 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2019 CNX GAS CO LLC Produced Fluid 3,215.05 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 CNX GAS CO LLC Produced Fluid 394.40 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2019 CNX GAS CO LLC Produced Fluid 200.50 Bbl REUSE (AT WELL PAD)
2019 CNX GAS CO LLC Produced Fluid 36.73 Bbl INJECTION DISPOSAL WELL 34-119-28803
2019 CNX GAS CO LLC Produced Fluid 121.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 CNX GAS CO LLC Other Oil & Gas Wastes 1.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 CNX GAS CO LLC Other Oil & Gas Wastes 9.20 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2019 CNX GAS CO LLC Produced Fluid 121.87 Bbl INJECTION DISPOSAL WELL 34-157-25511
2019 CNX GAS CO LLC Other Oil & Gas Wastes 89.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 CNX GAS CO LLC Produced Fluid 664.34 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 CNX GAS CO LLC Produced Fluid 1,947.55 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2300193 Primary Facility 2014-08-15 Drilling/Alteration No Violations Noted CONDUCTOR SET 40' OF 30" CASING. TOP HOLE RIGS ARE ON SITE DRILLING TOP HOLE SETS.
2304646 Primary Facility 2014-07-17 Routine/Complete Inspection No Violations Noted Well not drilled. Pre-spud site inspection.
2362858 Primary Facility 2015-03-10 Routine/Complete Inspection No Violations Noted Well drilled to TD. Well waiting to be fracked.
2408455 Primary Facility 2015-09-16 Routine/Complete Inspection No Violations Noted Hydraulic fracturing completed on well. Operator setting up for flow back operations.
2414568 Primary Facility 2015-10-01 Routine/Complete Inspection No Violations Noted Well drilled to completion and hydraulically fractured and being prepared to be placed into production.
2464045 Primary Facility 2016-03-01 Routine/Complete Inspection No Violations Noted Well drilled, completed and in production. Well in compliance.
2742739 Primary Facility 2018-06-08 Routine/Complete Inspection No Violations Noted On May 8, 2019, the Department performed an inspection of the CNX, RHL23 well site. Present at time of the inspection was Dave Federick and William Roupe (CNX). The site is located in Richhill Twp., Greene Co. The inspection was related to a request by the operator to meet on site to review proposed minor modification to the ESCGP2 permit.

The access road and well pad are in good condition.

The operator has stabilized the cut slope of the access road with rock aprons at three locations along the access road. The minor modifications to the ESCGP2 permit was reviewed and approved by the Department in the field.

10 wells have been drilled to completion on site and are equipped for production.

2818174 Primary Facility 2018-12-18 Routine/Complete Inspection No Violations Noted On December 18, 2018, the Department performed an inspection of the CNX RHL-23 well pad site. Present at time of inspection was William Roupe, Dave Federick and Robert Basset (CNX). The site is located in Richhill Twp., Greene Co. The inspection was related to a request by the operator to terminate the ESCGP2 permit.

The well pad and access road are in good condition.

The site is stable with greater than 70% uniform, perennial vegetative growth. The operator has installed the PCSMs on the site, which appear to be functional. The operator will need to remove some excess access road gravel, and vegetation from Plunge Pool#3 (PCSM), along the access road. Given the conditions of the site, and completion of the maintenance on Plunge Pool#3, the Department recommends termination of the ESGP2 permit.

10 wells have been drilled to completion and are equipped for production on the well pad.

The GPUs on site are in secondary containment, but the operator will need to perform maintenance on the secondary conta

For data sources see[9]

References