If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-059-26594 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.913461,"lon":-80.272458,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Greene | |
Municipality: Center Township | |
Operator Name: EQT PROD CO | |
Well Pad ID: 148160 | |
Farm/Lease Name: D THARP 591713 | |
License Status: Active | |
Spud Date: 2014-07-17 | |
Permit Date: 2014-07-02 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 39.913461 | |
Longitude: -80.272458 |
Date | Event |
---|---|
2014-07-02 | New Permit Application |
2014-07-17 | Performed Spud Operation |
2014-09-11 | New Permit Application |
2014-12-28 | Drilling Completion |
2015-04-06 | Performed Stage 1 of Stimulation |
2015-04-07 | Perforation |
2015-04-07 | Performed Stage 1 of Stimulation |
2015-04-07 | Performed Stage 2 of Stimulation |
2015-04-07 | Performed Stage 3 of Stimulation |
2015-04-07 | Performed Stage 4 of Stimulation |
2015-04-07 | Performed Stage 5 of Stimulation |
2015-04-08 | Perforation |
2015-04-08 | Performed Stage 6 of Stimulation |
2015-04-08 | Performed Stage 7 of Stimulation |
2015-04-08 | Performed Stage 8 of Stimulation |
2015-04-08 | Performed Stage 9 of Stimulation |
2015-04-09 | Perforation |
2015-04-09 | Performed Stage 10 of Stimulation |
2015-04-09 | Performed Stage 11 of Stimulation |
2015-04-09 | Performed Stage 12 of Stimulation |
2015-04-09 | Performed Stage 13 of Stimulation |
2015-04-10 | Perforation |
2015-04-10 | Performed Stage 14 of Stimulation |
2015-04-10 | Performed Stage 15 of Stimulation |
2015-04-10 | Performed Stage 16 of Stimulation |
2015-04-10 | Performed Stage 17 of Stimulation |
2015-04-10 | Performed Stage 18 of Stimulation |
2015-04-11 | Perforation |
2015-04-11 | Performed Stage 19 of Stimulation |
2015-04-11 | Performed Stage 20 of Stimulation |
2015-04-11 | Performed Stage 21 of Stimulation |
2015-04-11 | Performed Stage 22 of Stimulation |
2015-04-11 | Performed Stage 23 of Stimulation |
2015-04-11 | Performed Stage 24 of Stimulation |
2015-04-12 | Perforation |
2015-04-12 | Performed Stage 25 of Stimulation |
2015-04-12 | Performed Stage 26 of Stimulation |
2015-04-12 | Performed Stage 27 of Stimulation |
2015-04-12 | Performed Stage 28 of Stimulation |
2015-04-12 | Performed Stage 29 of Stimulation |
2015-04-13 | Perforation |
2015-04-13 | Performed Stage 30 of Stimulation |
2015-04-13 | Performed Stage 31 of Stimulation |
2015-04-13 | Performed Stage 32 of Stimulation |
2015-04-13 | Performed Stage 33 of Stimulation |
2015-04-13 | Performed Stage 34 of Stimulation |
2015-04-13 | Performed Stage 35 of Stimulation |
2015-04-14 | Perforation |
2015-04-14 | Performed Stage 36 of Stimulation |
2015-04-14 | Performed Stage 37 of Stimulation |
2015-04-14 | Performed Stage 38 of Stimulation |
2015-04-14 | Performed Stage 39 of Stimulation |
2015-04-14 | Performed Stage 40 of Stimulation |
2015-04-15 | Perforation |
2015-04-15 | Performed Stage 41 of Stimulation |
2015-04-15 | Performed Stage 42 of Stimulation |
2015-04-15 | Performed Stage 43 of Stimulation |
2015-04-15 | Performed Stage 44 of Stimulation |
2015-04-15 | Performed Stage 45 of Stimulation |
2015-04-15 | Performed Stage 46 of Stimulation |
2015-04-16 | Perforation |
2015-04-16 | Performed Stage 47 of Stimulation |
2015-04-16 | Performed Stage 48 of Stimulation |
2015-04-16 | Performed Stage 49 of Stimulation |
2015-04-16 | Performed Stage 50 of Stimulation |
2015-04-16 | Performed Stage 51 of Stimulation |
2015-04-16 | Performed Stage 52 of Stimulation |
2015-04-16 | Performed Stage 53 of Stimulation |
2015-04-17 | Perforation |
2015-04-17 | Performed Stage 54 of Stimulation |
2015-04-17 | Performed Stage 55 of Stimulation |
2016-04-06 | Perforation |
2016-04-07 | Perforation |
2016-07-11 | Deviated |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-04-06 | 2015-04-17 | 7,501 | 12,538,700 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | LEB-10X | Keane Group | Gel Breaker | Ethylene Glycol | 107-21-1 | 30 | 0.000107179 | 124.464 |
AI 600 | Keane Group | Corrosion Inhibitor | Ethylene Glycol | 107-21-1 | 60 | 0.00041332 | 479.978 | |
Isopropyl alcohol | 67-63-0 | 7 | 0.00004822 | 55.997 | ||||
Triethyl Phosphate | 78-40-0 | 7 | 0.00004822 | 55.997 | ||||
Tar bases, quinoline derivs, benzyl chloride-quatemized | 72480-70-7 | 13 | 0.00008955 | 103.995 | ||||
Ethoxylated Nonylphenol | 68412-54-4 | 10 | 0.00006889 | 79.996 | ||||
2-Butoxyenthanol | 111-76-2 | 7 | 0.00004822 | 55.997 | ||||
Cinnamiaidehyde | 104-55-2 | 10 | 0.00006889 | 79.996 | ||||
N, N-Dimethyiformamide | 68-12-2 | 40 | 0.000275547 | 319.985 | ||||
MC MX 437-5 | Multi-Chem | Calcium Nitrate Solution | Calcium nitrate | 10124-37-5 | 60 | 0.0570125 | 66207.1 | |
Hydrochloric Acid (15%) | Keane Group | Acidizing | Hydrochloric Acid | 7647-01-0 | 15 | 0.040991 | 47601.7 | |
Nalco EC6330A | Keane Group | Scale inhibitor | Ethylene glycol | 107-21-1 | 5 | 0.0012855 | 1492.81 | |
Sodium phosphate, tribasic | 7601-54-9 | 5 | 0.0012855 | 1492.81 | ||||
Water | Keane Group | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 90.1039 | 104,635,000.0 | |
NALCO FFR730 | Keane Group | Friction reducer | Oxylkylated alcohol A | Proprietary | 5 | 0.00378533 | 4395.8 | |
Greenskeeper LF | Keane Group | Solvent | Distillates, petroleum, hydrotreated light | 64742-47-8 | 100 | 0.0027732 | 3220.44 | |
Sand (Proppant) | Keane Group | Proppant | Silica Substrate | 14808-60-7 | 100 | 9.42258 | 10,942,200.0 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2015-04-06 | 1 | NONE | 1,439,046 | 8,141 | 9,921 |
2015-04-07 | 2 | SAND | 1,439,046 | 8,794 | 9,010 |
2015-04-07 | 3 | SAND | 1,439,046 | 8,850 | 9,123 |
2015-04-07 | 4 | SAND | 1,439,046 | 8,586 | 8,780 |
2015-04-07 | 5 | SAND | 1,439,046 | 8,697 | 8,981 |
2015-04-08 | 6 | SAND | 1,439,046 | 8,783 | 9,110 |
2015-04-08 | 7 | SAND | 1,439,046 | 8,831 | 9,077 |
2015-04-08 | 8 | SAND | 1,439,046 | 8,718 | 8,917 |
2015-04-08 | 9 | SAND | 1,439,046 | 8,671 | 9,018 |
2015-04-09 | 10 | SAND | 1,439,046 | 8,747 | 8,970 |
2015-04-09 | 11 | SAND | 1,439,046 | 8,727 | 9,013 |
2015-04-09 | 12 | SAND | 1,439,046 | 8,738 | 8,942 |
2015-04-09 | 13 | SAND | 1,439,046 | 8,560 | 8,998 |
2015-04-10 | 14 | SAND | 1,439,046 | 8,619 | 8,909 |
2015-04-10 | 15 | SAND | 1,439,046 | 8,581 | 8,754 |
2015-04-10 | 16 | SAND | 1,439,046 | 8,716 | 9,090 |
2015-04-10 | 17 | SAND | 1,439,046 | 8,693 | 9,136 |
2015-04-10 | 18 | SAND | 1,439,046 | 8,713 | 9,058 |
2015-04-11 | 19 | SAND | 1,439,046 | 8,707 | 9,042 |
2015-04-11 | 20 | SAND | 1,439,046 | 8,697 | 8,934 |
2015-04-11 | 21 | SAND | 1,439,046 | 8,484 | 9,164 |
2015-04-11 | 22 | SAND | 1,439,046 | 8,726 | 8,988 |
2015-04-11 | 23 | SAND | 1,439,046 | 8,634 | 9,015 |
2015-04-11 | 24 | SAND | 1,439,046 | 8,607 | 8,801 |
2015-04-12 | 25 | SAND | 1,439,046 | 8,777 | 8,999 |
2015-04-12 | 26 | SAND | 1,439,046 | 8,830 | 9,251 |
2015-04-12 | 27 | SAND | 1,439,046 | 8,818 | 9,320 |
2015-04-12 | 28 | SAND | 1,439,046 | 8,739 | 9,187 |
2015-04-12 | 29 | SAND | 1,439,046 | 8,586 | 9,036 |
2015-04-13 | 30 | SAND | 1,439,046 | 8,595 | 9,100 |
2015-04-13 | 31 | SAND | 1,439,046 | 8,604 | 9,067 |
2015-04-13 | 32 | SAND | 1,439,046 | 8,912 | 9,183 |
2015-04-13 | 33 | SAND | 1,439,046 | 8,872 | 9,236 |
2015-04-13 | 34 | SAND | 1,439,046 | 8,827 | 9,025 |
2015-04-13 | 35 | SAND | 1,439,046 | 8,808 | 9,152 |
2015-04-14 | 36 | SAND | 1,439,046 | 8,794 | 8,969 |
2015-04-14 | 37 | SAND | 1,439,046 | 8,402 | 9,483 |
2015-04-14 | 38 | SAND | 1,439,046 | 8,632 | 8,992 |
2015-04-14 | 39 | SAND | 1,439,046 | 8,413 | 8,974 |
2015-04-14 | 40 | SAND | 1,439,046 | 88,500 | 8,969 |
2015-04-15 | 41 | SAND | 1,439,046 | 8,589 | 8,904 |
2015-04-15 | 42 | SAND | 1,439,046 | 8,550 | 8,997 |
2015-04-15 | 43 | SAND | 1,439,046 | 8,427 | 8,781 |
2015-04-15 | 44 | SAND | 1,439,046 | 8,405 | 9,572 |
2015-04-15 | 45 | SAND | 1,439,046 | 5,310 | 9,129 |
2015-04-15 | 46 | SAND | 1,439,046 | 8,584 | 9,161 |
2015-04-16 | 47 | SAND | 1,439,046 | 8,579 | 9,042 |
2015-04-16 | 48 | SAND | 1,439,046 | 8,530 | 8,997 |
2015-04-16 | 49 | SAND | 1,439,046 | 8,493 | 8,801 |
2015-04-16 | 50 | SAND | 1,439,046 | 7,872 | 8,160 |
2015-04-16 | 51 | SAND | 1,439,046 | 7,558 | 7,835 |
2015-04-16 | 52 | SAND | 1,439,046 | 8,200 | 8,771 |
2015-04-16 | 53 | SAND | 1,439,046 | 8,252 | 8,805 |
2015-04-17 | 54 | SAND | 1,439,046 | 8,178 | 8,475 |
2015-04-17 | 55 | SAND | 1,439,046 | 8,052 | 8,248 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | EQT PROD CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | EQT PROD CO | 1,138,218.00 | 239 | 0.00 | 0 | 0.00 | 0 |
2016 | EQT PROD CO | 1,207,671.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | EQT PROD CO | 864,471.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | EQT PROD CO | 660,734.00 | 342 | 0.00 | 0 | 0.00 | 0 |
2019 | EQT PROD CO | 527,706.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | EQT PROD CO | Drill Cuttings | 1,351.00 Tons | LANDFILL | 100419 |
2014 | EQT PROD CO | Drilling Fluid Waste | 1,470.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | EQT PROD CO | Fracing Fluid Waste | 120.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | EQT PROD CO | Drilling Fluid Waste | 650.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | EQT PROD CO | Fracturing Fluid Waste | 119.00 Tons | LANDFILL | 100277 |
2015 | EQT PROD CO | Fracturing Fluid Waste | 24.00 Tons | LANDFILL | 101571 |
2015 | EQT PROD CO | Fracing Fluid Waste | 2,325.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2015 | EQT PROD CO | Fracing Fluid Waste | 9,393.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | EQT PROD CO | Produced Fluid | 48,269.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | EQT PROD CO | Fracturing Fluid Waste | 6.08 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2016 | EQT PROD CO | Other Oil & Gas Wastes | 112.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | EQT PROD CO | Produced Fluid | 110.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2016 | EQT PROD CO | Produced Fluid | 100.00 Bbl | INJECTION DISPOSAL WELL | 34-167-2-9543 |
2016 | EQT PROD CO | Produced Fluid | 110.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | EQT PROD CO | Produced Fluid | 26,266.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | EQT PROD CO | Other Oil & Gas Wastes | 120.00 Bbl | REUSE (AT WELL PAD) | |
2017 | EQT PROD CO | Produced Fluid | 2,020.00 Bbl | REUSE (AT WELL PAD) | |
2017 | EQT PROD CO | Produced Fluid | 655.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | EQT PROD CO | Produced Fluid | 110.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | |
2018 | EQT PROD CO | Other Oil & Gas Wastes | 43.64 Bbl | REUSE (AT WELL PAD) | |
2018 | EQT PROD CO | Produced Fluid | 63.30 Tons | RESIDUAL WASTE PROCESSING FACILITY | ODNR 2015-511 |
2018 | EQT PROD CO | Other Oil & Gas Wastes | 2.81 Tons | LANDFILL | 100419 |
2018 | EQT PROD CO | Produced Fluid | 376.46 Bbl | REUSE (AT WELL PAD) | |
2018 | EQT PROD CO | Other Oil & Gas Wastes | 226.05 Tons | RESIDUAL WASTE PROCESSING FACILITY | ODNR 2015-511 |
2018 | EQT PROD CO | Produced Fluid | 38.34 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018 | EQT PROD CO | Produced Fluid | 233.80 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | EQT PROD CO | Synthetic Liner Materials | 7.59 Tons | LANDFILL | 100419 |
2019 | EQT PROD CO | Produced Fluid | 69.63 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2019 | EQT PROD CO | Other Oil & Gas Wastes | 10.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019 | EQT PROD CO | Other Oil & Gas Wastes | 55.00 Bbl | REUSE (AT WELL PAD) | |
2019 | EQT PROD CO | Produced Fluid | 545.60 Bbl | REUSE (AT WELL PAD) | |
2019 | EQT PROD CO | Produced Fluid | 15.43 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2315903 | Primary Facility | 2014-08-04 | Routine/Complete Inspection | No Violations Noted | Conductor set. Well pad being stoned in preparation for drill rig to begin drilling. |
2320300 | Primary Facility | 2014-10-28 | Drilling/Alteration | No Violations Noted | CONDUCTOR SET 40' OF 26". |
2440398 | Primary Facility | 2015-01-14 | Administrative/File Review | Violation(s) Noted | |
2490057 | Primary Facility | 2016-06-01 | Routine/Complete Inspection | No Violations Noted | |
2490622 | Primary Facility | 2016-05-13 | Routine/Complete Inspection | No Violations Noted | A routine complete inspection of the Tharpe Gas Well Site located in Center Township, Greene County. No violations noted during the inspection. |
2521310 | Primary Facility | 2016-09-22 | Site Restoration | No Violations Noted | A site restoration inspection was conducted in response to an operator submittal of a notice of termination for the ESCGP-1 (ESX11-059-0019) which governed earth disturbance activities associated with the well site. |
2728938 | Primary Facility | 2018-05-11 | Routine/Complete Inspection | No Violations Noted | On Thursday, May 3, 2018, I conducted a routine-complete inspection at the Tharpe Gas Well Site located in Center Township, Greene County.
Gas well 591713 and the associated infrastructure appeared to be in good condition and functioning properly. The well was labelled. No violations were identified during the inspection. |
2813785 | Primary Facility | 2018-12-10 | Routine/Complete Inspection | No Violations Noted | On Monday December 10, 2018 I conducted a routine-complete inspection at the Tharpe Well Site located in Center Township, Greene County.
The gas well and the associated infrastructure appeared to be in good condition and functioning properly. The gas well was tagged with identification. No violations were identified during the inspection. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2440398 | 743242 | 01/14/2015 | 2015-01-14 | 78.65(3) - SITE RESTORATION - Owner or operator failed to submit a well site restoration report to the Department within 60 days after restoration of the well site. | Administrative |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
743242 | 333482 | NOV - Notice of Violation | |||||
743242 | 344095 | COA - Consent Order and Agreement | Comply/Closed | 2017-10-23 |
For data sources see[9]